Giraffe Drone Design and Development
10 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

The Testing and Documentation phase is a required phase in the project.

False

The ISO 14001 standard is designed to meet customer expectations.

False

The ASME regulations are used to ensure timely and budget-friendly completion of the project.

False

The OSHA standard is used to minimize waste and pollution in the biodigester system.

<p>False</p> Signup and view all the answers

The PMI standard is used to guarantee the accuracy and safety of the design.

<p>False</p> Signup and view all the answers

The Break-even Chart is used in the Task scheduling phase.

<p>False</p> Signup and view all the answers

The ISO 14001 standard is used to preserve workers in the biodigester system.

<p>False</p> Signup and view all the answers

The MATLAB software is used in the Simulation Study of the Hybrid Drone.

<p>True</p> Signup and view all the answers

The ISO 9001 standard is used to minimize waste and pollution in the biodigester system.

<p>False</p> Signup and view all the answers

The chosen standard for the project is ISO 14001 because it relates more to the project.

<p>True</p> Signup and view all the answers

More Like This

Use Quizgecko on...
Browser
Browser