In accordance with the text, who is responsible for providing access, facilities, permissions, and safety equipment for examination, inspection, measurement, and testing of materials and workmanship?

  • The Engineer
  • The Contractor (correct)
  • The Employer's Personnel
  • The Manufacturer
  • According to the text, when must the Contractor give notice to the Engineer?

  • Whenever any work is ready and before it is covered up, put out of sight, or packaged for storage or transport (correct)
  • After the work is covered up or packaged for storage or transport
  • Only when specifically requested by the Engineer
  • At the end of the project
  • As per the text, who is entitled to examine, inspect, measure, and test the materials and workmanship during production, manufacture, and construction?

  • Manufacturer
  • Contractor
  • Employer's Personnel (correct)
  • Engineer
  • As per the text, who is responsible for providing all apparatus, assistance, documents, and other necessary resources for carrying out specified tests efficiently?

    <p>The Contractor</p> Signup and view all the answers

    According to the text, who should agree with the Engineer the time and place for the specified testing of any Plant, Materials, and other parts of the Works?

    <p>The Contractor</p> Signup and view all the answers

    In the context of the text, who is responsible for submitting samples of Materials to the Engineer for consent prior to using the Materials in or for the Works?

    <p>The Contractor</p> Signup and view all the answers

    As per the text, who has the responsibility to reinstate and make good if the Contractor fails to give notice to the Engineer when any work is ready and before it is covered up, put out of sight, or packaged for storage or transport?

    <p>The Contractor, at the Contractor’s cost</p> Signup and view all the answers

    According to the text, who shall carry out the examination, inspection, measurement, or testing without unreasonable delay, or promptly give notice to the Contractor that the Engineer does not require to do so?

    <p>The Engineer</p> Signup and view all the answers

    In the context of the text, who should provide access to all parts of the Site and to all places from which natural Materials are being obtained?

    <p>The Employer's Personnel</p> Signup and view all the answers

    What is the responsibility of the contractor upon the issue of a Taking-Over Certificate?

    <p>Clear away and remove all equipment, surplus material, and rubbish from the part of the site to which the certificate refers</p> Signup and view all the answers

    What is the definition of 'nominated Subcontractor' as per the contract?

    <p>A subcontractor stated in the contract or instructed by the Engineer under Variations and Adjustments</p> Signup and view all the answers

    What rights does the contractor have in relation to a nominated subcontractor?

    <p>The contractor has the right to raise reasonable objections to a nominated subcontractor and is not obligated to employ them if objections are raised promptly</p> Signup and view all the answers

    Under what circumstances can the engineer request evidence of previous payments before issuing a Payment Certificate to a nominated subcontractor?

    <p>If the contractor fails to provide evidence of previous payments</p> Signup and view all the answers

    What is the responsibility of the contractor regarding the payment, housing, feeding, and transport for all staff and labor on the construction site?

    <p>The contractor is responsible for engaging and arranging payment, housing, feeding, and transport for all staff and labor on the construction site, unless otherwise stated in the Specification</p> Signup and view all the answers

    What must the contractor do in relation to rates of wages and labor conditions?

    <p>The contractor must pay rates of wages and observe labor conditions not lower than those established for the trade or industry where the work is carried out</p> Signup and view all the answers

    Under what circumstances is the contractor entitled to an extension of time and payment?

    <p>The contractor is entitled to an extension of time and payment for any delay or cost incurred in complying with instructions related to fossils and other findings</p> Signup and view all the answers

    According to the text, what should the Contractor do if no established rates or conditions are applicable?

    <p>Pay rates of wages and observe conditions not lower than the general level of wages and conditions observed locally by similar employers.</p> Signup and view all the answers

    What is the Contractor prohibited from doing in relation to the Employer’s Personnel?

    <p>Recruit or attempt to recruit staff and labor.</p> Signup and view all the answers

    What is the Contractor required to comply with in relation to labor Laws?

    <p>All relevant labor Laws applicable to the Contractor’s Personnel.</p> Signup and view all the answers

    When can work be carried out on the Site on locally recognized days of rest or outside normal working hours?

    <p>If otherwise stated in the Contract, with Engineer's consent, or if work is unavoidable or necessary for safety.</p> Signup and view all the answers

    What is the Contractor responsible for providing and maintaining for the Contractor’s Personnel?

    <p>All necessary accommodation and welfare facilities.</p> Signup and view all the answers

    What is the Contractor required to do in terms of health and safety?

    <p>Take all reasonable precautions to maintain the health and safety of the Contractor’s Personnel.</p> Signup and view all the answers

    What is required of the Contractor in terms of superintendence during the execution of the Works?

    <p>Provide all necessary superintendence to ensure satisfactory and safe execution of the Works.</p> Signup and view all the answers

    According to the text, what is the responsibility of the Contractor regarding unauthorised persons on the Site?

    <p>The Contractor shall be responsible for keeping unauthorised persons off the Site.</p> Signup and view all the answers

    What personnel are authorized to be on the Site according to the text?

    <p>Contractor’s Personnel, Employer’s Personnel, and personnel notified to the Contractor by the Employer or the Engineer</p> Signup and view all the answers

    What is the Contractor required to do with Contractor’s Equipment and Contractor’s Personnel during operations on the Site?

    <p>The Contractor shall confine his operations to the Site and keep Contractor’s Equipment and Contractor’s Personnel within the Site and any additional agreed areas.</p> Signup and view all the answers

    What is the Contractor’s responsibility regarding unnecessary obstruction on the Site during the execution of the Works?

    <p>The Contractor shall keep the Site free from all unnecessary obstruction.</p> Signup and view all the answers

    What is the Contractor required to do with surplus materials during the execution of the Works?

    <p>The Contractor shall store or dispose of any surplus materials.</p> Signup and view all the answers

    What is the Contractor’s responsibility regarding adjacent land during operations on the Site?

    <p>The Contractor shall take all necessary precautions to keep Contractor’s Equipment and Contractor’s Personnel off adjacent land.</p> Signup and view all the answers

    What is the Contractor responsible for in terms of authorized personnel of the Employer’s other contractors on the Site?

    <p>The Contractor is responsible for personnel notified to the Contractor, by the Employer or the Engineer, as authorized personnel of the Employer’s other contractors on the Site.</p> Signup and view all the answers

    What is the Contractor's responsibility regarding the security of the Site?

    <p>Preventing unauthorised access and limiting authorised personnel to specified individuals</p> Signup and view all the answers

    What must the Contractor do with Contractor’s Equipment and Contractor’s Personnel during operations on the Site?

    <p>Confine them to the Site and additional agreed areas, and keep them off adjacent land</p> Signup and view all the answers

    When must the Contractor give notice to the Engineer?

    <p>When any work is ready and before it is covered up, put out of sight, or packaged for storage or transport</p> Signup and view all the answers

    What is the Contractor required to do with surplus materials during the execution of the Works?

    <p>Store or dispose of them</p> Signup and view all the answers

    Who is entitled to examine, inspect, measure, and test the materials and workmanship during production, manufacture, and construction?

    <p>The Engineer and authorized personnel</p> Signup and view all the answers

    What is the Contractor's responsibility regarding unnecessary obstruction on the Site during the execution of the Works?

    <p>Keep the Site free from all unnecessary obstruction</p> Signup and view all the answers

    Under what circumstances can the engineer request evidence of previous payments before issuing a Payment Certificate to a nominated subcontractor?

    <p>If there are concerns about the subcontractor's financial stability</p> Signup and view all the answers

    Study Notes

    Construction Contract Conditions Summary

    • The contractor is responsible for clearing away and removing any unnecessary wreckage, rubbish, and temporary works from the site.
    • Upon the issue of a Taking-Over Certificate, the contractor must clear away and remove all equipment, surplus material, and rubbish from the part of the site to which the certificate refers.
    • Fossils, coins, and items of geological or archaeological interest found on the site are under the care of the employer, and the contractor must prevent their removal or damage.
    • The contractor is entitled to an extension of time and payment for any delay or cost incurred in complying with instructions related to fossils and other findings.
    • The term "nominated Subcontractor" is defined as a subcontractor stated in the contract or instructed by the Engineer under Variations and Adjustments.
    • The contractor has the right to raise reasonable objections to a nominated subcontractor and is not obligated to employ them if objections are raised promptly.
    • The contractor must pay the nominated subcontractor the amounts certified by the Engineer in accordance with the subcontract, and these amounts are included in the Contract Price.
    • Before issuing a Payment Certificate to a nominated subcontractor, the engineer may request evidence of previous payments, and the employer may pay the subcontractor directly if the contractor fails to provide evidence.
    • The contractor is responsible for engaging and arranging payment, housing, feeding, and transport for all staff and labor on the construction site, unless otherwise stated in the Specification.
    • The contractor must pay rates of wages and observe labor conditions not lower than those established for the trade or industry where the work is carried out.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Related Documents

    Red 1999-21-84-16-20 PDF

    Description

    Test your knowledge of construction contract conditions with this quiz covering responsibilities, subcontractors, payments, and labor conditions.

    More Like This

    Construction Contract Quiz
    32 questions

    Construction Contract Quiz

    InstrumentalMajesty avatar
    InstrumentalMajesty
    Arahan Pegawai Penguasa dalam Kontrak
    14 questions
    Construction Contracts and Specifications Quiz
    40 questions
    Construction Contract Life Cycle Quiz
    88 questions
    Use Quizgecko on...
    Browser
    Browser