Maintenance Management Systems

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson
Download our mobile app to listen on the go
Get App

Questions and Answers

Which department is responsible for approving changes to existing designs during a plant shutdown?

  • Maintenance department
  • Planner department
  • Engineering department (correct)
  • Operations department

Who co-ordinates and routes all tasks and sub-tasks for every work request?

  • Planner (correct)
  • Tradespeople
  • Technicians
  • Operators

Which department issues work permits and other supporting permits?

  • Planner department
  • Operations department (correct)
  • Engineering department
  • Maintenance department

Which type of maintenance involves the systematic inspection, detection, and correction of conditions, to prevent equipment failure?

<p>Preventative maintenance (D)</p> Signup and view all the answers

What is the purpose of a Maintenance Management System (MMS)?

<p>All of the above (D)</p> Signup and view all the answers

Which type of maintenance consists of regular scheduled tasks associated with the continuous operation of a facility?

<p>Routine maintenance (C)</p> Signup and view all the answers

Which department is responsible for ordering parts, specialized tools, and equipment?

<p>Maintenance department (A)</p> Signup and view all the answers

What triggers many activities when a work request is submitted?

<p>Determining the costs for labour, parts, and consumable materials (B)</p> Signup and view all the answers

Which type of maintenance usually requires work requests?

<p>Non-routine maintenance (D)</p> Signup and view all the answers

Who is usually the supervisor for Power Engineers in a plant?

<p>Shift charge engineer (D)</p> Signup and view all the answers

Flashcards are hidden until you start studying

Related Documents

More Like This

Use Quizgecko on...
Browser
Browser