Which resource in the repair shop inspects the TVs after they have been repaired?

Second Inspection process

What is the estimated inspection time for the parts by the inspector?

Triangular

What is the estimated repair time for the TVs by the repair man?

Triangular

What is the estimated inspection time for the repaired TVs by the second inspection process?

Triangular

What percentage of the repaired TVs are sent back to the repair man for further repair after the second inspection?

10%