Generating Inspection Checklist with Inspection Lots in SAP Business Objects BW
28 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What needs to be configured to enable entries in the action log of a piece of equipment?

  • Activate the change documents for the equipment category.
  • Define the corresponding history related field for the equipment reference category.
  • Define history related fields in the usage period customizing. (correct)
  • Activate the change documents for the equipment reference category.
  • With the Report and Repair Malfunction SAPUI5 app, which activities can a technician perform?

  • Schedule and Dispatch
  • Complete and Close Report (correct)
  • Release and Start Work
  • Release and Print
  • In a multiple-counter plan, which scheduling parameters are typically used?

  • Scheduling indicator
  • Start date
  • Scheduling period (correct)
  • Factory calendar
  • When a planner adds non-stock material in a released maintenance order, what options become available within the order?

    <p>Issue and Reserve</p> Signup and view all the answers

    Which action is necessary to view change documents of an equipment category?

    <p>Activate the change documents for the equipment category.</p> Signup and view all the answers

    What function can be performed using the 'Report and Repair Malfunction SAPUI5' app besides closing reports?

    <p>Release and Start Work</p> Signup and view all the answers

    What requirements need to be fulfilled to generate an Inspection Checklist with Inspection Lots?

    <p>A PM task list with inspection point type must be assigned to the maintenance order</p> Signup and view all the answers

    How does the work center influence cost calculation in the maintenance order?

    <p>Via cost center and activity type</p> Signup and view all the answers

    Which components are part of cloud-based SAP Intelligent Asset Management?

    <p>SAP Asset Performance Management</p> Signup and view all the answers

    What is one of the correct requirements for generating an Inspection Checklist with Inspection Lots?

    <p>Direct assignment of a technical object to an inspection plan</p> Signup and view all the answers

    In what way does the work center impact cost calculation in maintenance orders?

    <p>By linking cost center and activity type</p> Signup and view all the answers

    What is the passing percentage for the exam mentioned in the text?

    <p>68</p> Signup and view all the answers

    Where can a maintenance technician document work steps for a technical object in a notification according to the text?

    <p>A task in the notification item</p> Signup and view all the answers

    In a notification item, what can be assigned according to the text?

    <p>One or more causes of damage</p> Signup and view all the answers

    What is the exam duration for the exam mentioned in the text?

    <p>3 Hours</p> Signup and view all the answers

    Where can one assign object parts in a notification item according to the text?

    <p>One or more object parts</p> Signup and view all the answers

    What should a maintenance technician do to support the Report and Repair Malfunction app?

    <p>Verify planned and actual costs in the malfunction report</p> Signup and view all the answers

    How can a material BOM be assigned to a piece of equipment?

    <p>Via creation of an equipment BOM</p> Signup and view all the answers

    To display vehicle-specific data for a piece of equipment, what step should be taken?

    <p>Assigning a view profile to equipment category and vehicle class</p> Signup and view all the answers

    In a cross-plant planning scenario, what is a consideration regarding multiple maintenance plants?

    <p>Multiple maintenance plants are assigned to a planning plant</p> Signup and view all the answers

    Which task is not part of supporting the maintenance technician in the Report and Repair Malfunction app?

    <p>Assigning a view profile to vehicle type and equipment category</p> Signup and view all the answers

    What is a required step when working with material BOMs and pieces of equipment?

    <p>Assigning a view profile to an equipment category for fleet equipment</p> Signup and view all the answers

    What differentiates a maintenance request within the phase-based process from a maintenance notification in the standard process?

    <p>It contains an additional screening phase where requests can be accepted or rejected.</p> Signup and view all the answers

    In the context of Task List operations, how can you ensure that the operation 'pump inspection' is ignored when 'pump replacement' occurs?

    <p>Set the lead float</p> Signup and view all the answers

    When creating a single-cycle maintenance plan with a 12-month cycle and orders to be called 3 months before the planned date, what would you do?

    <p>Set the offset to 3 months</p> Signup and view all the answers

    What is a key characteristic of a maintenance request within the phase-based process according to the text?

    <p>It involves a screening phase for acceptance or rejection</p> Signup and view all the answers

    In the context of Task List operations, what is necessary to ensure proper sequence and execution?

    <p>Establishing a logical hierarchy of tasks</p> Signup and view all the answers

    What aspect distinguishes a maintenance request from a maintenance notification based on the information provided?

    <p>'Pump inspection' operation inclusion</p> Signup and view all the answers

    More Like This

    Use Quizgecko on...
    Browser
    Browser