Maintenance Management Systems
10 Questions
1 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

Which department is responsible for approving changes to existing designs during a plant shutdown?

  • Maintenance department
  • Planner department
  • Engineering department (correct)
  • Operations department
  • Who co-ordinates and routes all tasks and sub-tasks for every work request?

  • Planner (correct)
  • Tradespeople
  • Technicians
  • Operators
  • Which department issues work permits and other supporting permits?

  • Planner department
  • Operations department (correct)
  • Engineering department
  • Maintenance department
  • Which type of maintenance involves the systematic inspection, detection, and correction of conditions, to prevent equipment failure?

    <p>Preventative maintenance</p> Signup and view all the answers

    What is the purpose of a Maintenance Management System (MMS)?

    <p>All of the above</p> Signup and view all the answers

    Which type of maintenance consists of regular scheduled tasks associated with the continuous operation of a facility?

    <p>Routine maintenance</p> Signup and view all the answers

    Which department is responsible for ordering parts, specialized tools, and equipment?

    <p>Maintenance department</p> Signup and view all the answers

    What triggers many activities when a work request is submitted?

    <p>Determining the costs for labour, parts, and consumable materials</p> Signup and view all the answers

    Which type of maintenance usually requires work requests?

    <p>Non-routine maintenance</p> Signup and view all the answers

    Who is usually the supervisor for Power Engineers in a plant?

    <p>Shift charge engineer</p> Signup and view all the answers

    More Like This

    Use Quizgecko on...
    Browser
    Browser