Podcast
Questions and Answers
Initial ______________ Examination (IEE) is an assessment tool to evaluate the environmental impact of a project.
Initial ______________ Examination (IEE) is an assessment tool to evaluate the environmental impact of a project.
Environmental
Environmental Impact Assessment (EIA) is a systematic evaluation of a project to ensure it is ______________ sustainable.
Environmental Impact Assessment (EIA) is a systematic evaluation of a project to ensure it is ______________ sustainable.
environmentally
The main objective of EIA is to identify and reduce ______________ environmental impacts.
The main objective of EIA is to identify and reduce ______________ environmental impacts.
adverse
Environmental assessment is also known as ______________ influence assessment and environment quality assessment.
Environmental assessment is also known as ______________ influence assessment and environment quality assessment.
Signup and view all the answers
Environmental assessment predicts and analyzes the ______________ of human activities on the environment.
Environmental assessment predicts and analyzes the ______________ of human activities on the environment.
Signup and view all the answers
The narrow sense of environmental assessment refers to the prediction and analysis of the ______________ of a construction project.
The narrow sense of environmental assessment refers to the prediction and analysis of the ______________ of a construction project.
Signup and view all the answers
Environmental assessment is used to propose ______________ countermeasures to prevent environmental impacts.
Environmental assessment is used to propose ______________ countermeasures to prevent environmental impacts.
Signup and view all the answers
EIA is a tool to ensure that development projects are ______________ feasible and socio-culturally acceptable.
EIA is a tool to ensure that development projects are ______________ feasible and socio-culturally acceptable.
Signup and view all the answers
The ______ is responsible for conducting an environmental study.
The ______ is responsible for conducting an environmental study.
Signup and view all the answers
The ______ report is prepared before starting the construction work.
The ______ report is prepared before starting the construction work.
Signup and view all the answers
The ______ is a brief environmental study.
The ______ is a brief environmental study.
Signup and view all the answers
The ______ assesses the environmental impact of a project.
The ______ assesses the environmental impact of a project.
Signup and view all the answers
An important tool in assuring that the proposed projects and plans won’t give any adverse impact on the ______ is Environmental Impact Assessment.
An important tool in assuring that the proposed projects and plans won’t give any adverse impact on the ______ is Environmental Impact Assessment.
Signup and view all the answers
The ______ is a preliminary environmental examination.
The ______ is a preliminary environmental examination.
Signup and view all the answers
The ______ must be obtained before starting a project.
The ______ must be obtained before starting a project.
Signup and view all the answers
Environmental Impact Assessment is a ______ and management tool for studying and evaluating potential environmental consequences of proposed development projects.
Environmental Impact Assessment is a ______ and management tool for studying and evaluating potential environmental consequences of proposed development projects.
Signup and view all the answers
The ______ is responsible for implementing the project.
The ______ is responsible for implementing the project.
Signup and view all the answers
One of the purposes of Environmental Impact Assessment is to ______ whether adverse impacts can be mitigated.
One of the purposes of Environmental Impact Assessment is to ______ whether adverse impacts can be mitigated.
Signup and view all the answers
The role of environmental assessment involves ______ of information.
The role of environmental assessment involves ______ of information.
Signup and view all the answers
The ______ must be submitted to the government every 6 months.
The ______ must be submitted to the government every 6 months.
Signup and view all the answers
The National Environment Protection Act was formulated in ______ in the US.
The National Environment Protection Act was formulated in ______ in the US.
Signup and view all the answers
The Seventh Five Year Plan in Nepal was the first to incorporate a national level policy on ______ management.
The Seventh Five Year Plan in Nepal was the first to incorporate a national level policy on ______ management.
Signup and view all the answers
The Eighth Five Year Plan in Nepal anticipated the establishment of a national system for ______.
The Eighth Five Year Plan in Nepal anticipated the establishment of a national system for ______.
Signup and view all the answers
According to the Eighth Five Year Plan, EIA should be conducted at the stage of ______ study.
According to the Eighth Five Year Plan, EIA should be conducted at the stage of ______ study.
Signup and view all the answers
The report should be prepared in Nepali language, but in case of foreign ______, it can be prepared in English language.
The report should be prepared in Nepali language, but in case of foreign ______, it can be prepared in English language.
Signup and view all the answers
The report should be prepared by a team of experts with ______ qualifications and experience.
The report should be prepared by a team of experts with ______ qualifications and experience.
Signup and view all the answers
The report should include a ______ summary and a brief report in Nepali language.
The report should include a ______ summary and a brief report in Nepali language.
Signup and view all the answers
A ______ notice of 7 days should be published in a newspaper for public hearing and feedback.
A ______ notice of 7 days should be published in a newspaper for public hearing and feedback.
Signup and view all the answers
The investor should provide a ______ and signature in the report.
The investor should provide a ______ and signature in the report.
Signup and view all the answers
The report should include a ______ permission letter from the forest or national park.
The report should include a ______ permission letter from the forest or national park.
Signup and view all the answers
The report should include a ______ of the public hearing, including the names, addresses, and contact details of participants.
The report should include a ______ of the public hearing, including the names, addresses, and contact details of participants.
Signup and view all the answers
The report should include ______ test results from the laboratory and maps.
The report should include ______ test results from the laboratory and maps.
Signup and view all the answers
To conduct an environmental study, the team should have at least ______ members with a bachelor's degree in environmental science, environmental management or environmental engineering.
To conduct an environmental study, the team should have at least ______ members with a bachelor's degree in environmental science, environmental management or environmental engineering.
Signup and view all the answers
The ______ is responsible for granting permission for project operation.
The ______ is responsible for granting permission for project operation.
Signup and view all the answers
The team leader should have at least ______ years of experience in environmental study and report preparation.
The team leader should have at least ______ years of experience in environmental study and report preparation.
Signup and view all the answers
Environmental Impact Assessment is a ______ tool for studying and evaluating potential environmental consequences of proposed development projects.
Environmental Impact Assessment is a ______ tool for studying and evaluating potential environmental consequences of proposed development projects.
Signup and view all the answers
To prepare an Environmental Impact Assessment report, the team should have experience in ______ environmental study and report preparation.
To prepare an Environmental Impact Assessment report, the team should have experience in ______ environmental study and report preparation.
Signup and view all the answers
The Environmental Impact Assessment report should be prepared by a team with a ______ in environmental science, environmental management or environmental engineering.
The Environmental Impact Assessment report should be prepared by a team with a ______ in environmental science, environmental management or environmental engineering.
Signup and view all the answers
The Environmental Impact Assessment team should have experience in ______ environmental study and report preparation.
The Environmental Impact Assessment team should have experience in ______ environmental study and report preparation.
Signup and view all the answers
The Environmental Impact Assessment report should be prepared by a team with a ______ in environmental science, environmental management or environmental engineering and at least three years of experience.
The Environmental Impact Assessment report should be prepared by a team with a ______ in environmental science, environmental management or environmental engineering and at least three years of experience.
Signup and view all the answers
The Environmental Impact Assessment team should have a ______ with a bachelor's degree in environmental science, environmental management or environmental engineering.
The Environmental Impact Assessment team should have a ______ with a bachelor's degree in environmental science, environmental management or environmental engineering.
Signup and view all the answers
To prepare an Environmental Impact Assessment report, the team should have a ______ with a bachelor's degree in environmental science, environmental management or environmental engineering and at least three years of experience.
To prepare an Environmental Impact Assessment report, the team should have a ______ with a bachelor's degree in environmental science, environmental management or environmental engineering and at least three years of experience.
Signup and view all the answers
Study Notes
Introduction to Environmental Impact Assessment (EIA)
- EIA is a planning and management tool to study and evaluate potential environmental consequences of proposed development projects.
- It helps to identify beneficial and adverse environmental impacts, examine the significance of environmental implications, and assess whether adverse impacts can be mitigated.
Importance of EIA
- EIA is a systematic evaluation of eco-friendly projects to ensure development projects are environmentally sustainable, socio-culturally acceptable, and economically feasible.
- It reduces adverse environmental impacts, identifies impacts in a timely manner, and assesses the effects of development projects.
Environmental Assessment in Nepal
- EIA was first introduced in Nepal in the 1960s with the formulation of the National Environment Protection Act.
- The Sixth Five Year Plan (1980-1985) mentioned the need for EIA for major infrastructure projects.
- The Seventh Five Year Plan (1985-1990) incorporated a national level policy on environment management.
Role of Environmental Assessment
- Environmental assessment plays a crucial role in collecting information, considering alternatives, integrating environmental concerns with economic and social concerns, and avoiding irreversible effects.
Procedure for EIA
- EIA involves the preparation of a report, which includes a description of the project, its likely environmental impacts, and measures to mitigate adverse impacts.
- The report is prepared by a team of experts with relevant qualifications and experience.
- The report is reviewed by the concerned authorities, and a public hearing is conducted to obtain feedback from stakeholders.
Eligibility Criteria for EIA Report Preparation
- The report can be prepared by a person with a minimum of a bachelor's degree in environmental science, environmental management, or a related field, and at least three years of experience in EIA report preparation.
- Alternatively, a person with a bachelor's degree in a related field, such as natural resource management, forestry, or biology, and at least three years of experience in EIA report preparation can also prepare the report.
Types of EIA Reports
- There are three types of EIA reports: BES (Brief Environmental Study), IEE (Initial Environmental Examination), and EIA (Environmental Impact Assessment).
- BES is a preliminary study to identify potential environmental impacts, while IEE is a more detailed study to assess the environmental implications of a project.
- EIA is a comprehensive study to evaluate the environmental consequences of a project.
When to Conduct EIA
- EIA should be conducted at the stage of project feasibility study, and before the project implementation.
- It is necessary to conduct EIA for projects that have a significant impact on the environment.
Who Conducts EIA?
- EIA can be conducted by a team of experts, including environmental scientists, natural resource managers, foresters, biologists, and engineers.
- The team should have a minimum of three to five members, depending on the type of EIA report being prepared.
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.
Description
Test your knowledge on Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA), including legal provisions and procedures.