What is the formula to calculate the minimum number of workstations required?

  • N = (∑t / CT)
  • N = (∑t) / CT (correct)
  • N = CT / t
  • N = (CT / ∑t)
  • What is the purpose of a precedence diagram?

  • To determine the minimum number of workstations required
  • To show elemental tasks and their precedence requirements (correct)
  • To show the physical arrangement of resources
  • To calculate the percent idle time
  • What type of layout is used when the product is larger and cannot be moved?

  • Fixed-position layout (correct)
  • Process layout
  • Product layout
  • Hybrid layout
  • What is the efficiency of a process calculated by?

    <p>1 - Percent idle time</p> Signup and view all the answers

    What is the formula to calculate the percent idle time?

    <p>Idle time per cycle / (N)(CT)</p> Signup and view all the answers

    What is the main purpose of layout planning?

    <p>To decide on the best physical arrangement of resources</p> Signup and view all the answers

    What is the last step in designing a product layout?

    <p>Compute efficiency and balance delay</p> Signup and view all the answers

    What is an advantage of hybrid layouts?

    <p>They combine elements of both process and product layouts</p> Signup and view all the answers

    What is the key trade-off in designing open concept offices?

    <p>Proximity and privacy</p> Signup and view all the answers

    What is the primary objective of facilities layout design?

    <p>Use workers and space efficiently</p> Signup and view all the answers

    What is an advantage of product layout?

    <p>High rate of output</p> Signup and view all the answers

    What is a disadvantage of product layout?

    <p>Fairly inflexible to changes in volume</p> Signup and view all the answers

    What is the purpose of line balancing in product layout design?

    <p>To assign tasks to workstations with equal time requirements</p> Signup and view all the answers

    What is cycle time in product layout design?

    <p>The maximum time allowed at each workstation to complete its set of tasks</p> Signup and view all the answers

    Why is office landscaping important in open concept offices?

    <p>To help solve the privacy issue</p> Signup and view all the answers

    What is one of the considerations in designing product layouts?

    <p>The sequence of tasks to be performed by each workstation</p> Signup and view all the answers

    Study Notes

    Psychological Needs of the Organization

    • Open concept offices promote understanding and trust among employees
    • Flexible layouts incorporating "office landscaping" can help solve the privacy issue in open office environments

    Facilities Layout

    • The configuration of departments, work centers, and equipment, with an emphasis on the movement of work (customers or materials) through the system
    • Objective of layout design:
      • Use workers and space efficiently
      • Avoid bottlenecks
      • Minimize unnecessary material handling costs
      • Eliminate unnecessary movement of workers or materials
      • Minimize production time or customer service time
      • Design for safety

    Product Layout

    • Advantages:
      • High rate of output
      • Low unit cost
      • Labor specialization
      • Low material handling cost
      • High utilization of labor and equipment
    • Disadvantages:
      • Inflexible to changes in volume
      • Needs preventive maintenance
      • Individual incentive plans are impractical
      • Poorly skilled workers

    Line Balancing

    • The process of assigning tasks to workstations to have approximately equal time requirements
    • Cycle time: the maximum time allowed at each workstation to complete its set of tasks on a unit
    • Formula to determine the minimum number of workstations required: N = (∑t) / CT
    • Formula to calculate percent idle time: Percent idle time = Idle time per cycle (N)(CT) / CT
    • Formula to calculate efficiency: Efficiency = 1 - Percent idle time

    Precedence Diagram

    • A diagram that shows elemental tasks and their precedence requirements
    • Used to determine the minimum number of workstations required

    Layout Planning

    • Deciding on the best physical arrangement of resources within a facility
    • Importance: efficient running of a business, reduces wasted time and energy
    • Four basic types of layouts: process, product, hybrid, and fixed position
    • Process layouts: group resources based on similar processes
    • Product layouts: arrange resources in a straight-line fashion
    • Hybrid layouts: combine elements of process and product layouts
    • Fixed-position layouts: occur when the product is larger and cannot be moved

    Designing Process and Product Layouts

    • Steps for designing process layouts:
      • Gather information about space needs, space availability, and closeness requirements
      • Develop a block plan or schematic of the layout
      • Develop a detailed layout
    • Steps for designing product layouts:
      • Identify tasks that need to be performed and their immediate predecessors
      • Determine output rate
      • Determine cycle time
      • Compute the theoretical minimum number of workstations
      • Assign tasks to workstations
      • Compute efficiency and balance delay

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    This quiz covers the psychological needs of organizations, open concept offices, and designing product layouts. It discusses the trade-off between proximity and privacy, and how flexible layouts can help solve privacy issues.

    More Like This

    Use Quizgecko on...
    Browser
    Browser