Questions and Answers

What information could be required by the AHJ for permitting purposes?

  • Local climate data for the installation area
  • Information on the first responders' shift schedules
  • Historical data on the reliability of LIB-based ESS
  • Plans and specifications related to the ESS installation, commissioning, and use (correct)
  • Who should have access to the plans and specifications of the ESS installation?

  • Local government officials
  • Battery manufacturers
  • Utility providers
  • Facility owner/operator (correct)
  • What is an important consideration for municipalities when choosing a regulatory approach for battery ESS?

  • Manufacturer's recommendations
  • Federal regulations
  • Historical trends in energy storage
  • Local application or requirements (correct)
  • Why might there be multiple approaches to regulating certain aspects of battery ESS?

    <p>Diverse application scenarios</p> Signup and view all the answers

    What could be included in the installation information of a LIB-based ESS?

    <p>Commissioning procedures</p> Signup and view all the answers

    What documentation should be available where an LIB-based ESS is installed?

    <p>Quantities and types of ESS units</p> Signup and view all the answers

    What kind of information should be provided in addition to plans and specifications according to NFPA 855?

    <p>Fire and explosion test data</p> Signup and view all the answers

    What additional information could be required by AHJs prior to commissioning an ESS installation?

    <p>Analysis of live loads associated with the ESS installation</p> Signup and view all the answers

    Which type of systems should have details related to fire suppression/protection, smoke or fire detection, gas detection, etc.?

    <p>ESS systems</p> Signup and view all the answers

    What is NOT a type of information that could be required for permitting an ESS installation?

    <p>The weather conditions on the installation day</p> Signup and view all the answers

    What is the importance of identifying stakeholders early in the fire protection design process?

    <p>To evaluate whether the requirements of NFPA 855 are adequate</p> Signup and view all the answers

    Which of the following is NOT considered as an input to the HMA process according to the text?

    <p>NFPA 810</p> Signup and view all the answers

    Why should stakeholders establish goals and objectives early in the fire protection design process?

    <p>To determine if NFPA 855 requirements are sufficient</p> Signup and view all the answers

    Which of the following is NOT mentioned as a component of 'General Inputs' to the HMA process?

    <p>NFPA 805</p> Signup and view all the answers

    What should be considered when establishing the acceptability of fire and explosion protection levels?

    <p>Stakeholders' perspectives</p> Signup and view all the answers

    Which document is NOT included in the list of 'Other references' for the HMA process?

    <p>NFPA 810</p> Signup and view all the answers

    More Like This

    Industrial Design Protection Quiz
    5 questions
    Environmental Protection in Design
    9 questions

    Environmental Protection in Design

    UserReplaceableCerium5304 avatar
    UserReplaceableCerium5304
    Topic 3: IP rights, trademarks and design
    48 questions
    Use Quizgecko on...
    Browser
    Browser