Fire & Safety Equipment Procedures Quiz
34 Questions
0 Views

Fire & Safety Equipment Procedures Quiz

Created by
@HardierBowenite2483

Podcast Beta

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What should be done prior to any authorized work on live electrical circuits?

  • Isolate the transformers
  • Comply with safety requirements (correct)
  • Prepare a Joint Supply Agreement (JSA)
  • Prepare a Hot Work permit
  • Who is responsible for supervising the isolation of breakers at medium voltage levels above 400 V and up to 13.8 kilo V?

  • Electrical Maintenance Personnel (correct)
  • Safety Inspectors
  • Engineering Department
  • Operation personnel
  • What should be done when de-energizing transformers according to the text?

  • Open the breakers for both primary and secondary
  • Close the ground switches
  • Isolate the transformers from all supplies
  • Draw out the respective fuses (correct)
  • Who should enter an enclosure containing high voltage circuits?

    <p>Authorized Persons only</p> Signup and view all the answers

    What should be done with keys of enclosures containing high voltage apparatus?

    <p>Kept securely under lock</p> Signup and view all the answers

    In what condition should female plugs be kept according to the text?

    <p>&quot;Capped&quot;</p> Signup and view all the answers

    How should live parts of electrical equipment operating at 50 volts or more be guarded against according to the text?

    <p>&quot;Guard&quot; against accidental contact</p> Signup and view all the answers

    What should be provided if flexible cords are exposed to sparks or molten slogs?

    <p>&quot;Cover protection&quot;</p> Signup and view all the answers

    What is required for temporary electrical connections and flexible cords to conform to according to the text?

    <p>&quot;Standard electrical codes&quot;</p> Signup and view all the answers

    What action should be taken by live parts of electrical equipment operating at 50 volts or more?

    <p>Be grounded</p> Signup and view all the answers

    Who is responsible for ensuring that all electrical maintenance adheres to the provided Method in the TPC plant?

    <p>The Maintenance Manager</p> Signup and view all the answers

    What should be done with tools that have defective cords or exposed wiring?

    <p>They should be taken out of service</p> Signup and view all the answers

    Which type of ladders are recommended for work on electrical systems?

    <p>Nonmetallic ladders</p> Signup and view all the answers

    What is the requirement for portable electrical tools and cables before use?

    <p>They should be double insulated or grounded</p> Signup and view all the answers

    Who is permitted to work on electrical equipment according to the guidelines?

    <p>Only qualified personnel</p> Signup and view all the answers

    What should be done before de-energizing electrical equipment?

    <p>Proper turnover from Operation to Maintenance</p> Signup and view all the answers

    What is the significance of adhering to the Method in any electrical work activity?

    <p>To ensure safe maintenance practices</p> Signup and view all the answers

    What should be done if wires, switches, etc. need maintenance?

    <p>Ensure qualified personnel are handling them</p> Signup and view all the answers

    If a new employee wants to work on electrical systems, what should be considered?

    <p>Ensure they are qualified before allowing them to work</p> Signup and view all the answers

    What happens if an unqualified person attempts to work on electrical equipment?

    <p>They are subject to disciplinary action</p> Signup and view all the answers

    When can work be performed on electrical equipment?

    <p>After the equipment is de-energized and locked out</p> Signup and view all the answers

    What are employees required to do if any defects are detected in portable electrical equipment?

    <p>Immediately repair or replace the equipment</p> Signup and view all the answers

    What must be done if broken switches and sockets are found?

    <p>Replace them immediately</p> Signup and view all the answers

    What must be done before using personal protective equipment for work on electrical live equipment?

    <p>Air test it before each use</p> Signup and view all the answers

    What should employees do if there is a potential for injury, fire, explosion, or property damage during electrical work?

    <p>Report unsafe conditions and stop electrical work</p> Signup and view all the answers

    How far away must employees keep themselves and any material from overhead power lines/conductors?

    <p>At least 10 feet away</p> Signup and view all the answers

    What is the requirement regarding opening receptacle covers or switch plates of electrical equipment?

    <p>Should not be opened without proper authorization</p> Signup and view all the answers

    What action is needed before working on systems with static storage devices like capacitors?

    <p>Ensure all static charges have been safely removed by earthing conductors</p> Signup and view all the answers

    What is the maximum voltage limit for temporary electrical equipment used inside confined spaces?

    <p>24 volts</p> Signup and view all the answers

    What should be done to ensure the safe use of temporary electrical facilities in confined spaces?

    <p>Conduct daily inspections for defects</p> Signup and view all the answers

    What should be checked in grounding clamps and cables for temporary electrical equipment?

    <p>Tightness and exposure</p> Signup and view all the answers

    Why should temporary electrical equipment not be used as permanent equipment?

    <p>To ensure safety and immediate removal after work completion</p> Signup and view all the answers

    Who must authorize individuals to work on de-energized transmission and distribution circuits or apparatus?

    <p>Responsible Authorized Person of the facility</p> Signup and view all the answers

    What is the maximum allowed ground resistance while carrying out grounding?

    <p>1.0 Ohm</p> Signup and view all the answers

    More Quizzes Like This

    Safe Work Practices and Procedures Quiz
    10 questions
    Lab Safety Procedures - Science Class
    10 questions
    Laboratory Safety Procedures Quiz
    10 questions

    Laboratory Safety Procedures Quiz

    FashionableGyrolite9119 avatar
    FashionableGyrolite9119
    Safety Procedures for Work Areas
    24 questions
    Use Quizgecko on...
    Browser
    Browser