Which type of construction is permitted for a building classified as Group B, Division 3, up to 3 storeys, sprinklered?

Both combustible and noncombustible construction

What is the maximum building area allowed for a Group B, Division 3 building that is 3 storeys in height and sprinklered?

1,800 m2

What is the minimum fire-resistance rating required for mezzanines in a Group B, Division 3 building that is 2 storeys in height and sprinklered?

45 minutes

Which type of construction is permitted for a building classified as Group C, up to 6 storeys, sprinklered?

Noncombustible construction only

What is the minimum fire-resistance rating required for floor assemblies in a Group C building?

1 hour

What is the maximum building area allowed for a Group B, Division 3 building that is 1 storey in height and sprinklered?

2,400 m2

What is the maximum building area allowed for a Group C building that is any height and any area, and sprinklered?

Unlimited

What is the minimum fire-resistance rating required for loadbearing walls, columns, and arches in a Group B, Division 3 building?

1 hour

What is the maximum building area allowed for a Group B, Division 3 building that is 2 storeys in height and sprinklered?

2,700 m2

What is the minimum fire-resistance rating required for floor assemblies in a Group B, Division 3 building?

30 minutes

Which type of construction is required for a building classified as Group C, up to 3 storeys in building height?

Noncombustible construction

Which of the following is a requirement for floor assemblies in a building that contains dwelling units with more than one storey?

They must have a fire-resistance rating of at least 1 hour

Which of the following is a requirement for mezzanines in a building classified as Group C, up to 6 storeys, and sprinklered throughout?

They must have a fire-resistance rating of at least 1 hour

What is the maximum building area allowed for a building classified as Group C, up to 3 storeys, facing 1 street?

6,000 m2

What is the maximum building area allowed for a building classified as Group C, up to 6 storeys, sprinklered throughout, and 3 storeys in building height?

3,000 m2

What is the maximum building area allowed for a building classified as Group C, up to 6 storeys, sprinklered throughout, and 6 storeys in building height?

1,500 m2

What is the maximum building area allowed for a building classified as Group C, up to 6 storeys, sprinklered throughout, and 4 storeys in building height?

3,000 m2

What is the maximum building area allowed for a building classified as Group C, up to 6 storeys, sprinklered throughout, and 1 storey in building height?

1,800 m2

What is the maximum building area allowed for a building classified as Group C, up to 6 storeys, sprinklered throughout, and 2 storeys in building height?

4,500 m2

What is the maximum building area allowed for a building classified as Group C, up to 6 storeys, sprinklered throughout, and 5 storeys in building height?

1,800 m2

Which one of these is a requirement for a building classified as Group B, Division 2?

It must be sprinklered throughout

Which one of these is a requirement for a building classified as Group B, Division 3?

It must have a building area of at least 500 m2

What is the maximum building area allowed for a building classified as Group B, Division 3 with 2 storeys in building height?

12,000 m2

What is the minimum fire-resistance rating required for mezzanines in a building classified as Group B, Division 3?

1 h

Which one of these is a requirement for a building classified as Group B, Division 3 up to 3 storeys in building height?

It must be sprinklered throughout

What is the maximum building area allowed for a building classified as Group B, Division 3 with 3 storeys in building height?

8,000 m2

Which one of these is a requirement for a building classified as Group B, Division 3 up to 3 storeys in building height?

It must be of noncombustible construction

What is the minimum fire-resistance rating required for loadbearing walls, columns, and arches in a building classified as Group B, Division 3?

2 h

Which one of these is a requirement for a building classified as Group B, Division 2?

It must not be sprinklered throughout

What is the maximum building area allowed for a building classified as Group B, Division 3 with 1 storey in building height?

Not limited

True or false: The maximum building area allowed for a Group B, Division 3 building that is 3 storeys in height and sprinklered is 5,400 m2.

True

True or false: The minimum fire-resistance rating required for floor assemblies in a Group C building is 45 minutes.

False

True or false: A building classified as Group B, Division 2 is permitted to be of combustible construction.

False

True or false: A building classified as Group B, Division 2 can be of combustible construction or noncombustible construction.

True

True or false: A building classified as Group B, Division 3 shall be of noncombustible construction.

True

True or false: A building classified as Group B, Division 3 can have a building area of more than 8,000 m2 if it is 3 storeys in building height.

False

A building classified as Group C, up to 3 storeys, noncombustible construction, is permitted to have a building area of 6,000 m2 if facing 2 streets.

False

In a building that contains dwelling units with more than one storey, the floor assemblies need to have a fire-resistance rating not less than 1 h and be constructed as fire separations.

False

A building classified as Group C, up to 6 storeys, sprinklered throughout, and 3 storeys in building height, is permitted to have a maximum building area of 9,000 m2.

False

In a building that contains dwelling units with more than one storey, the floor assemblies need to have a fire-resistance rating not less than 1 h and be constructed as fire separations.

False

Test your knowledge on the requirements for Group B, Division 2 buildings that are one storey and sprinklered. Determine the permitted construction materials and other specifications for this type of building.

Make Your Own Quizzes and Flashcards

Convert your notes into interactive study material.

Get started for free

More Quizzes Like This

NBC 2015 - Section 3.2 - 05
40 questions
Locales y zonas de riesgo especial
8 questions
Special Risk Areas and Zones
6 questions
Use Quizgecko on...
Browser
Browser