Questions and Answers
What is the purpose of the vacuum-sealed die during the extrusion process?
What is the purpose of the vacuum-sealed die during the extrusion process?
What two factors are used to mix the pellets and produce the correct mixture?
What two factors are used to mix the pellets and produce the correct mixture?
What are the three methods used to mold and bend the extruded pipe into the correct shape?
What are the three methods used to mold and bend the extruded pipe into the correct shape?
What material is added to the chair during the assembly process to give it its robust shape and eloquent feel?
What material is added to the chair during the assembly process to give it its robust shape and eloquent feel?
Signup and view all the answers
What material is placed in the joints to remove any gaps?
What material is placed in the joints to remove any gaps?
Signup and view all the answers
Which of the following is NOT one of the stages of production mentioned in the text?
Which of the following is NOT one of the stages of production mentioned in the text?
Signup and view all the answers
What is the purpose of a jig in the production process?
What is the purpose of a jig in the production process?
Signup and view all the answers
What is the role of the Trimmer?
What is the role of the Trimmer?
Signup and view all the answers
What are the stages of production
What are the stages of production
Signup and view all the answers
A finisher will inspect product by hand and wipe down with a wet rag. A Quality Control inspector will review the chair, scan it and pass it through to the Upholstery department
A finisher will inspect product by hand and wipe down with a wet rag. A Quality Control inspector will review the chair, scan it and pass it through to the Upholstery department
Signup and view all the answers
The upholstery department takes the finished frame and adds the fabric components. The fabric and foam are then cut for the chair. The Seat Press
department then upholsters the fabric, board and foam
The upholstery department takes the finished frame and adds the fabric components. The fabric and foam are then cut for the chair. The Seat Press department then upholsters the fabric, board and foam
Signup and view all the answers
The drilling department is responsible for adding the appropriate pre-drill template to the product. This template includes drilling instruction for the legs,
rails, and backs of the chairs
The drilling department is responsible for adding the appropriate pre-drill template to the product. This template includes drilling instruction for the legs, rails, and backs of the chairs
Signup and view all the answers
The final stage of production is QC, which is known as ____ _____.
The final stage of production is QC, which is known as ____ _____.
Signup and view all the answers
Kwalu Training | PRODUCTION P3
Answers
The final stage of production is QC, which is known as ____ _____. This is where we ensure our quality standards are met.
Once the product has been approved by QC, it passes to the ____ department. (pg. 13)
Quality Control
Shipping
The shipping department sends out notices to Inside Sales to prep the order for transit. Orders that are listed as "Waiting on Confirmations" are ones that are
complete and ready to ship. (pg. 14)
True or False
TRUE
Once approval has been provided by Sales, the Shipping department sends the order to "Pre-Loading". Next, the order is prepared to load on a trailer and
released into transit. (pg 15)
True or False
TRUE
The Shipping department then lists the program as "Shipping". Orders that are listed as "Order Shipping Today" are the ones that they have received
approval for. They will ship out once the truck has been filled. (pg. 16)
True or False
TRUE
Within the Barcode Icon, the Description section includes details such as: (1) Shipping Instructions and (2) Option Codes.
So, what does option (27) stand for?
Kwalu Training | PRODUCTION P3 Answers The final stage of production is QC, which is known as ____ _____. This is where we ensure our quality standards are met. Once the product has been approved by QC, it passes to the ____ department. (pg. 13) Quality Control Shipping The shipping department sends out notices to Inside Sales to prep the order for transit. Orders that are listed as "Waiting on Confirmations" are ones that are complete and ready to ship. (pg. 14) True or False TRUE Once approval has been provided by Sales, the Shipping department sends the order to "Pre-Loading". Next, the order is prepared to load on a trailer and released into transit. (pg 15) True or False TRUE The Shipping department then lists the program as "Shipping". Orders that are listed as "Order Shipping Today" are the ones that they have received approval for. They will ship out once the truck has been filled. (pg. 16) True or False TRUE Within the Barcode Icon, the Description section includes details such as: (1) Shipping Instructions and (2) Option Codes. So, what does option (27) stand for?
Signup and view all the answers
If Program PR is listed as "50-Not Started", this means pipe has not been extruded
If Program PR is listed as "50-Not Started", this means pipe has not been extruded
Signup and view all the answers
Once the pipe is produced, it is tagged with a ____ number based on the scheduled program
Once the pipe is produced, it is tagged with a ____ number based on the scheduled program
Signup and view all the answers