Indian Railways Governance and Authority Quiz
45 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the role of the Unified Railway Board as mentioned in the content?

  • To manage financial resources among railway subsidiaries.
  • To enforce international trade regulations.
  • To oversee the operations of the Ministry of Railways in India. (correct)
  • To develop new technologies for railway systems.
  • Which email domain is associated with the communication from the authority in the content?

  • ministry.gov.in
  • emailindia.com
  • gov.in (correct)
  • gov.us
  • Who is likely to hold the position mentioned in the content regarding the Unified Railway Board?

  • A legal advisor for international law.
  • A financial analyst from a private firm.
  • A Joint Director within the railway ministry. (correct)
  • A public relations officer.
  • What can be inferred about the relationship between the Subsidiary Rules and the Unified Railway Board?

    <p>Subsidiary Rules are subordinate to the Unified Railway Board's authority.</p> Signup and view all the answers

    What type of governance structure does the content suggest about the Indian railways?

    <p>Centralized under the Unified Railway Board's oversight.</p> Signup and view all the answers

    What does the authority allow the train to do?

    <p>Proceed without line clear from one station to another</p> Signup and view all the answers

    What is the maximum speed permitted over facing points as per the authority?

    <p>15 km/h</p> Signup and view all the answers

    Under which circumstance might this authority be given?

    <p>Failure of signals and communications</p> Signup and view all the answers

    What information is NOT included in the authority format?

    <p>Signature and stamp of the railway director</p> Signup and view all the answers

    What must the Loco Pilot do upon reaching the specified stop signals?

    <p>Wait for instruction from the Station Master</p> Signup and view all the answers

    Which of the following is a condition mentioned for granting authority?

    <p>Blocking of line or obstruction at a specific kilometer mark</p> Signup and view all the answers

    What is indicated when train managers and loco pilots are asked to sign the authority?

    <p>They acknowledge receipt and understanding of the authority</p> Signup and view all the answers

    When is it appropriate to strike out irrelevant instructions?

    <p>Whenever applicable circumstances arise</p> Signup and view all the answers

    What should be the general procedure for trains during a failure of automatic signalling expected to last for some time?

    <p>Trains shall be worked from station-to-station under special instructions.</p> Signup and view all the answers

    Who is responsible for determining if a signal failure should be considered prolonged?

    <p>The Sr.Divisional Operations Manager / Divisional Operations Manager in-charge.</p> Signup and view all the answers

    In case of obstruction of one line in a double line section, which rule applies when signals are operative and communication is available?

    <p>S.R. 9.12/3.</p> Signup and view all the answers

    What happens if there is a failure of signal/s between two block stations in the Automatic block system?

    <p>Train working should follow the provisions of Rule 9.02 or 9.07.</p> Signup and view all the answers

    In what situation might the decision be made to consider a signal failure as prolonged?

    <p>Advisory notice is received in writing from S&amp;T department indicating prolonged failure.</p> Signup and view all the answers

    What is required if a signal failure is causing or expected to cause serious delays?

    <p>Train operation during the failure is instituted in accordance with rule 9.12/1.</p> Signup and view all the answers

    Which S.R. addresses the rules for Single line sections in Automatic Block System when no means of communications are available?

    <p>S.R. 9.12/4.</p> Signup and view all the answers

    What should the train working be based on during a prolonged signal failure?

    <p>Special instructions relevant to the situation.</p> Signup and view all the answers

    Who is responsible for the decision to introduce temporary single line working?

    <p>Senior Divisional Operations Manager / Divisional Operations Manager (in-charge)</p> Signup and view all the answers

    What must occur before introducing temporary single line working if there are concerns about track fouling or damage?

    <p>A responsible engineering official not below the rank of SSE/JE (P.Way) must inspect the track.</p> Signup and view all the answers

    What is the status of the Semi-Automatic/Manual Despatch Stop Signal during temporary single line working?

    <p>It should be put in manual mode and kept in ON condition.</p> Signup and view all the answers

    Which communication methods can be used to obtain line clear during wrong line operations?

    <p>Fixed telephones and Control Telephone</p> Signup and view all the answers

    What should be introduced at stations on the affected section during temporary single line working?

    <p>A Train Signal Register</p> Signup and view all the answers

    What should a Loco Pilot do when proceeding on the wrong line in an electrified section?

    <p>Observe the neutral section.</p> Signup and view all the answers

    How should the identity of the Station Master on duty be verified when granting line clear?

    <p>By using unique private numbers given for the last preceding train</p> Signup and view all the answers

    What condition must temporary single line working meet regarding station nomination?

    <p>Both ends of the single line section must be nominated by the designated manager.</p> Signup and view all the answers

    What is the maximum speed allowed over facing points?

    <p>15 kmph</p> Signup and view all the answers

    What is a requirement for the communication devices used in the affected section during single line working?

    <p>They should all have caller ID functionality.</p> Signup and view all the answers

    What is the correct action regarding automatic signals when operating on the wrong line?

    <p>Regard them as out of use.</p> Signup and view all the answers

    What should a Loco Pilot ensure before passing semi-automatic or manually operated signals?

    <p>Hand signals are displayed by a railway servant.</p> Signup and view all the answers

    What happens if the train engine runs on the wrong line without the flasher light switched on?

    <p>The station staff shall stop the train immediately.</p> Signup and view all the answers

    When a line clear ticket is in question, what must be done if subsequent trains follow on the right line?

    <p>The line clear ticket should be striked out.</p> Signup and view all the answers

    What must a Loco Pilot ensure about points of outlying sidings?

    <p>They are correctly set and locked.</p> Signup and view all the answers

    What requirement is specified regarding the locking of level crossing gates?

    <p>They must be locked before passing the signals.</p> Signup and view all the answers

    What should a Railway Servant carry if the Electric Head Light is not operational during night?

    <p>Detonators and a Red Light</p> Signup and view all the answers

    What action must the Loco Pilot take when approaching a station and reaching the First Stop Signal?

    <p>Sound the whistle continuously or use the horn</p> Signup and view all the answers

    What is the maximum speed allowed when entering a non-signalled line as per the provided instructions?

    <p>15 kmph</p> Signup and view all the answers

    What should be done if no one arrives from the station within 10 minutes?

    <p>Send the Assistant Loco Pilot/Station Master/Guard to inform the Station Master</p> Signup and view all the answers

    What must the Loco Pilot be prepared to do at all times while operating the train?

    <p>Stop clear of any obstruction that may arise</p> Signup and view all the answers

    What is the initial action required if the Electric Head Light is not fitted to the engine at night?

    <p>Ensure adequate safety measures are in place with a servesant carrying detonators</p> Signup and view all the answers

    What should the Loco Pilot do if there is an obstruction on the track?

    <p>Stop clear and short of the obstruction</p> Signup and view all the answers

    How should a Loco Pilot signal to the station when arriving?

    <p>By continuously sounding the whistle or horn</p> Signup and view all the answers

    Study Notes

    Railway Board Document

    • Document is a memorandum from the Railway Board
    • Date: 16.08.2024
    • Subject: Formulation of Unified Subsidiary Rules and Authority Forms under GR 9.12
    • Unified Subsidiary Rules and authority forms are attached for information and necessary action
    • Document contains instructions pertaining to Unified Subsidiary Rules under GR 9.12
    • New para 9.12/1 that states trains during signal failures in Automatic Block System are to be run according to rule 9.02 (DL) and 9.07 (SL).
    • Forms T/A 912, T/D 912, T/B 912, T/C 912, T/B 602 and T/510 are reframed for use.
    • New form T/E-912 created for temporary single line working in Automatic Block Signalling territories
    • Unified SR 9.12 created for standard train working rules during failures.
    • Procedure for failure of signal/s between two or more block stations in Automatic block system
    • Rules and Regulations for working of trains under Automatic Block System during obstruction of one line
    • Rules and Regulations for Single line sections in Automatic Block System when no means of communications are available
    • Procedure for failure of Automatic Signalling
    • Each Station must have a unique CUG (Fixed Cellular Telephone) number
    • When automatic signalling is problematic, trains should be managed station-to-station.
    • Procedures for train working when no communication is available
    • Different procedures across zonal railways standarized
    • Instructions for communication methods like telephones and CUG
    • Reporting procedures for failure of signals
    • Various subsidiary rules and forms attached for the use of railways.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Related Documents

    Description

    Test your knowledge on the governance structure of the Indian Railways, including the roles and responsibilities outlined for the Unified Railway Board. This quiz evaluates your understanding of authority protocols, speed regulations, and communication within the system.

    More Like This

    Use Quizgecko on...
    Browser
    Browser