What was the main reason for the incident during the lasso retrieval?

  • The operation changed without a sufficient risk assessment. (correct)
  • The work party was not trained adequately.
  • The fibre rope was incorrectly secured.
  • The tugger was not properly maintained.
  • What type of injuries did the IP sustain from the incident?

  • Fractures in both legs.
  • Severe head injuries.
  • Minor injuries. (correct)
  • No injuries were reported.
  • Which corrective action was implemented following the incident?

  • Updating procedures to ensure vessel stopper pins are retracted. (correct)
  • Introduction of mandatory safety training for all personnel.
  • Deployment of additional safety personnel on board.
  • Increased penalties for safety violations.
  • How did the fibre rope behave when tension was applied during the operation?

    <p>It came free of the stopper pin and traveled upwards.</p> Signup and view all the answers

    What aspect was highlighted in the enhanced risk assessment for lasso retrieval tasks?

    <p>Line of fire potential during retrieval tasks.</p> Signup and view all the answers

    Study Notes

    Lasso Retrieval Incident

    • An incident occurred during the retrieval of a "lasso" used for buoy recovery.
    • The lasso is made of UHMWPE (Ultra-High Molecular Weight Polythene) fibre rope.
    • The rope was initially designed to dissipate energy quickly if it snapped under tension, preventing whiplash.
    • The plan was changed from manually retrieving the rope to using a tugger.
    • Despite the change in method, the work party remained in their original positions.
    • The rope came under tension and snapped free from the stopper pin on the starboard side of the vessel.
    • The rope travelled upwards and to port, passing over the head of the injured person (IP) before landing on the deck.
    • The rope contacted the IP's leg, causing him to fall and sustain minor injuries.
    • The chain section of the lasso landed near the IP.

    Incident Cause

    • The operation shifted from a Manual Handling Task to a Lifting and Hoisting Operation without a sufficient risk assessment.
    • Due to the lack of risk assessment, the work party remained in their original positions, placing them in the line of fire.
    • The activity was being monitored by a supervisor who did not stop the job after the plan changed.

    Corrective Actions

    • Procedures were updated to ensure vessel stopper pins are retracted during lasso retrieval tasks.
    • The risk assessment was enhanced to include the potential line of fire during lasso retrieval tasks.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    More Like This

    Untitled Quiz
    6 questions

    Untitled Quiz

    AdoredHealing avatar
    AdoredHealing
    Untitled Quiz
    19 questions

    Untitled Quiz

    TalentedFantasy1640 avatar
    TalentedFantasy1640
    Untitled Quiz
    18 questions

    Untitled Quiz

    RighteousIguana avatar
    RighteousIguana
    Untitled Quiz
    50 questions

    Untitled Quiz

    JoyousSulfur avatar
    JoyousSulfur
    Use Quizgecko on...
    Browser
    Browser