Questions and Answers

Match the products with their respective profits:

Product A = $9 Product B = $7 Product C = $12 Product D = $5

Match the assembly lines with their corresponding production times for Product A:

Line 1 = 12 hours Line 2 = 4 hours Line 3 = 8 hours Line 4 = 5 hours

Match the assembly lines with their corresponding production times for Product B:

Line 1 = 4 hours Line 2 = 8 hours Line 3 = 10 hours Line 4 = 6 hours

Match the total available hours with their respective values:

<p>Total hours for Line 1 and Line 2 = 40 hours Total hours for Line 1 and Line 3 = 55 hours Total hours for Line 2 and Line 3 = 45 hours</p> Signup and view all the answers

Match the potential effects on the optimal solution with the changes in production time and profit:

<p>Reduction of production time on Line 1 to 40 hours = Change in optimal solution Increase in profit for Product B to $15 = Change in optimal solution Increase in profit for Product B to $20 = Change in optimal solution Reduction of production time on Line 2 to 30 hours = No change in optimal solution</p> Signup and view all the answers