What must the Borrower do to manage environmental and social risks?
What must the Borrower do to manage environmental and social risks?
- Ensure compliance only with host country requirements.
- Focus solely on the financial constraints of the project.
- Achieve the requirements of the ESSs throughout the project life cycle. (correct)
- Avoid any assessment of environmental and social impacts.
When there are differing requirements between host country standards and the EHSGs, what is the Borrower's obligation?
When there are differing requirements between host country standards and the EHSGs, what is the Borrower's obligation?
- Choose the most cost-effective option available.
- Achieve whichever requirements are less stringent.
- Implement the more stringent standards from either the EHSGs or the host country requirements. (correct)
- Always follow the EHSGs regardless of host country standards.
What must the Borrower provide if they propose less stringent levels than the EHSGs?
What must the Borrower provide if they propose less stringent levels than the EHSGs?
- A formal agreement with the host country.
- A full report on their financial status.
- Evidence that all stakeholders agree with the decision.
- A detailed justification for the alternatives proposed. (correct)
Which of the following is NOT mentioned as a consideration for the Borrower when assessing project requirements?
Which of the following is NOT mentioned as a consideration for the Borrower when assessing project requirements?
What role does the Bank play regarding the Borrower's compliance with the ESSs?
What role does the Bank play regarding the Borrower's compliance with the ESSs?
What must the Borrower propose for disadvantaged or vulnerable individuals identified in the environmental and social assessment?
What must the Borrower propose for disadvantaged or vulnerable individuals identified in the environmental and social assessment?
What type of projects may require engagement with internationally recognized independent experts?
What type of projects may require engagement with internationally recognized independent experts?
In the case of multiple small subprojects, what must the Borrower carry out?
In the case of multiple small subprojects, what must the Borrower carry out?
What must the environmental and social assessment consider related to the primary suppliers?
What must the environmental and social assessment consider related to the primary suppliers?
What is a key requirement for projects identified as High Risk?
What is a key requirement for projects identified as High Risk?
How should adverse impacts of the project be managed for disadvantaged groups?
How should adverse impacts of the project be managed for disadvantaged groups?
What is noted about the environmental and social assessments of subprojects?
What is noted about the environmental and social assessments of subprojects?
What is the role of independent experts in relation to high-risk projects?
What is the role of independent experts in relation to high-risk projects?
What is required when a project likely has sectoral or regional impacts?
What is required when a project likely has sectoral or regional impacts?
What type of impact occurs contemporaneously in the location of the project?
What type of impact occurs contemporaneously in the location of the project?
Which aspect must be included in the Borrower's ES Framework?
Which aspect must be included in the Borrower's ES Framework?
What characterizes an indirect impact caused by a project?
What characterizes an indirect impact caused by a project?
Which phase of a project does NOT include environmental and social assessments?
Which phase of a project does NOT include environmental and social assessments?
What should be identified and discussed with the Borrower if there are inconsistencies in the ES Framework?
What should be identified and discussed with the Borrower if there are inconsistencies in the ES Framework?
What factors may determine the relevance of the Borrower’s ES Framework for a project?
What factors may determine the relevance of the Borrower’s ES Framework for a project?
Which of the following is NOT a component of environmental and social risk assessments?
Which of the following is NOT a component of environmental and social risk assessments?
What is the primary purpose of baseline data in environmental assessments?
What is the primary purpose of baseline data in environmental assessments?
Which operational policies are considered for projects on international waterways?
Which operational policies are considered for projects on international waterways?
What is the Borrower's responsibility regarding environmental and social risks during the project life cycle?
What is the Borrower's responsibility regarding environmental and social risks during the project life cycle?
What aspect is discussed regarding the accuracy of baseline data?
What aspect is discussed regarding the accuracy of baseline data?
What may the Borrower agree to use to address the project's risks and impacts?
What may the Borrower agree to use to address the project's risks and impacts?
What does an Environmental and Social Impact Assessment (ESIA) include?
What does an Environmental and Social Impact Assessment (ESIA) include?
If the Borrower is not the entity implementing the project, what is still their responsibility?
If the Borrower is not the entity implementing the project, what is still their responsibility?
Which of the following is a key requirement for projects in disputed areas?
Which of the following is a key requirement for projects in disputed areas?
What aspect is crucial in managing environmental and social risks?
What aspect is crucial in managing environmental and social risks?
What should be consistent with the objectives of the ESSs?
What should be consistent with the objectives of the ESSs?
What should the ESIA assess regarding data quality?
What should the ESIA assess regarding data quality?
What significance does the executive summary of the ESIA hold?
What significance does the executive summary of the ESIA hold?
How should a Borrower manage potential project risks?
How should a Borrower manage potential project risks?
What is essential to understand regarding the project's physical, biological, and socioeconomic conditions?
What is essential to understand regarding the project's physical, biological, and socioeconomic conditions?
What must the Borrower ensure regarding the timeline for the project?
What must the Borrower ensure regarding the timeline for the project?
What can the Borrower do if they find it appropriate during project development?
What can the Borrower do if they find it appropriate during project development?
What should be assessed regarding the acceptability of residual negative impacts?
What should be assessed regarding the acceptability of residual negative impacts?
Which aspect is critical in identifying differentiated measures for project impacts?
Which aspect is critical in identifying differentiated measures for project impacts?
What should the record specify regarding stakeholder engagement?
What should the record specify regarding stakeholder engagement?
Under what conditions should the feasibility of proposed mitigation measures be assessed?
Under what conditions should the feasibility of proposed mitigation measures be assessed?
Which framework is NOT explicitly mentioned as relevant to project obligations?
Which framework is NOT explicitly mentioned as relevant to project obligations?
What type of impacts should be considered when implementing mitigation measures?
What type of impacts should be considered when implementing mitigation measures?
What is necessary for the training and monitoring requirements for mitigation measures?
What is necessary for the training and monitoring requirements for mitigation measures?
What determines the suitability of proposed mitigation measures?
What determines the suitability of proposed mitigation measures?
What is required of the Borrower when host country requirements differ from the EHSGs?
What is required of the Borrower when host country requirements differ from the EHSGs?
What must the Borrower provide when proposing less stringent levels than those in the EHSGs?
What must the Borrower provide when proposing less stringent levels than those in the EHSGs?
In what manner must the Borrower manage environmental and social risks throughout the project life cycle?
In what manner must the Borrower manage environmental and social risks throughout the project life cycle?
Which of the following may be a consideration for the Borrower when assessing project requirements?
Which of the following may be a consideration for the Borrower when assessing project requirements?
What is the main focus of the environmental and social assessment conducted by the Borrower?
What is the main focus of the environmental and social assessment conducted by the Borrower?
What does cumulative impact refer to in a project context?
What does cumulative impact refer to in a project context?
What role does the Borrower play in assessing cumulative impacts?
What role does the Borrower play in assessing cumulative impacts?
When should the potential cumulative impacts be determined by the Borrower?
When should the potential cumulative impacts be determined by the Borrower?
How can cumulative impacts of a project be characterized?
How can cumulative impacts of a project be characterized?
What type of studies are required from the Borrower regarding cumulative impacts?
What type of studies are required from the Borrower regarding cumulative impacts?
What is the primary focus of the environmental and social assessment carried out by the Borrower?
What is the primary focus of the environmental and social assessment carried out by the Borrower?
What should the Borrower do if the environmental and social assessment identifies gaps in their ES Framework?
What should the Borrower do if the environmental and social assessment identifies gaps in their ES Framework?
What does the environmental and social assessment need to consider throughout the project lifecycle?
What does the environmental and social assessment need to consider throughout the project lifecycle?
How will the Bank respond if the Borrower opts to utilize the Borrower’s ES Framework?
How will the Bank respond if the Borrower opts to utilize the Borrower’s ES Framework?
What will the Borrower do based on the results of the monitoring process?
What will the Borrower do based on the results of the monitoring process?
What should be assessed in relation to the Borrower's ES Framework?
What should be assessed in relation to the Borrower's ES Framework?
What action should the Borrower take regarding information provided to the Bank?
What action should the Borrower take regarding information provided to the Bank?
What is the purpose of the environmental and social assessment conducted by the Borrower?
What is the purpose of the environmental and social assessment conducted by the Borrower?
How is the environmental and social assessment characterized?
How is the environmental and social assessment characterized?
What is the role of the environmental and social assessment in relation to the project's life cycle?
What is the role of the environmental and social assessment in relation to the project's life cycle?
What type of impacts should the environmental and social assessment aim to identify?
What type of impacts should the environmental and social assessment aim to identify?
What action will the Borrower take if an incident occurs that has a significant adverse effect on the project?
What action will the Borrower take if an incident occurs that has a significant adverse effect on the project?
Who will be responsible for reviewing the reports related to the project's environmental and social aspects?
Who will be responsible for reviewing the reports related to the project's environmental and social aspects?
What does the Borrower incorporate into the amended ESCP after identifying corrective actions?
What does the Borrower incorporate into the amended ESCP after identifying corrective actions?
What primary means does the environmental and social assessment serve during project implementation?
What primary means does the environmental and social assessment serve during project implementation?
During project implementation, who may facilitate site visits by staff or consultants acting on behalf of the Bank?
During project implementation, who may facilitate site visits by staff or consultants acting on behalf of the Bank?
What must the Borrower's ES Framework specifically include?
What must the Borrower's ES Framework specifically include?
What type of Environmental Impact Assessment (EIA) is required when a project has regional impacts?
What type of Environmental Impact Assessment (EIA) is required when a project has regional impacts?
How is an indirect impact characterized in relation to a project?
How is an indirect impact characterized in relation to a project?
What aspects may determine the relevance of the Borrower’s ES Framework for a project?
What aspects may determine the relevance of the Borrower’s ES Framework for a project?
Which phase of a project typically involves consideration of environmental and social risks?
Which phase of a project typically involves consideration of environmental and social risks?
What is excluded from the definition of an indirect impact?
What is excluded from the definition of an indirect impact?
What is the primary function of an Environmental and Social Management Plan (ESMP)?
What is the primary function of an Environmental and Social Management Plan (ESMP)?
What does an Environmental and Social Management Framework (ESMF) primarily examine?
What does an Environmental and Social Management Framework (ESMF) primarily examine?
What does Strategic Environmental and Social Assessment (SESA) focus on?
What does Strategic Environmental and Social Assessment (SESA) focus on?
Which action is included in the ESMP implementation process?
Which action is included in the ESMP implementation process?
What type of project might require an Environmental and Social Management Framework (ESMF)?
What type of project might require an Environmental and Social Management Framework (ESMF)?
Which of the following is NOT a goal of the Environmental and Social Management Plan (ESMP)?
Which of the following is NOT a goal of the Environmental and Social Management Plan (ESMP)?
Which aspect is a key characteristic of the Strategic Environmental and Social Assessment (SESA)?
Which aspect is a key characteristic of the Strategic Environmental and Social Assessment (SESA)?
What regulatory aspects does the ESMP reflect?
What regulatory aspects does the ESMP reflect?
What is the first step in the mitigation hierarchy for environmental and social assessments?
What is the first step in the mitigation hierarchy for environmental and social assessments?
Which of the following is NOT considered a type of ecosystem service?
Which of the following is NOT considered a type of ecosystem service?
What should happen when avoidance of risks and impacts is not feasible?
What should happen when avoidance of risks and impacts is not feasible?
What is the final step in the mitigation hierarchy if significant residual impacts remain?
What is the final step in the mitigation hierarchy if significant residual impacts remain?
Which of these correctly describes provisioning services?
Which of these correctly describes provisioning services?
In terms of ecosystem services, which option deals with the benefits from ecosystem regulation?
In terms of ecosystem services, which option deals with the benefits from ecosystem regulation?
What is the objective of Good International Industry Practice (GIIP)?
What is the objective of Good International Industry Practice (GIIP)?
Which of the following actions would occur after minimizing or reducing risks in a project?
Which of the following actions would occur after minimizing or reducing risks in a project?
What method can the Borrower use to assess environmental and social risks?
What method can the Borrower use to assess environmental and social risks?
Which of the following is NOT a tool for environmental assessment mentioned in the context?
Which of the following is NOT a tool for environmental assessment mentioned in the context?
What should the Borrower do if there are significant changes in their ES Framework?
What should the Borrower do if there are significant changes in their ES Framework?
What is the purpose of conducting stakeholder engagement?
What is the purpose of conducting stakeholder engagement?
What must the Borrower do if their ES Framework is inconsistent with project requirements?
What must the Borrower do if their ES Framework is inconsistent with project requirements?
What is an 'Associated Facility' in the context of a project?
What is an 'Associated Facility' in the context of a project?
Which of the following is a component of the Borrower's environmental and social management framework?
Which of the following is a component of the Borrower's environmental and social management framework?
What does the Borrower need to reflect when using appropriate methods and tools for project assessment?
What does the Borrower need to reflect when using appropriate methods and tools for project assessment?
Which action must the Borrower take regarding stakeholder engagement?
Which action must the Borrower take regarding stakeholder engagement?
Which type of analysis is recommended for understanding social conflicts related to the project?
Which type of analysis is recommended for understanding social conflicts related to the project?
What is the purpose of developing an Environmental and Social Commitment Plan (ESCP)?
What is the purpose of developing an Environmental and Social Commitment Plan (ESCP)?
What type of performance must the Borrower monitor and report on?
What type of performance must the Borrower monitor and report on?
In what manner should stakeholder engagement be conducted?
In what manner should stakeholder engagement be conducted?
Which aspect is NOT a requirement for the Borrower before project initiation?
Which aspect is NOT a requirement for the Borrower before project initiation?
What is a key factor for the viability of associated facilities?
What is a key factor for the viability of associated facilities?
What does the Borrower need to ensure regarding the project's scope?
What does the Borrower need to ensure regarding the project's scope?
What is one purpose of Environmental and Social Impact Assessment (ESIA)?
What is one purpose of Environmental and Social Impact Assessment (ESIA)?
Which of the following is a critical aspect assessed by social and conflict analysis?
Which of the following is a critical aspect assessed by social and conflict analysis?
What could be a negative impact of a project assessed by ESIA?
What could be a negative impact of a project assessed by ESIA?
In which situation might social and conflict analysis be especially crucial?
In which situation might social and conflict analysis be especially crucial?
What is an expected outcome from conducting an ESIA?
What is an expected outcome from conducting an ESIA?
What type of communities does social and conflict analysis evaluate?
What type of communities does social and conflict analysis evaluate?
What should be established to mitigate risks associated with social impacts?
What should be established to mitigate risks associated with social impacts?
What is a potential effect of project tensions as identified by social analysis?
What is a potential effect of project tensions as identified by social analysis?
What must the Borrower do to ensure effective monitoring of the project?
What must the Borrower do to ensure effective monitoring of the project?
Which actions must be taken prior to the approval by the Bank Board of Directors?
Which actions must be taken prior to the approval by the Bank Board of Directors?
What is a critical aspect that must be considered when developing management tools for the project?
What is a critical aspect that must be considered when developing management tools for the project?
Who is the Borrower expected to engage with as part of their monitoring responsibilities?
Who is the Borrower expected to engage with as part of their monitoring responsibilities?
What must be assessed regarding the gaps in the Borrower’s ES Framework?
What must be assessed regarding the gaps in the Borrower’s ES Framework?
What is emphasized for the project regarding stakeholder engagement?
What is emphasized for the project regarding stakeholder engagement?
In what capacity should actions be taken to comply with environmental and social standards?
In what capacity should actions be taken to comply with environmental and social standards?
What is the Borrower's responsibility towards project risks and impacts?
What is the Borrower's responsibility towards project risks and impacts?
What is the primary purpose of identifying mitigation measures in a project?
What is the primary purpose of identifying mitigation measures in a project?
Why is it essential to assess the feasibility of proposed mitigation measures?
Why is it essential to assess the feasibility of proposed mitigation measures?
How should adverse impacts on disadvantaged groups be managed?
How should adverse impacts on disadvantaged groups be managed?
What should the record document regarding stakeholder engagement?
What should the record document regarding stakeholder engagement?
What factors should be included when assessing the acceptability of residual negative impacts?
What factors should be included when assessing the acceptability of residual negative impacts?
Which aspect is crucial for evaluating the suitability of mitigation measures?
Which aspect is crucial for evaluating the suitability of mitigation measures?
What should be contained in the national environmental or social action plans?
What should be contained in the national environmental or social action plans?
Why is it important to consider variations in country conditions when assessing a project?
Why is it important to consider variations in country conditions when assessing a project?
What is the definition of cumulative impact in the context of the project?
What is the definition of cumulative impact in the context of the project?
What must the Borrower provide to assess the cumulative impacts effectively?
What must the Borrower provide to assess the cumulative impacts effectively?
Why are cumulative impacts recognized as important?
Why are cumulative impacts recognized as important?
At what stage should potential cumulative impacts be determined?
At what stage should potential cumulative impacts be determined?
What role does scientific concern play in assessing cumulative impacts?
What role does scientific concern play in assessing cumulative impacts?
What is the primary goal of an Environmental and Social Impact Assessment (ESIA)?
What is the primary goal of an Environmental and Social Impact Assessment (ESIA)?
Which of the following aspects does social and conflict analysis evaluate?
Which of the following aspects does social and conflict analysis evaluate?
What should be identified to ensure that adverse impacts do not disproportionately affect vulnerable groups?
What should be identified to ensure that adverse impacts do not disproportionately affect vulnerable groups?
Under what conditions may social and conflict analysis be especially critical?
Under what conditions may social and conflict analysis be especially critical?
Which element is assessed to determine the feasibility of the proposed mitigation measures?
Which element is assessed to determine the feasibility of the proposed mitigation measures?
What must be included in the record of stakeholder engagement?
What must be included in the record of stakeholder engagement?
What is one possible negative effect of a proposed project identified by an ESIA?
What is one possible negative effect of a proposed project identified by an ESIA?
What should be assessed regarding residual negative impacts that cannot be mitigated?
What should be assessed regarding residual negative impacts that cannot be mitigated?
What does the management and monitoring aspect of ESIA involve?
What does the management and monitoring aspect of ESIA involve?
Which of the following is NOT a factor in determining the suitability of proposed mitigation measures?
Which of the following is NOT a factor in determining the suitability of proposed mitigation measures?
What element is integrated in social and conflict analysis as mandated by ESS1?
What element is integrated in social and conflict analysis as mandated by ESS1?
What should be considered in relation to the country's policy framework when addressing environmental and social issues?
What should be considered in relation to the country's policy framework when addressing environmental and social issues?
Which aspect does not belong to the focus of Environmental and Social Impact Assessment (ESIA)?
Which aspect does not belong to the focus of Environmental and Social Impact Assessment (ESIA)?
What is one effect that project assessments aim to evaluate regarding community relations?
What is one effect that project assessments aim to evaluate regarding community relations?
Which aspect of proposed mitigation measures relates to their applicability in local contexts?
Which aspect of proposed mitigation measures relates to their applicability in local contexts?
What is essential for assessing variations in country conditions related to environmental and social issues?
What is essential for assessing variations in country conditions related to environmental and social issues?
What must the environmental and social assessment analyze regarding the project?
What must the environmental and social assessment analyze regarding the project?
Which aspect is included in the environmental and social risks and impacts analysis?
Which aspect is included in the environmental and social risks and impacts analysis?
What does the assessment aim to identify regarding the Borrower's framework?
What does the assessment aim to identify regarding the Borrower's framework?
Which paragraph specifies consideration of risks and impacts during the environmental and social assessment?
Which paragraph specifies consideration of risks and impacts during the environmental and social assessment?
What is the role of the Borrower in relation to disadvantaged groups as part of the assessment?
What is the role of the Borrower in relation to disadvantaged groups as part of the assessment?
What types of risks does the assessment consider specifically in relation to the project context?
What types of risks does the assessment consider specifically in relation to the project context?
What must be ensured regarding the Borrower's environmental and social framework?
What must be ensured regarding the Borrower's environmental and social framework?
What does the environmental and social assessment specifically include as outlined in ESS1?
What does the environmental and social assessment specifically include as outlined in ESS1?
What is the purpose of the environmental and social assessment undertaken by the Borrower?
What is the purpose of the environmental and social assessment undertaken by the Borrower?
Who is responsible for reviewing the environmental and social assessment reports?
Who is responsible for reviewing the environmental and social assessment reports?
How should the Borrower handle identified corrective and preventive actions?
How should the Borrower handle identified corrective and preventive actions?
What does the environmental and social assessment primarily inform?
What does the environmental and social assessment primarily inform?
What action is the Borrower required to take if a significant incident occurs related to the project?
What action is the Borrower required to take if a significant incident occurs related to the project?
What is a key aspect of the flexibility of the environmental and social assessment process?
What is a key aspect of the flexibility of the environmental and social assessment process?
What aspect of the project life cycle does the Borrower monitor and report on?
What aspect of the project life cycle does the Borrower monitor and report on?
What should be minimized, reduced, or mitigated according to the Borrower's responsibilities?
What should be minimized, reduced, or mitigated according to the Borrower's responsibilities?
Which criteria must be met for facilities or activities to be classified as Associated Facilities?
Which criteria must be met for facilities or activities to be classified as Associated Facilities?
What must the Borrower demonstrate when unable to influence Associated Facilities?
What must the Borrower demonstrate when unable to influence Associated Facilities?
How does the Bank assess the potential environmental and social risks of a project?
How does the Bank assess the potential environmental and social risks of a project?
What should the Borrower consider regarding the ES Framework when preparing a project proposal?
What should the Borrower consider regarding the ES Framework when preparing a project proposal?
What action must the Borrower take concerning potential project risks?
What action must the Borrower take concerning potential project risks?
What is considered an important factor in establishing the timeframe for project development?
What is considered an important factor in establishing the timeframe for project development?
Why is baseline data crucial in environmental assessments?
Why is baseline data crucial in environmental assessments?
What is the primary focus of a Regional Environmental and Social Impact Assessment (ESIA)?
What is the primary focus of a Regional Environmental and Social Impact Assessment (ESIA)?
Which of the following is NOT a consideration during the environmental and social assessment phase?
Which of the following is NOT a consideration during the environmental and social assessment phase?
In what situation might there be a conflict of interest in carrying out environmental and social assessments?
In what situation might there be a conflict of interest in carrying out environmental and social assessments?
What must the Borrower provide if the environmental and social assessment does not include site-specific analyses?
What must the Borrower provide if the environmental and social assessment does not include site-specific analyses?
What aspect of environmental and social assessments receives particular attention in a Regional ESIA?
What aspect of environmental and social assessments receives particular attention in a Regional ESIA?
What is one aspect that the environmental and social assessment must account for?
What is one aspect that the environmental and social assessment must account for?
Which type of risks and impacts must the environmental and social assessment include?
Which type of risks and impacts must the environmental and social assessment include?
What is a key requirement for assessing project impacts on vulnerable groups?
What is a key requirement for assessing project impacts on vulnerable groups?
What should the Borrower ensure regarding ecosystem services?
What should the Borrower ensure regarding ecosystem services?
What is involved in the environmental and social assessment related to community safety?
What is involved in the environmental and social assessment related to community safety?
In what scenario must independent specialists be retained for the assessment?
In what scenario must independent specialists be retained for the assessment?
What should be included regarding climate change in the environmental and social assessment?
What should be included regarding climate change in the environmental and social assessment?
What factor may influence the national environmental or social studies included in the assessment?
What factor may influence the national environmental or social studies included in the assessment?
Which aspect is addressed when evaluating potential social impacts?
Which aspect is addressed when evaluating potential social impacts?
What should be completed before the Borrower carries out activities related to the project?
What should be completed before the Borrower carries out activities related to the project?
What can the Borrower agree to rely on when assessing and managing environmental and social risks?
What can the Borrower agree to rely on when assessing and managing environmental and social risks?
What does the Borrower need to ensure regarding project benefits and access?
What does the Borrower need to ensure regarding project benefits and access?
What must the Borrower implement for existing activities that do not meet the requirements of the ESSs?
What must the Borrower implement for existing activities that do not meet the requirements of the ESSs?
If Associated Facilities are funded by other agencies, what requirement must be met?
If Associated Facilities are funded by other agencies, what requirement must be met?
What is a potential outcome if the Borrower does not adhere to the ESCP regarding harmful activities?
What is a potential outcome if the Borrower does not adhere to the ESCP regarding harmful activities?
What is essential for the Borrower to do before agreeing to use the requirements of other funding agencies?
What is essential for the Borrower to do before agreeing to use the requirements of other funding agencies?
In what situation would the Borrower NOT perform any activities until specific measures are completed?
In what situation would the Borrower NOT perform any activities until specific measures are completed?
What aspect of the project does the Borrower need to evaluate when agreements are made with the Bank about the existing facilities?
What aspect of the project does the Borrower need to evaluate when agreements are made with the Bank about the existing facilities?
What is the primary action the Borrower must take regarding the ESCP implementation?
What is the primary action the Borrower must take regarding the ESCP implementation?
What is the role of the Bank concerning project monitoring?
What is the role of the Bank concerning project monitoring?
What can the Borrower include in a project to enhance its capacity?
What can the Borrower include in a project to enhance its capacity?
How should the Borrower modify the ESCP based on project assessments?
How should the Borrower modify the ESCP based on project assessments?
What should be assessed to determine the acceptability of residual negative impacts?
What should be assessed to determine the acceptability of residual negative impacts?
What should the environmental and social assessment detail regarding the project?
What should the environmental and social assessment detail regarding the project?
What is required when considering adverse impacts on disadvantaged or vulnerable groups?
What is required when considering adverse impacts on disadvantaged or vulnerable groups?
Which aspect of project monitoring is important for the Borrower?
Which aspect of project monitoring is important for the Borrower?
Which of the following aspects is required in the environmental and social assessment?
Which of the following aspects is required in the environmental and social assessment?
What is a requirement of the Borrower when performing environmental and social assessments?
What is a requirement of the Borrower when performing environmental and social assessments?
What action may the Bank take if the Borrower lacks adequate capacity?
What action may the Bank take if the Borrower lacks adequate capacity?
What should the Borrower include while assessing implementation of mitigation measures?
What should the Borrower include while assessing implementation of mitigation measures?
In assessing environmental impacts, what kind of costs must be evaluated?
In assessing environmental impacts, what kind of costs must be evaluated?
In the context of project obligations, what should the Borrower ensure about the ESCP?
In the context of project obligations, what should the Borrower ensure about the ESCP?
What must be included in the Borrower's project related to suppliers?
What must be included in the Borrower's project related to suppliers?
What institutional capability is necessary for the effective implementation of environmental and social measures?
What institutional capability is necessary for the effective implementation of environmental and social measures?
What aspect does the environmental and social assessment primarily focus on?
What aspect does the environmental and social assessment primarily focus on?
What type of considerations should the Borrower take into account during assessments?
What type of considerations should the Borrower take into account during assessments?
Which factor should influence the Borrower's monitoring and reporting?
Which factor should influence the Borrower's monitoring and reporting?
Which project element signifies the Borrower's commitment to environmental and social standards?
Which project element signifies the Borrower's commitment to environmental and social standards?
What factor should be taken into account concerning country conditions during project assessment?
What factor should be taken into account concerning country conditions during project assessment?
What types of impacts should the environmental and social assessment examine?
What types of impacts should the environmental and social assessment examine?
What is a key aspect in the identification of mitigation measures for projects?
What is a key aspect in the identification of mitigation measures for projects?
How should stakeholder engagement be documented for environmental assessments?
How should stakeholder engagement be documented for environmental assessments?
What approach must the Borrower adopt to manage environmental and social risks?
What approach must the Borrower adopt to manage environmental and social risks?
Which of the following actions is NOT included in the mitigation hierarchy approach?
Which of the following actions is NOT included in the mitigation hierarchy approach?
What is required from the Borrower when significant residual impacts remain after mitigating risks?
What is required from the Borrower when significant residual impacts remain after mitigating risks?
In a scenario where the Bank involves other funding agencies, what must the Borrower ensure?
In a scenario where the Bank involves other funding agencies, what must the Borrower ensure?
What must the common approach agreed upon with other agencies achieve?
What must the common approach agreed upon with other agencies achieve?
What defines the required cooperation between the Borrower and the Bank?
What defines the required cooperation between the Borrower and the Bank?
What must occur if avoidance of risks is not possible?
What must occur if avoidance of risks is not possible?
Which condition must be met when applying a common approach for risk management?
Which condition must be met when applying a common approach for risk management?
What type of impact is expected to occur contemporaneously in the location of the project?
What type of impact is expected to occur contemporaneously in the location of the project?
Which of the following aspects must be included in the Borrower's Environmental and Social (ES) Framework?
Which of the following aspects must be included in the Borrower's Environmental and Social (ES) Framework?
Which statement best describes an indirect impact in the context of project evaluation?
Which statement best describes an indirect impact in the context of project evaluation?
What factor is critical for determining the relevance of the Borrower’s ES Framework for a project?
What factor is critical for determining the relevance of the Borrower’s ES Framework for a project?
Which of the following best describes a sectoral or regional Environmental Impact Assessment (EIA)?
Which of the following best describes a sectoral or regional Environmental Impact Assessment (EIA)?
What is the significance of understanding the project's physical, biological, and socioeconomic conditions?
What is the significance of understanding the project's physical, biological, and socioeconomic conditions?
What is required of the Borrower to ensure they meet the Environmental and Social Standards (ESSs)?
What is required of the Borrower to ensure they meet the Environmental and Social Standards (ESSs)?
When there is a conflict between host country requirements and the EHSGs, what should the Borrower implement?
When there is a conflict between host country requirements and the EHSGs, what should the Borrower implement?
What must the Borrower provide if they propose alternatives that are less stringent than the EHSGs?
What must the Borrower provide if they propose alternatives that are less stringent than the EHSGs?
In relation to project constraints, what factors might influence the Borrower's ability to meet the EHSGs?
In relation to project constraints, what factors might influence the Borrower's ability to meet the EHSGs?
What is the main objective of implementing the relevant requirements of the EHSGs in projects?
What is the main objective of implementing the relevant requirements of the EHSGs in projects?
What must the Borrower demonstrate regarding the performance level chosen for a project?
What must the Borrower demonstrate regarding the performance level chosen for a project?
What criteria must be met for facilities or activities to qualify as Associated Facilities?
What criteria must be met for facilities or activities to qualify as Associated Facilities?
What factors should the Borrower consider when assessing the extent of control over Associated Facilities?
What factors should the Borrower consider when assessing the extent of control over Associated Facilities?
When determining the timeframe for a project, what should the Bank consider?
When determining the timeframe for a project, what should the Bank consider?
What should the Borrower's actions address regarding environmental and social impacts?
What should the Borrower's actions address regarding environmental and social impacts?
How should the Borrower manage the project life cycle in relation to environmental and social risks?
How should the Borrower manage the project life cycle in relation to environmental and social risks?
What may affect the Borrower’s decision to use part or all of their ES Framework?
What may affect the Borrower’s decision to use part or all of their ES Framework?
What should the Borrower’s documentation specify regarding stakeholder engagement?
What should the Borrower’s documentation specify regarding stakeholder engagement?
What will the Bank consider when determining the support for a project?
What will the Bank consider when determining the support for a project?
Which activities are not subject to the World Bank Environmental and Social Policy for Investment Project Financing?
Which activities are not subject to the World Bank Environmental and Social Policy for Investment Project Financing?
How does the provision of a guarantee under OP 10.00 affect the application of ESSs?
How does the provision of a guarantee under OP 10.00 affect the application of ESSs?
What is a primary requirement for documents defining technical assistance activities?
What is a primary requirement for documents defining technical assistance activities?
Which of the following best describes the Bank's obligation regarding post-project activities?
Which of the following best describes the Bank's obligation regarding post-project activities?
What aspect of a project is essential for the Bank’s support according to the required policies?
What aspect of a project is essential for the Bank’s support according to the required policies?
What is necessary for the technical assistance activities planned by the Borrower?
What is necessary for the technical assistance activities planned by the Borrower?
What factor is critical in determining the scope of application for the ESSs in a project?
What factor is critical in determining the scope of application for the ESSs in a project?
What is a primary focus of Environmental and Social Impact Assessment (ESIA)?
What is a primary focus of Environmental and Social Impact Assessment (ESIA)?
Which of the following issues does social and conflict analysis primarily evaluate?
Which of the following issues does social and conflict analysis primarily evaluate?
In what circumstances may the negative effects of a project be heightened?
In what circumstances may the negative effects of a project be heightened?
What must an ESIA include when evaluating project alternatives?
What must an ESIA include when evaluating project alternatives?
How does an ESIA evaluate the potential social impacts of a project?
How does an ESIA evaluate the potential social impacts of a project?
Which element is critical in assessing social impacts of a project?
Which element is critical in assessing social impacts of a project?
What is an essential component of the management and monitoring measures following an ESIA?
What is an essential component of the management and monitoring measures following an ESIA?
Which of the following statements about social and conflict analysis is true?
Which of the following statements about social and conflict analysis is true?
Which annex included in ESS1 specifically relates to managing contractors involved in the project?
Which annex included in ESS1 specifically relates to managing contractors involved in the project?
What is required from the Borrower regarding the entities involved in implementing the project?
What is required from the Borrower regarding the entities involved in implementing the project?
Which statement most accurately describes the term 'project' as used in the context of ESS1?
Which statement most accurately describes the term 'project' as used in the context of ESS1?
What is the primary purpose of Annex 2 in ESS1?
What is the primary purpose of Annex 2 in ESS1?
How does ESS1 define the Borrower's responsibility towards contractors?
How does ESS1 define the Borrower's responsibility towards contractors?
What is a primary factor in assessing the financial feasibility of a project?
What is a primary factor in assessing the financial feasibility of a project?
Which local factor should be considered when implementing investment project finance?
Which local factor should be considered when implementing investment project finance?
Which agencies are likely to influence the approval process for investment project finance?
Which agencies are likely to influence the approval process for investment project finance?
What must a project measure include for the borrowing agency?
What must a project measure include for the borrowing agency?
What can significantly affect the viability of a project according to financial considerations?
What can significantly affect the viability of a project according to financial considerations?
What is the significance of cumulative impacts in a project assessment?
What is the significance of cumulative impacts in a project assessment?
How should the Borrower approach the assessment of cumulative impacts?
How should the Borrower approach the assessment of cumulative impacts?
What can influence whether the Borrower's ES Framework can effectively address project risks?
What can influence whether the Borrower's ES Framework can effectively address project risks?
What role do studies from reputable third parties play in project assessments?
What role do studies from reputable third parties play in project assessments?
When do potential cumulative impacts need to be determined during project development?
When do potential cumulative impacts need to be determined during project development?
What should be assessed concerning the acceptability of negative impacts that cannot be mitigated?
What should be assessed concerning the acceptability of negative impacts that cannot be mitigated?
Which factor should be considered when identifying differentiated measures to address project impacts?
Which factor should be considered when identifying differentiated measures to address project impacts?
What should the documentation specify regarding stakeholder engagement?
What should the documentation specify regarding stakeholder engagement?
Which of the following is NOT a consideration when implementing mitigation measures?
Which of the following is NOT a consideration when implementing mitigation measures?
What is important to assess regarding proposed mitigation measures?
What is important to assess regarding proposed mitigation measures?
What type of actions should be included in the national environmental or social action plans relevant to a project?
What type of actions should be included in the national environmental or social action plans relevant to a project?
Which aspect is essential when analyzing the institutional capabilities related to environmental issues?
Which aspect is essential when analyzing the institutional capabilities related to environmental issues?
What do obligations under relevant international treaties and agreements typically require from a country?
What do obligations under relevant international treaties and agreements typically require from a country?
What must the Borrower demonstrate regarding their influence over Associated Facilities?
What must the Borrower demonstrate regarding their influence over Associated Facilities?
Which factor is NOT considered by the Bank when establishing timelines for project development?
Which factor is NOT considered by the Bank when establishing timelines for project development?
What must the Borrower take into account according to the established requirements?
What must the Borrower take into account according to the established requirements?
What is necessary for facilities to be classified as Associated Facilities?
What is necessary for facilities to be classified as Associated Facilities?
What does the Borrower need to assess regarding environmental and social risks?
What does the Borrower need to assess regarding environmental and social risks?
Which of the following does the Bank consider in its evaluation of project support?
Which of the following does the Bank consider in its evaluation of project support?
What must the Borrower provide for effective project management?
What must the Borrower provide for effective project management?
What can influence the Borrower's assessment of project requirements?
What can influence the Borrower's assessment of project requirements?
What influences the scope and type of environmental and social assessment conducted by the Borrower?
What influences the scope and type of environmental and social assessment conducted by the Borrower?
In what situations may a hazard or risk assessment be required for a project?
In what situations may a hazard or risk assessment be required for a project?
How does the Borrower determine the process for conducting environmental and social assessments?
How does the Borrower determine the process for conducting environmental and social assessments?
What role does stakeholder engagement play in the environmental and social assessment process?
What role does stakeholder engagement play in the environmental and social assessment process?
Which of the following activities is part of the environmental and social assessment process?
Which of the following activities is part of the environmental and social assessment process?
What must be taken into account when defining the level of detail for environmental and social assessments?
What must be taken into account when defining the level of detail for environmental and social assessments?
What type of audit may be included within the environmental and social assessment for certain projects?
What type of audit may be included within the environmental and social assessment for certain projects?
What is one of the primary functions of the hazard or risk assessment?
What is one of the primary functions of the hazard or risk assessment?
What approach must the Borrower adopt to manage environmental and social risks effectively?
What approach must the Borrower adopt to manage environmental and social risks effectively?
What should the Borrower do if avoidance of risks and impacts is not feasible?
What should the Borrower do if avoidance of risks and impacts is not feasible?
What is required when significant residual impacts remain after mitigation?
What is required when significant residual impacts remain after mitigation?
When cooperating with other financing agencies, what must the Borrower achieve?
When cooperating with other financing agencies, what must the Borrower achieve?
What does the mitigation hierarchy approach emphasize as the first step?
What does the mitigation hierarchy approach emphasize as the first step?
In relation to Associated Facilities, what is the expectation for their compliance?
In relation to Associated Facilities, what is the expectation for their compliance?
What is a key condition for accepting a common approach in jointly financed projects?
What is a key condition for accepting a common approach in jointly financed projects?
What should occur after risks and impacts have been minimized or reduced?
What should occur after risks and impacts have been minimized or reduced?
What is the Borrower's responsibility when the risk rating of a subproject increases?
What is the Borrower's responsibility when the risk rating of a subproject increases?
Which of the following is a consideration in the environmental and social assessment?
Which of the following is a consideration in the environmental and social assessment?
In the context of environmental and social risks, what is often compromised if not carefully assessed?
In the context of environmental and social risks, what is often compromised if not carefully assessed?
What should the environmental and social assessment consider regarding global impacts?
What should the environmental and social assessment consider regarding global impacts?
When dealing with land titling, what unintended consequences should be avoided?
When dealing with land titling, what unintended consequences should be avoided?
Which aspect of a subproject may influence its classification as a High Risk?
Which aspect of a subproject may influence its classification as a High Risk?
What is a key factor in determining the relevance of the Borrower's ES Framework?
What is a key factor in determining the relevance of the Borrower's ES Framework?
What impact should the Borrower particularly assess regarding welfare?
What impact should the Borrower particularly assess regarding welfare?
What does the environmental and social assessment aim to evaluate regarding the project's potential?
What does the environmental and social assessment aim to evaluate regarding the project's potential?
Which factor is essential for the Borrower to consider while implementing the environmental and social risk management framework?
Which factor is essential for the Borrower to consider while implementing the environmental and social risk management framework?
What is the purpose of identifying project alternatives during the assessment?
What is the purpose of identifying project alternatives during the assessment?
What must the Borrower maintain throughout the project life cycle according to the environmental and social assessment?
What must the Borrower maintain throughout the project life cycle according to the environmental and social assessment?
Which action is the Borrower required to take in response to environmental and social impacts?
Which action is the Borrower required to take in response to environmental and social impacts?
What does the term 'capacity development issues' refer to for the Borrower?
What does the term 'capacity development issues' refer to for the Borrower?
What is an integral component of the environmental and social assessment process?
What is an integral component of the environmental and social assessment process?
How should adverse impacts be managed for the Borrower’s projects?
How should adverse impacts be managed for the Borrower’s projects?
What is the primary document that outlines the measures and actions for achieving compliance with environmental and social requirements by the Borrower?
What is the primary document that outlines the measures and actions for achieving compliance with environmental and social requirements by the Borrower?
Which of the following is included in the management tools that the Borrower will implement as part of the ESCP?
Which of the following is included in the management tools that the Borrower will implement as part of the ESCP?
What must the Borrower consider throughout the project lifecycle in relation to environmental and social assessments?
What must the Borrower consider throughout the project lifecycle in relation to environmental and social assessments?
Which phase emphasizes the early disclosure of the draft ESCP?
Which phase emphasizes the early disclosure of the draft ESCP?
Which element is NOT mentioned as a requirement of the ESCP?
Which element is NOT mentioned as a requirement of the ESCP?
What aspect of the project does the ESCP intend to address through its management systems?
What aspect of the project does the ESCP intend to address through its management systems?
How will the findings of environmental and social assessments affect the ESCP?
How will the findings of environmental and social assessments affect the ESCP?
What is a key purpose of the ESCP in relation to stakeholder engagement?
What is a key purpose of the ESCP in relation to stakeholder engagement?
What must the Borrower regularly report to the Bank regarding project monitoring?
What must the Borrower regularly report to the Bank regarding project monitoring?
How frequently must the Borrower disclose monitoring results to the Bank?
How frequently must the Borrower disclose monitoring results to the Bank?
What is the main purpose of monitoring in relation to environmental and social risks?
What is the main purpose of monitoring in relation to environmental and social risks?
What should be documented and disclosed if there are significant changes in a project?
What should be documented and disclosed if there are significant changes in a project?
Which of the following is a requirement for High Risk and Substantial Risk projects?
Which of the following is a requirement for High Risk and Substantial Risk projects?
What is the Borrower required to utilize to address the project's risks and impacts?
What is the Borrower required to utilize to address the project's risks and impacts?
What does the Borrower's documentation need to include prior to project appraisal?
What does the Borrower's documentation need to include prior to project appraisal?
What is critical in establishing operational controls for monitoring project compliance?
What is critical in establishing operational controls for monitoring project compliance?
What must the Borrower do if significant changes are made to their ES Framework?
What must the Borrower do if significant changes are made to their ES Framework?
Which method is used by the Borrower to manage project risks and impacts?
Which method is used by the Borrower to manage project risks and impacts?
What is NOT considered a method for assessing environmental and social risks according to the Borrower's obligations?
What is NOT considered a method for assessing environmental and social risks according to the Borrower's obligations?
What should the Borrower propose if the ES Framework changes significantly?
What should the Borrower propose if the ES Framework changes significantly?
Which tool helps in identifying and assessing potential environmental and social impacts?
Which tool helps in identifying and assessing potential environmental and social impacts?
What is an important aspect to reflect upon in the assessment methods used by the Borrower?
What is an important aspect to reflect upon in the assessment methods used by the Borrower?
Which of the following is considered part of the ES Framework?
Which of the following is considered part of the ES Framework?
What should the Borrower use to engage stakeholders in accordance with the ESSs?
What should the Borrower use to engage stakeholders in accordance with the ESSs?
What should the Borrower do if they encounter technical constraints when meeting EHSGs requirements?
What should the Borrower do if they encounter technical constraints when meeting EHSGs requirements?
During which phase should the Borrower monitor environmental and social risks?
During which phase should the Borrower monitor environmental and social risks?
What must the Borrower do if host country requirements exceed EHSGs?
What must the Borrower do if host country requirements exceed EHSGs?
Which of the following best describes the purpose of the environmental and social assessment?
Which of the following best describes the purpose of the environmental and social assessment?
What is required of the Borrower if specific project circumstances warrant less stringent environmental and social measures?
What is required of the Borrower if specific project circumstances warrant less stringent environmental and social measures?
What type of plans are typically prepared in conjunction with project and site-specific studies to address environmental and social risks?
What type of plans are typically prepared in conjunction with project and site-specific studies to address environmental and social risks?
Which of the following is a primary focus of the Regional Environmental and Social Impact Assessment (ESIA)?
Which of the following is a primary focus of the Regional Environmental and Social Impact Assessment (ESIA)?
What does the ESMF primarily include regarding environmental and social risks?
What does the ESMF primarily include regarding environmental and social risks?
What is a potential requirement for Borrowers when assessing adverse project impacts?
What is a potential requirement for Borrowers when assessing adverse project impacts?
Which of the following plans may be necessary for projects addressing the needs of Indigenous Peoples?
Which of the following plans may be necessary for projects addressing the needs of Indigenous Peoples?
What aspect should assessments consider regarding the impacts on primary suppliers?
What aspect should assessments consider regarding the impacts on primary suppliers?
Which component is included in the ESMF to address adverse social impacts?
Which component is included in the ESMF to address adverse social impacts?
What is essential for the Borrower when developing plans for environmental and social assessments?
What is essential for the Borrower when developing plans for environmental and social assessments?
What is the primary expectation from the project concerning technologies used?
What is the primary expectation from the project concerning technologies used?
Which aspect is NOT included in cultural services provided by ecosystems?
Which aspect is NOT included in cultural services provided by ecosystems?
What is meant by 'disadvantaged or vulnerable' in the context of project impacts?
What is meant by 'disadvantaged or vulnerable' in the context of project impacts?
Which of the following best describes supporting services provided by ecosystems?
Which of the following best describes supporting services provided by ecosystems?
What is a possible component of the mitigation hierarchy?
What is a possible component of the mitigation hierarchy?
What is a critical consideration in the environmental and social assessment?
What is a critical consideration in the environmental and social assessment?
What role does the Borrower have regarding the costs of residual impacts?
What role does the Borrower have regarding the costs of residual impacts?
What is a primary goal of the environmental and social assessment process?
What is a primary goal of the environmental and social assessment process?
What is a key responsibility of the Borrower in relation to the Environmental and Social Commitment Plan (ESCP)?
What is a key responsibility of the Borrower in relation to the Environmental and Social Commitment Plan (ESCP)?
What aspect does the Bank help the Borrower with concerning the project?
What aspect does the Bank help the Borrower with concerning the project?
How must the Borrower approach project monitoring according to the legal agreement?
How must the Borrower approach project monitoring according to the legal agreement?
What is meant by the term 'stakeholder engagement' in the context of project assessments?
What is meant by the term 'stakeholder engagement' in the context of project assessments?
What is the significance of updating the ESCP?
What is the significance of updating the ESCP?
In assessing the environmental and social impacts of a project, what does the Borrower need to ensure?
In assessing the environmental and social impacts of a project, what does the Borrower need to ensure?
What is crucial for the Borrower in relation to the environmental and social risks of the project?
What is crucial for the Borrower in relation to the environmental and social risks of the project?
What should the Borrower do if they identify potential adverse impacts during project assessments?
What should the Borrower do if they identify potential adverse impacts during project assessments?
What should be identified regarding adverse impacts to ensure they do not disproportionately affect disadvantaged individuals?
What should be identified regarding adverse impacts to ensure they do not disproportionately affect disadvantaged individuals?
What must the feasibility assessment of proposed mitigation measures include?
What must the feasibility assessment of proposed mitigation measures include?
Which of the following is essential for stakeholder engagement during environmental and social assessments?
Which of the following is essential for stakeholder engagement during environmental and social assessments?
What aspect should be included in the environmental and social assessment to guide the Borrower's capacity building?
What aspect should be included in the environmental and social assessment to guide the Borrower's capacity building?
When assessing mitigation measures, what aspect is crucial for their suitability?
When assessing mitigation measures, what aspect is crucial for their suitability?
What is necessary for the Borrower when the assessment highlights inadequate capacity?
What is necessary for the Borrower when the assessment highlights inadequate capacity?
What critical element should the environmental and social assessment include relating to the project's potential impacts?
What critical element should the environmental and social assessment include relating to the project's potential impacts?
Which factors should be included in the analysis of institutional capabilities?
Which factors should be included in the analysis of institutional capabilities?
What type of studies should inform the project’s approach to environmental or social assessments?
What type of studies should inform the project’s approach to environmental or social assessments?
Which of the following components may be included in the project to enhance environmental and social management?
Which of the following components may be included in the project to enhance environmental and social management?
What should the assessment take into account regarding the Borrower's primary suppliers?
What should the assessment take into account regarding the Borrower's primary suppliers?
Under what circumstances should obligations of the country relevant to the project be examined?
Under what circumstances should obligations of the country relevant to the project be examined?
What is the role of offsite investments in the context of the proposed project?
What is the role of offsite investments in the context of the proposed project?
Which requirement must be met to comply with the effective execution of the environmental and social assessment?
Which requirement must be met to comply with the effective execution of the environmental and social assessment?
What aspect may require the Borrower to conduct additional evaluations during the project planning phase?
What aspect may require the Borrower to conduct additional evaluations during the project planning phase?
What must the Borrower demonstrate regarding land tenure rights?
What must the Borrower demonstrate regarding land tenure rights?
What is required for resolving competing tenure claims?
What is required for resolving competing tenure claims?
How should information about rights be conveyed to affected people?
How should information about rights be conveyed to affected people?
What characterizes subprojects with minimal environmental or social risks?
What characterizes subprojects with minimal environmental or social risks?
In what instances are primary suppliers involved in project assessments?
In what instances are primary suppliers involved in project assessments?
What do the provisions for Bank-supported projects primarily focus on?
What do the provisions for Bank-supported projects primarily focus on?
What is not a characteristic of core functions of a project?
What is not a characteristic of core functions of a project?
What aspect is NOT a requirement regarding project design features?
What aspect is NOT a requirement regarding project design features?
What does a Sectoral ESIA primarily evaluate?
What does a Sectoral ESIA primarily evaluate?
Which of the following may be necessary for the Borrower when conducting an environmental and social assessment?
Which of the following may be necessary for the Borrower when conducting an environmental and social assessment?
What aspect of environmental and social assessment should be linked to co-financers?
What aspect of environmental and social assessment should be linked to co-financers?
In the context of ESIA, what is essential to strengthen environmental and social management?
In the context of ESIA, what is essential to strengthen environmental and social management?
What type of additional work may the Borrower need to undertake if previous assessments are incomplete?
What type of additional work may the Borrower need to undertake if previous assessments are incomplete?
Which element is critical when evaluating the impacts of a proposed project?
Which element is critical when evaluating the impacts of a proposed project?
What does the environmental and social assessment require from the Borrower to thoroughly address issues?
What does the environmental and social assessment require from the Borrower to thoroughly address issues?
What kind of risks does Sectoral ESIA evaluate for a particular sector?
What kind of risks does Sectoral ESIA evaluate for a particular sector?
What is a key consideration for the Borrower when identifying mitigation measures for environmental and social impacts?
What is a key consideration for the Borrower when identifying mitigation measures for environmental and social impacts?
Which of the following may assess the acceptability of residual negative impacts after proposed mitigation measures?
Which of the following may assess the acceptability of residual negative impacts after proposed mitigation measures?
Which aspect is vital for ensuring that adverse impacts do not disproportionately affect vulnerable groups?
Which aspect is vital for ensuring that adverse impacts do not disproportionately affect vulnerable groups?
What should the Borrower consider when assessing the feasibility of the proposed mitigation measures?
What should the Borrower consider when assessing the feasibility of the proposed mitigation measures?
What type of obligations does the project need to address regarding international treaties and agreements?
What type of obligations does the project need to address regarding international treaties and agreements?
What is necessary when specifying the means of stakeholder engagement in a project?
What is necessary when specifying the means of stakeholder engagement in a project?
Why is it essential to analyze national environmental or social action plans?
Why is it essential to analyze national environmental or social action plans?
What type of costs should be assessed alongside proposed mitigation measures?
What type of costs should be assessed alongside proposed mitigation measures?
What should be the focus of projects to prevent adverse impacts disproportionately affecting vulnerable groups?
What should be the focus of projects to prevent adverse impacts disproportionately affecting vulnerable groups?
Which type of projects do not apply to the Environmental and Social Policy for Investment Project Financing?
Which type of projects do not apply to the Environmental and Social Policy for Investment Project Financing?
What is a key component that should be utilized in assessing and developing projects?
What is a key component that should be utilized in assessing and developing projects?
Which of the following is NOT a focus of improved environmental and social performance?
Which of the following is NOT a focus of improved environmental and social performance?
During the technical assistance activities, which aspects must the Borrower consider?
During the technical assistance activities, which aspects must the Borrower consider?
Which operational policy relates specifically to Program-for-Results Financing?
Which operational policy relates specifically to Program-for-Results Financing?
What is the primary purpose of the environmental and social audit conducted by the Borrower?
What is the primary purpose of the environmental and social audit conducted by the Borrower?
Why is it important to engage national institutions in project assessments?
Why is it important to engage national institutions in project assessments?
Which of the following actions should the Borrower take immediately after an incident or accident?
Which of the following actions should the Borrower take immediately after an incident or accident?
What is essential for the Borrower when proposing less stringent levels than established standards?
What is essential for the Borrower when proposing less stringent levels than established standards?
Which document must be provided and disclosed by the Borrower prior to project appraisal?
Which document must be provided and disclosed by the Borrower prior to project appraisal?
What does the environmental and social assessment specifically consider according to the relevant standards?
What does the environmental and social assessment specifically consider according to the relevant standards?
In terms of compliance and risk management, what will the Bank consider when evaluating the Borrower's documentation?
In terms of compliance and risk management, what will the Bank consider when evaluating the Borrower's documentation?
How are the costs of the necessary measures identified in the environmental and social audit determined?
How are the costs of the necessary measures identified in the environmental and social audit determined?
What is a key component of ensuring the effectiveness of the environmental and social assessment?
What is a key component of ensuring the effectiveness of the environmental and social assessment?
Which aspect is critical for the Borrower to address when managing project-related risks?
Which aspect is critical for the Borrower to address when managing project-related risks?
What must the environmental and social assessment take into account according to ESS1?
What must the environmental and social assessment take into account according to ESS1?
What does the Borrower need to analyze in relation to the environmental and social framework?
What does the Borrower need to analyze in relation to the environmental and social framework?
Which aspect is highlighted regarding the risks and impacts identified in the ESSs?
Which aspect is highlighted regarding the risks and impacts identified in the ESSs?
What should be included in the analysis of the Borrower's framework?
What should be included in the analysis of the Borrower's framework?
How should the Borrower handle gaps identified during the analysis?
How should the Borrower handle gaps identified during the analysis?
What is a primary focus when considering the environmental and social assessment?
What is a primary focus when considering the environmental and social assessment?
What must be assessed in terms of the implications of identified environmental and social risks?
What must be assessed in terms of the implications of identified environmental and social risks?
Which component is critical in comparing the Borrower's existing framework to ESS requirements?
Which component is critical in comparing the Borrower's existing framework to ESS requirements?
Flashcards
Borrower's Responsibility
Borrower's Responsibility
Borrowers are responsible for managing the environmental and social risks and impacts of their projects throughout the project's lifespan.
Systematic Risk & Impact Management
Systematic Risk & Impact Management
The Borrower manages risks and impacts systematically, based on the project's characteristics and potential risks.
Proportionality in Risk Management
Proportionality in Risk Management
The scale and potential of risks and impacts influence the level of management effort.
National Framework Use
National Framework Use
Signup and view all the flashcards
Alignment with ESSs
Alignment with ESSs
Signup and view all the flashcards
Borrower's Responsibility (Implementation)
Borrower's Responsibility (Implementation)
Signup and view all the flashcards
Compliance with ESSs
Compliance with ESSs
Signup and view all the flashcards
Timeframe Agreement
Timeframe Agreement
Signup and view all the flashcards
Environmental and Social Risk Management
Environmental and Social Risk Management
Signup and view all the flashcards
Compliance with Standards
Compliance with Standards
Signup and view all the flashcards
Justifying Alternatives
Justifying Alternatives
Signup and view all the flashcards
Project Objectives and ESSs
Project Objectives and ESSs
Signup and view all the flashcards
Justification of Alternatives
Justification of Alternatives
Signup and view all the flashcards
Cultural Heritage Management Plan
Cultural Heritage Management Plan
Signup and view all the flashcards
Sectoral EIA
Sectoral EIA
Signup and view all the flashcards
Regional EIA
Regional EIA
Signup and view all the flashcards
Direct Impact
Direct Impact
Signup and view all the flashcards
Indirect Impact
Indirect Impact
Signup and view all the flashcards
Induced Impact
Induced Impact
Signup and view all the flashcards
Borrower's ES Framework
Borrower's ES Framework
Signup and view all the flashcards
Inconsistencies in the ES Framework
Inconsistencies in the ES Framework
Signup and view all the flashcards
Independent Experts for High-Risk Projects
Independent Experts for High-Risk Projects
Signup and view all the flashcards
Proportionate Impacts on Vulnerable Groups
Proportionate Impacts on Vulnerable Groups
Signup and view all the flashcards
Assessing Supplier Risks
Assessing Supplier Risks
Signup and view all the flashcards
Assessing Subprojects
Assessing Subprojects
Signup and view all the flashcards
Managing Risks of Associated Activities
Managing Risks of Associated Activities
Signup and view all the flashcards
Fair Distribution of Development Benefits
Fair Distribution of Development Benefits
Signup and view all the flashcards
Impacts of Associated Facilities
Impacts of Associated Facilities
Signup and view all the flashcards
Mitigating Adverse Impacts on Disadvantaged Groups
Mitigating Adverse Impacts on Disadvantaged Groups
Signup and view all the flashcards
Executive Summary (ESIA)
Executive Summary (ESIA)
Signup and view all the flashcards
Baseline Data (ESIA)
Baseline Data (ESIA)
Signup and view all the flashcards
Indicative Outline (ESIA)
Indicative Outline (ESIA)
Signup and view all the flashcards
Environmental and Social Impact Assessment (ESIA)
Environmental and Social Impact Assessment (ESIA)
Signup and view all the flashcards
Data Quality and Accuracy (ESIA)
Data Quality and Accuracy (ESIA)
Signup and view all the flashcards
Significant Findings (ESIA)
Significant Findings (ESIA)
Signup and view all the flashcards
Recommended Actions (ESIA)
Recommended Actions (ESIA)
Signup and view all the flashcards
Data Gaps and Uncertainties (ESIA)
Data Gaps and Uncertainties (ESIA)
Signup and view all the flashcards
Mitigation Measures (ESMP)
Mitigation Measures (ESMP)
Signup and view all the flashcards
Differentiated Measures
Differentiated Measures
Signup and view all the flashcards
Feasibility Assessment
Feasibility Assessment
Signup and view all the flashcards
Implementation Requirements
Implementation Requirements
Signup and view all the flashcards
Stakeholder Engagement Methods
Stakeholder Engagement Methods
Signup and view all the flashcards
ESMP Data Documentation
ESMP Data Documentation
Signup and view all the flashcards
Indicative Outline of ESMP
Indicative Outline of ESMP
Signup and view all the flashcards
Environmental and Social Due Diligence
Environmental and Social Due Diligence
Signup and view all the flashcards
Stricter Standards
Stricter Standards
Signup and view all the flashcards
Project Alignment
Project Alignment
Signup and view all the flashcards
Ongoing Risk Management
Ongoing Risk Management
Signup and view all the flashcards
Cultural Heritage Impact
Cultural Heritage Impact
Signup and view all the flashcards
Tailoring ES Framework
Tailoring ES Framework
Signup and view all the flashcards
Environmental and Social Assessment
Environmental and Social Assessment
Signup and view all the flashcards
Addressing Gaps in Borrower's ES Framework
Addressing Gaps in Borrower's ES Framework
Signup and view all the flashcards
Alignment of Project Objectives with ESSs
Alignment of Project Objectives with ESSs
Signup and view all the flashcards
ES Framework Consistency & Information Gaps
ES Framework Consistency & Information Gaps
Signup and view all the flashcards
Assessing Environmental and Social Impacts of Subprojects
Assessing Environmental and Social Impacts of Subprojects
Signup and view all the flashcards
Environmental and Social Assessment (ESA)
Environmental and Social Assessment (ESA)
Signup and view all the flashcards
ESMP (Environmental and Social Management Plan)
ESMP (Environmental and Social Management Plan)
Signup and view all the flashcards
ESMF (Environmental and Social Management Framework)
ESMF (Environmental and Social Management Framework)
Signup and view all the flashcards
SESA (Strategic Environmental and Social Assessment)
SESA (Strategic Environmental and Social Assessment)
Signup and view all the flashcards
ESIA (Environmental and Social Impact Assessment)
ESIA (Environmental and Social Impact Assessment)
Signup and view all the flashcards
What is Cumulative Impact?
What is Cumulative Impact?
Signup and view all the flashcards
What information does the Borrower need to provide?
What information does the Borrower need to provide?
Signup and view all the flashcards
What is the ESF's role in the project?
What is the ESF's role in the project?
Signup and view all the flashcards
When are cumulative impacts assessed?
When are cumulative impacts assessed?
Signup and view all the flashcards
Who decides what cumulative impacts matter?
Who decides what cumulative impacts matter?
Signup and view all the flashcards
Borrower's Notification Responsibility
Borrower's Notification Responsibility
Signup and view all the flashcards
Methods for Assessing Environmental and Social Risks
Methods for Assessing Environmental and Social Risks
Signup and view all the flashcards
ES Framework Consistency
ES Framework Consistency
Signup and view all the flashcards
ES Framework Modification Process
ES Framework Modification Process
Signup and view all the flashcards
Identifying and Managing Environmental and Social Risks
Identifying and Managing Environmental and Social Risks
Signup and view all the flashcards
Mitigation Hierarchy
Mitigation Hierarchy
Signup and view all the flashcards
Provisioning Services
Provisioning Services
Signup and view all the flashcards
Regulating Services
Regulating Services
Signup and view all the flashcards
Cultural Services
Cultural Services
Signup and view all the flashcards
Supporting Services
Supporting Services
Signup and view all the flashcards
Good International Industry Practice (GIIP)
Good International Industry Practice (GIIP)
Signup and view all the flashcards
Cumulative Impact
Cumulative Impact
Signup and view all the flashcards
Environmental and Social Management Framework (ESMF)
Environmental and Social Management Framework (ESMF)
Signup and view all the flashcards
Proportionate Risk Management
Proportionate Risk Management
Signup and view all the flashcards
Tailoring the ES Framework
Tailoring the ES Framework
Signup and view all the flashcards
Addressing Gaps in the ES Framework
Addressing Gaps in the ES Framework
Signup and view all the flashcards
Adequate Institutional Capacity
Adequate Institutional Capacity
Signup and view all the flashcards
Stakeholder Engagement in Monitoring
Stakeholder Engagement in Monitoring
Signup and view all the flashcards
Information Disclosure to Stakeholders
Information Disclosure to Stakeholders
Signup and view all the flashcards
Independent Experts for Monitoring
Independent Experts for Monitoring
Signup and view all the flashcards
Alignment of Objectives with ESSs
Alignment of Objectives with ESSs
Signup and view all the flashcards
What are Associated Facilities?
What are Associated Facilities?
Signup and view all the flashcards
What are the Borrower's main responsibilities?
What are the Borrower's main responsibilities?
Signup and view all the flashcards
How must project objectives be aligned?
How must project objectives be aligned?
Signup and view all the flashcards
What is the Borrower's role in tailoring the ESF?
What is the Borrower's role in tailoring the ESF?
Signup and view all the flashcards
What is the Borrower's responsibility regarding risks?
What is the Borrower's responsibility regarding risks?
Signup and view all the flashcards
What is the Borrower's responsibility regarding impacts of Associated Facilities?
What is the Borrower's responsibility regarding impacts of Associated Facilities?
Signup and view all the flashcards
What information must the Borrower provide about past studies?
What information must the Borrower provide about past studies?
Signup and view all the flashcards
What needs to be done if there are inconsistencies in Borrower's framework?
What needs to be done if there are inconsistencies in Borrower's framework?
Signup and view all the flashcards
Social and Conflict Analysis
Social and Conflict Analysis
Signup and view all the flashcards
Project Alignment with ESSs
Project Alignment with ESSs
Signup and view all the flashcards
Environmental and Social Management Plan (ESMP)
Environmental and Social Management Plan (ESMP)
Signup and view all the flashcards
Strategic Environmental and Social Assessment (SESA)
Strategic Environmental and Social Assessment (SESA)
Signup and view all the flashcards
Mitigation Measures
Mitigation Measures
Signup and view all the flashcards
Borrower's Responsibilities
Borrower's Responsibilities
Signup and view all the flashcards
Borrower's Role in Tailoring the ESF
Borrower's Role in Tailoring the ESF
Signup and view all the flashcards
Borrower's Responsibility Regarding Risks
Borrower's Responsibility Regarding Risks
Signup and view all the flashcards
Past Studies and Cumulative Impacts
Past Studies and Cumulative Impacts
Signup and view all the flashcards
Addressing Gaps in the Borrower's ES Framework
Addressing Gaps in the Borrower's ES Framework
Signup and view all the flashcards
The Borrower's Main Responsibilities
The Borrower's Main Responsibilities
Signup and view all the flashcards
The Borrower's Role in Tailoring the ESF
The Borrower's Role in Tailoring the ESF
Signup and view all the flashcards
The Borrower's Responsibility Regarding Risks and Impacts
The Borrower's Responsibility Regarding Risks and Impacts
Signup and view all the flashcards
Addressing Inconsistencies in the ES Framework
Addressing Inconsistencies in the ES Framework
Signup and view all the flashcards
What is Social and Conflict Analysis?
What is Social and Conflict Analysis?
Signup and view all the flashcards
What is a Strategic Environmental and Social Assessment (SESA)?
What is a Strategic Environmental and Social Assessment (SESA)?
Signup and view all the flashcards
What is an Environmental and Social Management Plan (ESMP)?
What is an Environmental and Social Management Plan (ESMP)?
Signup and view all the flashcards
What are Mitigation Measures?
What are Mitigation Measures?
Signup and view all the flashcards
What are the Borrower's Responsibilities?
What are the Borrower's Responsibilities?
Signup and view all the flashcards
Environmental and Social Standards (ESSs)
Environmental and Social Standards (ESSs)
Signup and view all the flashcards
Associated Facilities
Associated Facilities
Signup and view all the flashcards
What does the Borrower need to demonstrate?
What does the Borrower need to demonstrate?
Signup and view all the flashcards
What are 'Associated Facilities'?
What are 'Associated Facilities'?
Signup and view all the flashcards
What is the Borrower's responsibility regarding 'Associated Facilities'?
What is the Borrower's responsibility regarding 'Associated Facilities'?
Signup and view all the flashcards
Assessing Environmental and Social Risks
Assessing Environmental and Social Risks
Signup and view all the flashcards
Borrower's Responsibility for Risk Management
Borrower's Responsibility for Risk Management
Signup and view all the flashcards
Who is responsible for ensuring commitments to ESSs?
Who is responsible for ensuring commitments to ESSs?
Signup and view all the flashcards
How are project objectives aligned with ESSs?
How are project objectives aligned with ESSs?
Signup and view all the flashcards
What happens if the Borrower's ES Framework has inconsistencies?
What happens if the Borrower's ES Framework has inconsistencies?
Signup and view all the flashcards
What is the Borrower's responsibility in the environmental and social assessment?
What is the Borrower's responsibility in the environmental and social assessment?
Signup and view all the flashcards
How are subprojects assessed for environmental and social impacts?
How are subprojects assessed for environmental and social impacts?
Signup and view all the flashcards
Financial Feasibility
Financial Feasibility
Signup and view all the flashcards
What is Environmental and Social Assessment?
What is Environmental and Social Assessment?
Signup and view all the flashcards
What is Environmental and Social Due Diligence?
What is Environmental and Social Due Diligence?
Signup and view all the flashcards
What is the Mitigation Hierarchy?
What is the Mitigation Hierarchy?
Signup and view all the flashcards
What are inconsistencies in the Borrower's ES Framework?
What are inconsistencies in the Borrower's ES Framework?
Signup and view all the flashcards
Borrower's Responsibility for Risks
Borrower's Responsibility for Risks
Signup and view all the flashcards
Borrower's Responsibility for Associated Facilities
Borrower's Responsibility for Associated Facilities
Signup and view all the flashcards
What are ESSs?
What are ESSs?
Signup and view all the flashcards
What is an ESMP?
What is an ESMP?
Signup and view all the flashcards
What is a cumulative impact assessment?
What is a cumulative impact assessment?
Signup and view all the flashcards
What is a SESA?
What is a SESA?
Signup and view all the flashcards
What is an ESMF?
What is an ESMF?
Signup and view all the flashcards
What is the Borrower's responsibility regarding the ESCP?
What is the Borrower's responsibility regarding the ESCP?
Signup and view all the flashcards
Align Objectives with ESSs
Align Objectives with ESSs
Signup and view all the flashcards
Past Studies Information
Past Studies Information
Signup and view all the flashcards
ESF Inconsistencies
ESF Inconsistencies
Signup and view all the flashcards
Addressing Gaps in Borrower's Framework
Addressing Gaps in Borrower's Framework
Signup and view all the flashcards
Providing Past Studies
Providing Past Studies
Signup and view all the flashcards
Tailoring the ESF
Tailoring the ESF
Signup and view all the flashcards
What is SESA (Strategic Environmental and Social Assessment)?
What is SESA (Strategic Environmental and Social Assessment)?
Signup and view all the flashcards
What is an ESMF (Environmental and Social Management Framework)?
What is an ESMF (Environmental and Social Management Framework)?
Signup and view all the flashcards
What are Provisioning Services?
What are Provisioning Services?
Signup and view all the flashcards
What are Supporting Services?
What are Supporting Services?
Signup and view all the flashcards
What are Regulating Services?
What are Regulating Services?
Signup and view all the flashcards
What are Cultural Services?
What are Cultural Services?
Signup and view all the flashcards
What is an ESMP (Environmental and Social Management Plan)?
What is an ESMP (Environmental and Social Management Plan)?
Signup and view all the flashcards
Borrower's Responsibility Regarding Past Studies
Borrower's Responsibility Regarding Past Studies
Signup and view all the flashcards
Study Notes
Environmental and Social Risk Assessment and Management
- ESS1 outlines the borrower's responsibility for assessing, managing, and monitoring environmental and social risks throughout a Bank-supported project.
- The Environmental and Social Standards (ESSs) help borrowers manage risks and improve performance through a risk-outcome based approach.
- Specific requirements within each ESS guide borrowers to achieve defined objectives relative to the project's scale and environmental/social impact.
- Environmental and social assessments proportionate to project risks are conducted to ensure projects are environmentally and socially sound and sustainable.
- Environmental and social risks and impacts are managed throughout the project's lifecycle, proportionate to scale and potential impacts.
- Borrowers can use existing national environmental and social frameworks with the Bank's approval to mitigate project risks, provided that objectives are materially consistent with the ESSs.
- Borrowers may not be the entities directly implementing the project, but are responsible for ensuring project compliance with ESSs. Borrowers are responsible for ensuring any relevant national, subnational, or sectoral implementing institution, and any implementing agency complies with ESSs.
Scope of Application
- ESS1 applies to all projects financed by the Bank under Investment Project Financing, including technical assistance and activities.
- "Project" refers to activities financed by the Borrower and defined in the legal agreement with the bank.
- Borrowers cooperate with the bank and other agencies providing joint funding to establish a common approach to environmental and social risk assessment and management. For such projects, the common approach will materially achieve the project objectives consistently with the ESSs.
- ESS1 applies to all associated facilities, including those not directly funded by the project but directly related, carried out contemporaneously, and necessary for project viability.
- Technical assistance activities, supported by the Bank, are included, applying the relevant requirements of ESS1. These activities are subject to the requirements in paragraphs 14-18 of ESS1.
- Projects supported by guarantees under the Investment Project Financing, are subject to the application of ESS, depending on the activities and commitments.
Requirements
- The borrower is responsible for assessing, managing, and monitoring environmental and social risks and impacts consistently throughout the project lifecycle, as defined in the ESSs. Specific considerations to address the significance of risks include: the nature and significance of potential environmental and social risks and impacts, the timing of project development and implementation, the capacity of the borrower, measures and actions for addressing potential impacts.
- The borrower must conduct environmental and social assessments proportionate to the project's potential risks and impacts, using appropriate methods and tools (e.g., ESIA, audit, surveys, studies).
- Stakeholder engagement is a key part of the process, following ESS10 criteria.
- Borrowers will adopt and implement corrective measures if existing facilities do not meet ESS requirements.
- The project will adhere to Environmental Health and Safety Guidelines (EHSGs), using the more stringent requirements, if necessary, justifying any less-stringent alternatives.
- Borrowers can use their national environmental and social frameworks, with bank approval, in the assessment, development, and implementation of projects if the objectives are consistent with the ESSs.
- The borrower must demonstrate that associated facilities are not under their control or influence by specifying relevant factors (legal, regulatory, etc.) to justify this.
- National legislation and regulations, including institutional capabilities (implementation) must be incorporated.
- The assessment and plans must reflect the nature and scale of the project and its potential environmental and social risks and impacts. Appropriate methods (like scoping, stakeholder engagement, identifying & mitigating risks and impacts, coordination) should be used.
Environmental and Social Commitment Plan (ESCP)
- The ESCP outlines measures and actions required for project compliance with ESSs within a timeline, and is part of the legal agreement.
- It incorporates environmental and social assessment findings, bank due diligence, and stakeholder input from the initial phase to achieve compliance within a specified timeframe.
- The plan uses management tools (like environmental and social management plans, frameworks, policies, etc.) to specify outcomes, targets, and performance indicators, clearly defined for the project's risks.
- The plan must be responsive to changes in project circumstances, unforeseen events, and regulatory changes.
- The ESCP is subject to updates and revisions based on monitoring results and possible changes within the project life cycle, and will be disclosed.
- The ESCP will contain specific management tools the borrower will use, including environmental and social management plans, frameworks, operational policies, and procedures, tailored to the project's needs.
- Procedures for adaptive management for unforeseen circumstances and project changes are defined.
- The ESCP may exist as a stand-alone document, or may be incorporated into existing documents.
Project Monitoring and Reporting
- Borrowers monitor project environmental and social performance in accordance with the ESCP and legal agreement, in a manner proportionate to the nature of the project, its risks, impacts, and compliance requirements.
- Monitoring methods and frequency must be proportionate to the project's risks and impacts.
- Regular reports on project implementation, compliance with the ESCP and relevant ESSs are provided to the Bank.
- Stakeholder engagement during project implementation is reported, according to ESS10 standards. Any gaps in the borrower's ES framework must be addressed.
- Project changes in scope, design, or implementation require prompt notification to the Bank if they are likely to affect the environmental or social risks.
- Site visits by Bank staff or consultants are facilitated.
Stakeholder Engagement
- Continued stakeholder engagement throughout the project lifecycle is required and must be appropriate to their interests, with regards to associated risks and impacts.
- Sufficient information regarding project risks and impacts, and stakeholder interests, must be communicated, thus ensuring that their interests are addressed.
- For high-risk/substantial risk projects, documentation of risks and impacts, and sufficient detail should be provided to the Bank before appraisal.
- The borrower provides regular reports about monitoring results, compliance with the ESCP and relevant ESSs.
- The borrower will facilitate Bank site visits.
Environmental and Social Assessment
- Borrowers assess environmental and social project risks and impacts throughout the project life cycle, proportionate in detail to its scale.
- Methods and tools used in assessment should be proportionate to the project and consider all relevant risks and impacts (direct, indirect, and cumulative and appropriate for the project) including associated facilities.
- Current information, project alternatives, and stakeholder engagement are key for the assessment.
- Existing project activities and their risks must be considered in relation to new projects.
- Associated facilities must be assessed, addressing the risks and impacts proportionally based on the borrower's level of control.
Management of Contractors
- Contractors working on the project must follow ESS requirements, including ESCP specifications, to ensure compliance with and consistent execution of project operations.
- The borrower will manage contractors by evaluating environmental and social risks, ensuring appropriate resources and qualifications, and incorporating ESCP elements into contract documents – ensuring that these documents accurately reflect the contractually agreed upon obligations
- Contractor supervision and compliance with environmental and social provisions are monitored.
- Independent contractors will be used as appropriate for high-risk, contentious, or multi-faceted environmental or social risks. Such consultants must be qualified environmental and social specialists.
- The borrower will include all relevant parts of the ESCP in any contractor agreement and all contracting parties must meet all ESS guidelines.
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.
Related Documents
Description
This quiz assesses your understanding of the obligations of Borrowers in relation to environmental and social risks. It covers topics such as compliance with EHSGs and the Bank's role in ensuring adherence to ESSs. Test your knowledge of key concepts and requirements in this critical area.