Jedec Standard and ESD Control Monitoring Quiz

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson
Download our mobile app to listen on the go
Get App

Questions and Answers

The Jedec Standard includes guidelines for the handling, packing, shipping, and use of Moisture/Reflow Sensitive Surface.

True (A)

The Jedec Standard specifies the Functional Test Requirement for Wire Bond Machine.

False (B)

Static Volt Checker is not listed as one of the equipment/tools mentioned for use in the production line.

False (B)

Latching and Unlatching Procedure is covered in Jedec Standard 411-052-8928.

<p>False (B)</p> Signup and view all the answers

Quality Assurance System Procedure is included in Jedec Standard 411-001.

<p>True (A)</p> Signup and view all the answers

Vernier Caliper and Micrometer are both examples of Measuring Equipment listed for use in the production line.

<p>True (A)</p> Signup and view all the answers

The revision history includes changes for FE OSA and IFM modules.

<p>True (A)</p> Signup and view all the answers

The lead frame sampling plan requires 5 strips and 30 points to cover LED, IC, and leads area.

<p>False (B)</p> Signup and view all the answers

According to the procedure, all applicable materials need to go through an outgoing inspection process before being shipped.

<p>False (B)</p> Signup and view all the answers

The reference documents include supplier qualification, material review board, statistical process control, and general corrective action procedures.

<p>True (A)</p> Signup and view all the answers

The ANSI-ASQC-Z1.4-1993 Sampling Procedures are included in the reference documents under Exhibit B1, B2, and B3.

<p>True (A)</p> Signup and view all the answers

The incoming inspection procedure covers the inspection of Amertron Inc. Purchased and Customer consigned Wafer Die.

<p>True (A)</p> Signup and view all the answers

The supplier tests data and results checked during verification include COA and COB.

<p>False (B)</p> Signup and view all the answers

The form 411-052(003) is used for Silicon (IPD) functional test.

<p>True (A)</p> Signup and view all the answers

The IQC Leadframes Defects are listed under the category of Wafer Die handling.

<p>False (B)</p> Signup and view all the answers

Tape/Bake and Cross Marking Test Methodology are part of ESD control monitoring.

<p>False (B)</p> Signup and view all the answers

Gold Wire Functionality Test falls under Quality assurance procedures.

<p>True (A)</p> Signup and view all the answers

Flashcards are hidden until you start studying

More Like This

Jedec Standard Handling and Testing Quiz
10 questions
Use Quizgecko on...
Browser
Browser