What is a key goal of a project regarding technology?
What is a key goal of a project regarding technology?
- To employ the most basic technologies available.
- To avoid using any technology altogether.
- To employ the most appropriate technologies based on specific circumstances. (correct)
- To employ technologies that are universally effective.
Which of the following is NOT an ecosystem service mentioned?
Which of the following is NOT an ecosystem service mentioned?
- Supporting services
- Material services (correct)
- Cultural services
- Regulation services
What might the mitigation hierarchy include?
What might the mitigation hierarchy include?
- Ignoring the effects of the project on the environment.
- Only focusing on economic benefits.
- Implementing solutions without assessment.
- Compensating affected parties for project impacts. (correct)
What does 'disadvantaged or vulnerable' refer to in this context?
What does 'disadvantaged or vulnerable' refer to in this context?
What is included in the costs of a project regarding mitigation?
What is included in the costs of a project regarding mitigation?
What do supporting services refer to?
What do supporting services refer to?
What is the main purpose of the Environmental and Social Standards (ESSs)?
What is the main purpose of the Environmental and Social Standards (ESSs)?
What does ESS1 require Borrowers to do?
What does ESS1 require Borrowers to do?
Which of the following is a cultural service?
Which of the following is a cultural service?
In environmental assessments, what is a significant factor to consider?
In environmental assessments, what is a significant factor to consider?
How should the environmental and social assessment be conducted according to the guidelines?
How should the environmental and social assessment be conducted according to the guidelines?
What is a requirement for the advice and support provided by technical assistance activities?
What is a requirement for the advice and support provided by technical assistance activities?
What is the desired outcome of following the ESSs?
What is the desired outcome of following the ESSs?
What approach does the ESS framework advocate for managing risks?
What approach does the ESS framework advocate for managing risks?
Which type of activities are not subject to the World Bank Environmental and Social Policy?
Which type of activities are not subject to the World Bank Environmental and Social Policy?
What role does environmental and social assessment play in project design?
What role does environmental and social assessment play in project design?
What determines the scope of application of the ESSs when a guarantee is involved?
What determines the scope of application of the ESSs when a guarantee is involved?
Which responsibility is NOT part of the Borrower’s duties according to ESS1?
Which responsibility is NOT part of the Borrower’s duties according to ESS1?
Which statement about activities implemented by the Borrower is true?
Which statement about activities implemented by the Borrower is true?
Under what condition will the Bank support projects?
Under what condition will the Bank support projects?
What informs the environmental and social assessment in projects?
What informs the environmental and social assessment in projects?
What is essential to draft when defining the scope of technical assistance activities?
What is essential to draft when defining the scope of technical assistance activities?
What is not necessary when reporting technical assistance activities?
What is not necessary when reporting technical assistance activities?
What does technical feasibility assess in terms of projects?
What does technical feasibility assess in terms of projects?
What is the primary goal of adopting differentiated measures?
What is the primary goal of adopting differentiated measures?
Which financing type does NOT require adherence to the Environmental and Social Standards (ESS)?
Which financing type does NOT require adherence to the Environmental and Social Standards (ESS)?
How should national environmental and social institutions be used in project implementation?
How should national environmental and social institutions be used in project implementation?
What is one of the aims of promoting improved environmental and social performance?
What is one of the aims of promoting improved environmental and social performance?
Which provisions govern environmental and social standards for Program-for-Results Financing?
Which provisions govern environmental and social standards for Program-for-Results Financing?
What is the focus of the projects supported by Investment Project Financing?
What is the focus of the projects supported by Investment Project Financing?
What is a significant outcome sought from the use of differentiated measures in projects?
What is a significant outcome sought from the use of differentiated measures in projects?
What does ESS1 focus on in relation to technical assistance activities?
What does ESS1 focus on in relation to technical assistance activities?
What is the purpose of the Environmental and Social Commitment Plan (ESCP)?
What is the purpose of the Environmental and Social Commitment Plan (ESCP)?
Which of the following is included in the management tools the Borrower will use?
Which of the following is included in the management tools the Borrower will use?
When will the draft ESCP be disclosed?
When will the draft ESCP be disclosed?
What aspect does the ESCP take into account during its development?
What aspect does the ESCP take into account during its development?
What does the mitigation hierarchy refer to in the context of the ESCP?
What does the mitigation hierarchy refer to in the context of the ESCP?
What is a key documentation aspect of the ESCP in relation to the Bank?
What is a key documentation aspect of the ESCP in relation to the Bank?
Which greenhouse gases and other emissions does the text mention?
Which greenhouse gases and other emissions does the text mention?
What is the significance of stakeholder engagement in the ESCP development?
What is the significance of stakeholder engagement in the ESCP development?
What should the Borrower do if disadvantaged or vulnerable groups are identified during the environmental and social assessment?
What should the Borrower do if disadvantaged or vulnerable groups are identified during the environmental and social assessment?
In which scenario may the Borrower be required to engage independent experts?
In which scenario may the Borrower be required to engage independent experts?
What does the environmental and social assessment need to consider regarding primary suppliers?
What does the environmental and social assessment need to consider regarding primary suppliers?
What is required for projects that involve multiple small subprojects?
What is required for projects that involve multiple small subprojects?
What is the goal of differentiating measures for disadvantaged or vulnerable groups?
What is the goal of differentiating measures for disadvantaged or vulnerable groups?
What is one characteristic of subprojects classified as High Risk?
What is one characteristic of subprojects classified as High Risk?
What do the ESSs require regarding the environmental and social impacts of a project?
What do the ESSs require regarding the environmental and social impacts of a project?
What should be the approach for managing adverse impacts on disadvantaged or vulnerable groups?
What should be the approach for managing adverse impacts on disadvantaged or vulnerable groups?
What does the environmental and social assessment aim to ensure in a project?
What does the environmental and social assessment aim to ensure in a project?
What is the focus of Cumulative Impact Assessment?
What is the focus of Cumulative Impact Assessment?
What is included in the tools used by the Borrower for the environmental and social assessment?
What is included in the tools used by the Borrower for the environmental and social assessment?
What is a potential part of the environmental and social assessment process?
What is a potential part of the environmental and social assessment process?
Which factor is NOT considered in risk assessments during environmental evaluations?
Which factor is NOT considered in risk assessments during environmental evaluations?
What is typically not location-specific in project assessments?
What is typically not location-specific in project assessments?
Which of the following plans may be required for specialized assessment methods?
Which of the following plans may be required for specialized assessment methods?
What should borrowers do as early as possible in project processing?
What should borrowers do as early as possible in project processing?
What information is crucial regarding the area of subprojects?
What information is crucial regarding the area of subprojects?
Which of the following is NOT included in the Environmental and Social Management Framework (ESMF)?
Which of the following is NOT included in the Environmental and Social Management Framework (ESMF)?
What does a Regional ESIA assess?
What does a Regional ESIA assess?
Which document outlines the responsibilities for environmental and social impacts of a project?
Which document outlines the responsibilities for environmental and social impacts of a project?
What does ESS1 require Borrowers to assess and manage?
What does ESS1 require Borrowers to assess and manage?
What is a key component in the economic assessment of environmental and social risks?
What is a key component in the economic assessment of environmental and social risks?
What is the desired outcome of projects following the Environmental and Social Standards (ESSs)?
What is the desired outcome of projects following the Environmental and Social Standards (ESSs)?
What does the environmental and social assessment inform?
What does the environmental and social assessment inform?
What is the purpose of having specific requirements within each ESS?
What is the purpose of having specific requirements within each ESS?
Which aspect is considered during the environmental and social assessment?
Which aspect is considered during the environmental and social assessment?
What is the primary goal of conducting environmental and social assessments?
What is the primary goal of conducting environmental and social assessments?
What should a Borrower do if disadvantage or vulnerable groups are identified during the assessment?
What should a Borrower do if disadvantage or vulnerable groups are identified during the assessment?
What does Sectoral ESIA primarily evaluate?
What does Sectoral ESIA primarily evaluate?
What is a requirement for a Borrower who has partially completed an environmental and social assessment?
What is a requirement for a Borrower who has partially completed an environmental and social assessment?
Which aspect is particularly emphasized in a Sectoral ESIA?
Which aspect is particularly emphasized in a Sectoral ESIA?
How should the environmental and social assessment connect with other projects?
How should the environmental and social assessment connect with other projects?
What type of information might a Sectoral ESIA need in addition to sector-specific data?
What type of information might a Sectoral ESIA need in addition to sector-specific data?
What should be one of the outcomes recommended by a Sectoral ESIA?
What should be one of the outcomes recommended by a Sectoral ESIA?
What is a key aspect of the coordination provided by environmental and social assessments?
What is a key aspect of the coordination provided by environmental and social assessments?
What does the environmental and social assessment help assess regarding co-financers?
What does the environmental and social assessment help assess regarding co-financers?
What does an Environmental and Social Management Plan (ESMP) primarily aim to do?
What does an Environmental and Social Management Plan (ESMP) primarily aim to do?
Which aspect does the ESMP compare when analyzing alternatives?
Which aspect does the ESMP compare when analyzing alternatives?
What is included in the ESMP regarding mitigation measures?
What is included in the ESMP regarding mitigation measures?
Which of the following is NOT a requirement for the Borrower in terms of ESMP implementation?
Which of the following is NOT a requirement for the Borrower in terms of ESMP implementation?
How can an ESMP be presented in relation to the Environmental and Social Commitment Plan (ESCP)?
How can an ESMP be presented in relation to the Environmental and Social Commitment Plan (ESCP)?
What does the 'without project' situation refer to in the analysis of alternatives?
What does the 'without project' situation refer to in the analysis of alternatives?
What is a primary consideration when assessing the feasibility of alternative mitigation measures?
What is a primary consideration when assessing the feasibility of alternative mitigation measures?
Which of these is NOT a component that the Borrower must determine in response to adverse impacts?
Which of these is NOT a component that the Borrower must determine in response to adverse impacts?
What is one requirement for High and Substantial Risk projects regarding the environmental and social assessment?
What is one requirement for High and Substantial Risk projects regarding the environmental and social assessment?
Which of the following is NOT considered an environmental risk as per the guidelines?
Which of the following is NOT considered an environmental risk as per the guidelines?
What must the environmental and social assessment take into account?
What must the environmental and social assessment take into account?
What type of risks does the environmental and social assessment consider in relation to human security?
What type of risks does the environmental and social assessment consider in relation to human security?
Which of the following is included in the assessment of social risks and impacts?
Which of the following is included in the assessment of social risks and impacts?
Regarding the environmental assessment, which of the following must the Borrower ensure?
Regarding the environmental assessment, which of the following must the Borrower ensure?
Which component is considered when assessing environmental risks?
Which component is considered when assessing environmental risks?
Which aspect is NOT mentioned as relevant to the country's capacity in the assessment process?
Which aspect is NOT mentioned as relevant to the country's capacity in the assessment process?
What does the environmental and social assessment aim to achieve?
What does the environmental and social assessment aim to achieve?
In terms of project impacts, what is a significant consideration for marginalized groups?
In terms of project impacts, what is a significant consideration for marginalized groups?
What is required of the Borrower when host country requirements differ from the EHSGs?
What is required of the Borrower when host country requirements differ from the EHSGs?
What must the Borrower provide if they propose alternatives to EHSGs due to specific project circumstances?
What must the Borrower provide if they propose alternatives to EHSGs due to specific project circumstances?
What does the Borrower need to do throughout the project life cycle?
What does the Borrower need to do throughout the project life cycle?
Why might the Borrower propose less stringent levels or measures than those provided in the EHSGs?
Why might the Borrower propose less stringent levels or measures than those provided in the EHSGs?
What is the primary aim of applying the relevant requirements of the EHSGs?
What is the primary aim of applying the relevant requirements of the EHSGs?
What does the Environmental and Social Management Plan (ESMP) aim to achieve?
What does the Environmental and Social Management Plan (ESMP) aim to achieve?
Which of the following statements accurately describes the Environmental and Social Management Framework (ESMF)?
Which of the following statements accurately describes the Environmental and Social Management Framework (ESMF)?
What is the main purpose of the Strategic Environmental and Social Assessment (SESA)?
What is the main purpose of the Strategic Environmental and Social Assessment (SESA)?
What do the measures outlined in the ESMP typically relate to?
What do the measures outlined in the ESMP typically relate to?
At what level is the SESA usually conducted?
At what level is the SESA usually conducted?
What guides the actions needed to implement the measures in the ESMP?
What guides the actions needed to implement the measures in the ESMP?
Regarding the ESMF, what is its particular function?
Regarding the ESMF, what is its particular function?
In terms of implementation, what is critical about the measures in the ESMP?
In terms of implementation, what is critical about the measures in the ESMP?
What is the primary focus of a Sectoral ESIA?
What is the primary focus of a Sectoral ESIA?
When might additional work be required from the Borrower during the environmental and social assessment?
When might additional work be required from the Borrower during the environmental and social assessment?
What does Sectoral ESIA particularly pay attention to?
What does Sectoral ESIA particularly pay attention to?
How does environmental and social assessment enhance project coordination?
How does environmental and social assessment enhance project coordination?
Which of the following is a key task of the Sectoral ESIA?
Which of the following is a key task of the Sectoral ESIA?
What should be included if a Sectoral ESIA requires additional data?
What should be included if a Sectoral ESIA requires additional data?
What is a potential outcome of the environmental and social assessment?
What is a potential outcome of the environmental and social assessment?
What is a characteristic of Sectoral ESIA when considering legal aspects?
What is a characteristic of Sectoral ESIA when considering legal aspects?
What actions will the Borrower take regarding the ESCP?
What actions will the Borrower take regarding the ESCP?
How will the Bank assist the Borrower in managing risks?
How will the Bank assist the Borrower in managing risks?
What will happen to the updated ESCP?
What will happen to the updated ESCP?
What is the purpose of monitoring the project's environmental and social performance?
What is the purpose of monitoring the project's environmental and social performance?
What should the Borrower do if the environmental assessment identifies risks?
What should the Borrower do if the environmental assessment identifies risks?
What must be agreed upon regarding project monitoring?
What must be agreed upon regarding project monitoring?
In what manner should the Borrower handle stakeholder engagement?
In what manner should the Borrower handle stakeholder engagement?
What aspect of the project will the Borrower regularly review?
What aspect of the project will the Borrower regularly review?
What should the environmental and social assessment include regarding the project site?
What should the environmental and social assessment include regarding the project site?
What might the Bank require if it identifies inadequate capacity in the Borrower?
What might the Bank require if it identifies inadequate capacity in the Borrower?
What does the environmental and social assessment aim to evaluate?
What does the environmental and social assessment aim to evaluate?
Which of the following components may the Borrower include to enhance capacity?
Which of the following components may the Borrower include to enhance capacity?
What are the requirements of ESS1 through 10 aimed at?
What are the requirements of ESS1 through 10 aimed at?
What might be necessary if the Borrower’s proposed project impacts local communities?
What might be necessary if the Borrower’s proposed project impacts local communities?
What actions should the Borrower take to ensure compliance with the ESSs?
What actions should the Borrower take to ensure compliance with the ESSs?
Which of the following best describes the role of offsite investments in a project?
Which of the following best describes the role of offsite investments in a project?
What is a key factor when assessing the Borrower’s Environmental and Social Framework?
What is a key factor when assessing the Borrower’s Environmental and Social Framework?
Who should be engaged by the Borrower for stakeholder engagement?
Who should be engaged by the Borrower for stakeholder engagement?
What aspect of the Borrower's project might the Bank assess to prevent negative impacts?
What aspect of the Borrower's project might the Bank assess to prevent negative impacts?
How should the complexity of management tools be determined according to the content?
How should the complexity of management tools be determined according to the content?
What role do implementing agencies play in the project according to the Borrower’s responsibilities?
What role do implementing agencies play in the project according to the Borrower’s responsibilities?
What should the Borrower do regarding gaps identified in the ES Framework?
What should the Borrower do regarding gaps identified in the ES Framework?
What is expected from the Borrower in terms of monitoring activities?
What is expected from the Borrower in terms of monitoring activities?
Which of the following is NOT considered necessary for project compliance under the ESSs?
Which of the following is NOT considered necessary for project compliance under the ESSs?
What are cumulative impacts in the context of project assessment?
What are cumulative impacts in the context of project assessment?
Which of the following best describes the role of the Borrower in relation to cumulative impacts?
Which of the following best describes the role of the Borrower in relation to cumulative impacts?
At what stage will the potential cumulative impacts be determined according to the guidelines?
At what stage will the potential cumulative impacts be determined according to the guidelines?
Which of the following factors is NOT considered when assessing cumulative impacts?
Which of the following factors is NOT considered when assessing cumulative impacts?
Why is it important for cumulative impacts to be recognized during project assessments?
Why is it important for cumulative impacts to be recognized during project assessments?
What is the role of independent experts in high-risk projects?
What is the role of independent experts in high-risk projects?
Which group is specifically protected by implementing differentiated measures?
Which group is specifically protected by implementing differentiated measures?
What should the environmental and social assessment consider regarding associated facilities?
What should the environmental and social assessment consider regarding associated facilities?
For what type of subprojects is an enhanced environmental and social assessment required?
For what type of subprojects is an enhanced environmental and social assessment required?
What is expected from Borrowers when disadvantaged or vulnerable groups are identified?
What is expected from Borrowers when disadvantaged or vulnerable groups are identified?
Which aspect must be included in the environmental and social assessment?
Which aspect must be included in the environmental and social assessment?
What is often a characteristic of projects that are deemed 'High Risk'?
What is often a characteristic of projects that are deemed 'High Risk'?
What should Borrowers implement to manage impacts on disadvantaged groups?
What should Borrowers implement to manage impacts on disadvantaged groups?
What does Regional ESIA particularly focus on when assessing projects?
What does Regional ESIA particularly focus on when assessing projects?
Which of the following is NOT a requirement for conducting environmental and social assessments?
Which of the following is NOT a requirement for conducting environmental and social assessments?
What approach does the Borrower need to adopt to manage environmental and social risks effectively?
What approach does the Borrower need to adopt to manage environmental and social risks effectively?
What is the primary requirement for a common approach to risk management when the Bank is jointly financing a project?
What is the primary requirement for a common approach to risk management when the Bank is jointly financing a project?
What must the Borrower do if conflicts of interest are identified in project assessments?
What must the Borrower do if conflicts of interest are identified in project assessments?
Which aspect is taken into consideration in project selection and design according to the assessment guidelines?
Which aspect is taken into consideration in project selection and design according to the assessment guidelines?
What should be done when significant residual impacts remain after applying mitigation measures?
What should be done when significant residual impacts remain after applying mitigation measures?
What type of assessment may not include site-specific analyses of a specific project?
What type of assessment may not include site-specific analyses of a specific project?
Which step is NOT part of the mitigation hierarchy according to the Borrower's obligations?
Which step is NOT part of the mitigation hierarchy according to the Borrower's obligations?
What does the Borrower need to ensure regarding Associated Facilities?
What does the Borrower need to ensure regarding Associated Facilities?
What is expected of the Borrower in terms of cooperation when multiple funding agencies are involved?
What is expected of the Borrower in terms of cooperation when multiple funding agencies are involved?
What does the Borrower need to do if avoidance of risks and impacts is not possible?
What does the Borrower need to do if avoidance of risks and impacts is not possible?
What is the goal of establishing a mitigation hierarchy in project management?
What is the goal of establishing a mitigation hierarchy in project management?
What is the primary responsibility of Borrowers according to ESS1?
What is the primary responsibility of Borrowers according to ESS1?
How should the environmental and social assessment be proportionate to the project?
How should the environmental and social assessment be proportionate to the project?
What are the key components outlined in the desired outcomes of each ESS?
What are the key components outlined in the desired outcomes of each ESS?
What is one of the primary purposes of conducting environmental and social assessments?
What is one of the primary purposes of conducting environmental and social assessments?
What type of approach does ESS1 advocate for managing project risks?
What type of approach does ESS1 advocate for managing project risks?
What informs the design of the project as part of the environmental and social assessment process?
What informs the design of the project as part of the environmental and social assessment process?
What is a key aspect that Borrowers must consider during environmental and social assessments?
What is a key aspect that Borrowers must consider during environmental and social assessments?
What is a critical aspect of ensuring effective environmental and social performance in projects?
What is a critical aspect of ensuring effective environmental and social performance in projects?
What is a primary function of supporting services in ecosystems?
What is a primary function of supporting services in ecosystems?
What is an accurate description of cultural services?
What is an accurate description of cultural services?
Which of the following best captures the meaning of residual impacts in projects?
Which of the following best captures the meaning of residual impacts in projects?
How can the Borrower address compensating for significant residual impacts?
How can the Borrower address compensating for significant residual impacts?
What does the term 'disadvantaged or vulnerable' refer to in this context?
What does the term 'disadvantaged or vulnerable' refer to in this context?
What should be done to assist affected parties in a project setting?
What should be done to assist affected parties in a project setting?
Which is NOT a component of the mitigation hierarchy?
Which is NOT a component of the mitigation hierarchy?
Which process is essential in assessing environmental and social impacts?
Which process is essential in assessing environmental and social impacts?
What does the mitigation hierarchy approach primarily seek to do?
What does the mitigation hierarchy approach primarily seek to do?
In the context of project funding, what must Borrowers do when working with other funding agencies?
In the context of project funding, what must Borrowers do when working with other funding agencies?
What is a key requirement if significant residual impacts remain after other mitigation measures?
What is a key requirement if significant residual impacts remain after other mitigation measures?
What role do Associated Facilities play in relation to ESS1?
What role do Associated Facilities play in relation to ESS1?
What is the primary objective of adopting a mitigation hierarchy approach in projects?
What is the primary objective of adopting a mitigation hierarchy approach in projects?
Which of the following is NOT a step in the mitigation hierarchy?
Which of the following is NOT a step in the mitigation hierarchy?
What is a characteristic of a direct impact in a project?
What is a characteristic of a direct impact in a project?
Which aspect is important in identifying impacts in the Borrower's ES Framework?
Which aspect is important in identifying impacts in the Borrower's ES Framework?
What condition must be met for a common approach to be deemed acceptable in project financing?
What condition must be met for a common approach to be deemed acceptable in project financing?
What distinguishes an indirect impact from a direct impact?
What distinguishes an indirect impact from a direct impact?
When can the Borrower be required to compensate for residual impacts?
When can the Borrower be required to compensate for residual impacts?
What should be assessed regarding the feasibility of mitigation measures?
What should be assessed regarding the feasibility of mitigation measures?
What will a project likely require if it has sectoral or regional impacts?
What will a project likely require if it has sectoral or regional impacts?
Which term describes impacts that are caused by the project but occur later or at a distance?
Which term describes impacts that are caused by the project but occur later or at a distance?
Which of the following is NOT a factor in identifying mitigation measures?
Which of the following is NOT a factor in identifying mitigation measures?
What is necessary for engagement with stakeholders and affected parties?
What is necessary for engagement with stakeholders and affected parties?
What role does the Borrower's ES Framework play in a project?
What role does the Borrower's ES Framework play in a project?
Which action ensures that adverse impacts do not disproportionately affect vulnerable groups?
Which action ensures that adverse impacts do not disproportionately affect vulnerable groups?
What may be required if there are inconsistencies within the Borrower’s ES Framework?
What may be required if there are inconsistencies within the Borrower’s ES Framework?
What is a key component of assessing environmental and social impacts?
What is a key component of assessing environmental and social impacts?
What does the Borrower's ES Framework commonly include for certain projects?
What does the Borrower's ES Framework commonly include for certain projects?
What should be documented regarding the proposed mitigation measures?
What should be documented regarding the proposed mitigation measures?
Which element is crucial when assessing country-specific laws and regulations?
Which element is crucial when assessing country-specific laws and regulations?
What is a required assessment for the acceptability of residual negative impacts?
What is a required assessment for the acceptability of residual negative impacts?
What must the Borrower implement for disadvantaged or vulnerable groups during a project?
What must the Borrower implement for disadvantaged or vulnerable groups during a project?
What is required for subprojects classified as High Risk?
What is required for subprojects classified as High Risk?
Which aspect is considered during environmental and social assessments of projects?
Which aspect is considered during environmental and social assessments of projects?
What does the environmental and social assessment prioritize if it identifies vulnerable groups?
What does the environmental and social assessment prioritize if it identifies vulnerable groups?
How should the Borrower approach environmental and social assessments for multiple small subprojects?
How should the Borrower approach environmental and social assessments for multiple small subprojects?
What may be required for projects with serious multidimensional environmental or social risks?
What may be required for projects with serious multidimensional environmental or social risks?
What must the environmental and social assessment for the project include?
What must the environmental and social assessment for the project include?
What should the Borrower do if the environmental and social assessment identifies specific individuals or groups as vulnerable?
What should the Borrower do if the environmental and social assessment identifies specific individuals or groups as vulnerable?
What is the primary purpose of the Environmental and Social Commitment Plan (ESCP)?
What is the primary purpose of the Environmental and Social Commitment Plan (ESCP)?
Which of the following elements will the ESCP include?
Which of the following elements will the ESCP include?
What influences the development of the ESCP?
What influences the development of the ESCP?
What hierarchy does the ESCP incorporate when applying management tools?
What hierarchy does the ESCP incorporate when applying management tools?
What is a key factor in the ESCP's compliance with applicable laws and regulations?
What is a key factor in the ESCP's compliance with applicable laws and regulations?
What does the ESCP require to be agreed upon with the Bank?
What does the ESCP require to be agreed upon with the Bank?
What additional requirement is essential throughout the project's life cycle according to the ESCP?
What additional requirement is essential throughout the project's life cycle according to the ESCP?
What should be included in the project to strengthen the Borrower’s capacity if deemed inadequate?
What should be included in the project to strengthen the Borrower’s capacity if deemed inadequate?
Which element is not mentioned as part of the project's assessment variations?
Which element is not mentioned as part of the project's assessment variations?
What is an essential component that must be included in the environmental and social assessment?
What is an essential component that must be included in the environmental and social assessment?
What type of components may be included to enhance capacity in a project?
What type of components may be included to enhance capacity in a project?
What does the environmental and social assessment aim to define in the context of a project?
What does the environmental and social assessment aim to define in the context of a project?
Which aspect is not typically addressed through the environmental and social assessment for projects?
Which aspect is not typically addressed through the environmental and social assessment for projects?
Which document is important for indicating the need for plans to meet the Environmental and Social Standards?
Which document is important for indicating the need for plans to meet the Environmental and Social Standards?
What role does geographic context play in the project assessment?
What role does geographic context play in the project assessment?
Which activities are excluded from the World Bank Environmental and Social Policy for Investment Project Financing?
Which activities are excluded from the World Bank Environmental and Social Policy for Investment Project Financing?
What is a requirement for the projects supported by the Bank?
What is a requirement for the projects supported by the Bank?
How does the scope of application of the Environmental and Social Standards (ESSs) change when a guarantee is involved?
How does the scope of application of the Environmental and Social Standards (ESSs) change when a guarantee is involved?
What should the terms of reference for technical assistance activities ensure?
What should the terms of reference for technical assistance activities ensure?
Which aspect is NOT covered by the Bank’s Environmental and Social Policy regarding technical assistance?
Which aspect is NOT covered by the Bank’s Environmental and Social Policy regarding technical assistance?
What is considered when drafting the environmental and social assessment for projects?
What is considered when drafting the environmental and social assessment for projects?
What is the significance of the provisions outlined in the Environmental and Social Policy for Investment Project Financing?
What is the significance of the provisions outlined in the Environmental and Social Policy for Investment Project Financing?
What determines technical feasibility in project activities?
What determines technical feasibility in project activities?
Which of the following best describes the mitigation hierarchy approach?
Which of the following best describes the mitigation hierarchy approach?
What is required from the Borrower when significant residual impacts remain?
What is required from the Borrower when significant residual impacts remain?
What is a primary responsibility of the Borrower when cooperating with multilateral funding agencies?
What is a primary responsibility of the Borrower when cooperating with multilateral funding agencies?
What does the term 'technically feasible' imply in the context of offsetting residual impacts?
What does the term 'technically feasible' imply in the context of offsetting residual impacts?
What is the acceptable condition for the common approach to risk assessment agreed upon by the Borrower and funding agencies?
What is the acceptable condition for the common approach to risk assessment agreed upon by the Borrower and funding agencies?
In the context of environmental and social risk management, which step comes first according to the mitigation hierarchy?
In the context of environmental and social risk management, which step comes first according to the mitigation hierarchy?
What is the role of Associated Facilities in relation to ESS1?
What is the role of Associated Facilities in relation to ESS1?
What should be the approach if avoidance of risks and impacts is not feasible?
What should be the approach if avoidance of risks and impacts is not feasible?
What documentation is the Borrower required to provide to the Bank regarding environmental and social risks?
What documentation is the Borrower required to provide to the Bank regarding environmental and social risks?
How often must the Borrower provide monitoring reports to the Bank?
How often must the Borrower provide monitoring reports to the Bank?
What should the Borrower do if there are significant changes to the project?
What should the Borrower do if there are significant changes to the project?
Which aspect is NOT a part of the monitoring process according to the guidelines?
Which aspect is NOT a part of the monitoring process according to the guidelines?
What is the goal of establishing operational controls during monitoring?
What is the goal of establishing operational controls during monitoring?
Which of the following best describes the nature of reports the Borrower produces?
Which of the following best describes the nature of reports the Borrower produces?
What happens if monitoring results indicate significant adverse impacts?
What happens if monitoring results indicate significant adverse impacts?
What role does stakeholder feedback play in the monitoring process?
What role does stakeholder feedback play in the monitoring process?
What does an Environmental and Social Management Plan (ESMP) primarily aim to achieve?
What does an Environmental and Social Management Plan (ESMP) primarily aim to achieve?
Which activity is NOT included in the ESMP's requirements for addressing adverse impacts?
Which activity is NOT included in the ESMP's requirements for addressing adverse impacts?
In analyzing alternatives for a project, what aspect is considered alongside potential environmental and social impacts?
In analyzing alternatives for a project, what aspect is considered alongside potential environmental and social impacts?
What must the Borrower do regarding the institutional and training requirements for mitigation?
What must the Borrower do regarding the institutional and training requirements for mitigation?
Which scenario is included in the analysis of alternatives for a proposed project?
Which scenario is included in the analysis of alternatives for a proposed project?
What is required concerning the monitoring measures in an ESMP?
What is required concerning the monitoring measures in an ESMP?
How might an ESMP be prepared based on its format?
How might an ESMP be prepared based on its format?
Which component of the ESMP involves assessing local conditions for suitability?
Which component of the ESMP involves assessing local conditions for suitability?
What must the Borrower do regarding activities that may cause material adverse environmental or social risks?
What must the Borrower do regarding activities that may cause material adverse environmental or social risks?
When can the Borrower agree to rely on the requirements of other funding agencies?
When can the Borrower agree to rely on the requirements of other funding agencies?
What is required if the project includes existing facilities that do not meet ESSs?
What is required if the project includes existing facilities that do not meet ESSs?
What should occur before the Borrower carries out activities related to the project?
What should occur before the Borrower carries out activities related to the project?
How can the Borrower apply requirements from other agencies funding the Associated Facilities?
How can the Borrower apply requirements from other agencies funding the Associated Facilities?
What is the minimum expectation for environmental and social risk management according to the ESCP?
What is the minimum expectation for environmental and social risk management according to the ESCP?
What does the inclusion of existing facilities in a new project require from the Borrower?
What does the inclusion of existing facilities in a new project require from the Borrower?
What role does the Bank play regarding projects with existing non-compliant activities?
What role does the Bank play regarding projects with existing non-compliant activities?
What is the purpose of the environmental and social assessment conducted by the Borrower?
What is the purpose of the environmental and social assessment conducted by the Borrower?
What action is the Borrower expected to take if gaps are identified in their ES Framework?
What action is the Borrower expected to take if gaps are identified in their ES Framework?
In assessing the environmental and social risks, what types of impacts should be considered?
In assessing the environmental and social risks, what types of impacts should be considered?
What is the main requirement when the Borrower proposes to use part of their ES Framework?
What is the main requirement when the Borrower proposes to use part of their ES Framework?
What kind of assessment is the Borrower required to conduct?
What kind of assessment is the Borrower required to conduct?
What is a key aspect of the environmental and social assessment regarding cumulative impacts?
What is a key aspect of the environmental and social assessment regarding cumulative impacts?
If the Borrower decides to use their ES Framework, what is the role of the Bank?
If the Borrower decides to use their ES Framework, what is the role of the Bank?
How should the environmental and social assessment be proportional?
How should the environmental and social assessment be proportional?
What is one of the primary objectives of the Borrower in relation to the project?
What is one of the primary objectives of the Borrower in relation to the project?
Which step comes first in the mitigation hierarchy approach?
Which step comes first in the mitigation hierarchy approach?
In what circumstances should the Borrower apply a common approach with other agencies?
In what circumstances should the Borrower apply a common approach with other agencies?
What should happen if significant residual impacts remain after risk management?
What should happen if significant residual impacts remain after risk management?
What is crucial for achieving objectives materially consistent with the ESSs?
What is crucial for achieving objectives materially consistent with the ESSs?
What does ESS1 require of all Associated Facilities?
What does ESS1 require of all Associated Facilities?
What does the Borrower need to do when engaging with vulnerable groups identified during the assessment?
What does the Borrower need to do when engaging with vulnerable groups identified during the assessment?
When is it deemed acceptable to employ a common approach regarding risk management?
When is it deemed acceptable to employ a common approach regarding risk management?
What is the primary purpose of a Cultural Heritage Management Plan within a project?
What is the primary purpose of a Cultural Heritage Management Plan within a project?
How are direct impacts characterized in relation to a project?
How are direct impacts characterized in relation to a project?
Which type of assessment is required for projects with potential sectoral or regional impacts?
Which type of assessment is required for projects with potential sectoral or regional impacts?
What defines an indirect impact in relation to a project?
What defines an indirect impact in relation to a project?
Which aspect of the Borrower’s Environmental and Social Framework may vary from project to project?
Which aspect of the Borrower’s Environmental and Social Framework may vary from project to project?
What is a possible consequence of inconsistencies within the Borrower’s Environment and Social Framework?
What is a possible consequence of inconsistencies within the Borrower’s Environment and Social Framework?
What must be taken into consideration during preconstruction activities of a project?
What must be taken into consideration during preconstruction activities of a project?
What is typically the focus when assessing the role and authority of different institutions in a project?
What is typically the focus when assessing the role and authority of different institutions in a project?
What does an ESMP primarily aim to do?
What does an ESMP primarily aim to do?
Which feature is an important aspect of the analysis of alternatives in an ESMP?
Which feature is an important aspect of the analysis of alternatives in an ESMP?
What must the Borrower identify according to the ESMP requirements?
What must the Borrower identify according to the ESMP requirements?
What aspect does the ESMP assess regarding alternative mitigation measures?
What aspect does the ESMP assess regarding alternative mitigation measures?
How can the content of an ESMP be presented according to its guidelines?
How can the content of an ESMP be presented according to its guidelines?
Which of the following is NOT addressed in the institutional measures of an ESMP?
Which of the following is NOT addressed in the institutional measures of an ESMP?
What does the term 'institutional requirements' in an ESMP refer to?
What does the term 'institutional requirements' in an ESMP refer to?
What is assessed regarding the suitability of mitigation measures in an ESMP?
What is assessed regarding the suitability of mitigation measures in an ESMP?
What action must the Borrower take if there are significant changes in the Borrower's ES Framework that could affect the project?
What action must the Borrower take if there are significant changes in the Borrower's ES Framework that could affect the project?
Which method is NOT typically used by the Borrower to assess potential environmental and social risks?
Which method is NOT typically used by the Borrower to assess potential environmental and social risks?
What is required if the Borrower's ES Framework is changed in a manner inconsistent with specific requirements?
What is required if the Borrower's ES Framework is changed in a manner inconsistent with specific requirements?
Which of the following tools is included in the methods for identifying and assessing environmental and social risks?
Which of the following tools is included in the methods for identifying and assessing environmental and social risks?
What does the environmental and social management framework (ESMF) relate to?
What does the environmental and social management framework (ESMF) relate to?
What is one of the types of assessments the Borrower might conduct to evaluate project impacts?
What is one of the types of assessments the Borrower might conduct to evaluate project impacts?
What is the primary focus of the environmental and social impact assessment (ESIA) conducted by the Borrower?
What is the primary focus of the environmental and social impact assessment (ESIA) conducted by the Borrower?
Which of the following is NOT a potential component of the assessment methods listed for the Borrower?
Which of the following is NOT a potential component of the assessment methods listed for the Borrower?
What is required of the Borrower when disadvantaged or vulnerable individuals are identified during the environmental and social assessment?
What is required of the Borrower when disadvantaged or vulnerable individuals are identified during the environmental and social assessment?
For projects identified as High Risk, what may the Borrower be required to do?
For projects identified as High Risk, what may the Borrower be required to do?
What must the environmental and social assessment consider regarding primary suppliers?
What must the environmental and social assessment consider regarding primary suppliers?
How should the Borrower manage the environmental and social assessment of multiple small subprojects?
How should the Borrower manage the environmental and social assessment of multiple small subprojects?
What approach should be taken to ensure adverse impacts do not disproportionately affect the disadvantaged or vulnerable?
What approach should be taken to ensure adverse impacts do not disproportionately affect the disadvantaged or vulnerable?
What characterizes subprojects that are classified as High Risk?
What characterizes subprojects that are classified as High Risk?
What is the primary responsibility of the Borrower when addressing risks associated with associated facilities?
What is the primary responsibility of the Borrower when addressing risks associated with associated facilities?
What is a significant aspect of ensuring the success of differentiated measures for disadvantaged groups?
What is a significant aspect of ensuring the success of differentiated measures for disadvantaged groups?
What role do national environmental and social institutions play in project implementation?
What role do national environmental and social institutions play in project implementation?
What is one requirement when providing technical assistance supported by the Bank?
What is one requirement when providing technical assistance supported by the Bank?
Which of the following projects does not fall under the requirements for environmental and social assessments?
Which of the following projects does not fall under the requirements for environmental and social assessments?
What should the differentiated measures primarily aim to achieve?
What should the differentiated measures primarily aim to achieve?
What outcome is sought by promoting improved environmental and social performance?
What outcome is sought by promoting improved environmental and social performance?
What is required when assessing the environmental and social impacts of a project?
What is required when assessing the environmental and social impacts of a project?
Which provision outlines the requirements for environmental and social standards for Program-for-Results Financing?
Which provision outlines the requirements for environmental and social standards for Program-for-Results Financing?
What characterizes a project supported by Investment Project Financing?
What characterizes a project supported by Investment Project Financing?
What is meant by cumulative impacts in the context of project assessment?
What is meant by cumulative impacts in the context of project assessment?
At what stage should potential cumulative impacts be identified according to the project framework?
At what stage should potential cumulative impacts be identified according to the project framework?
How should the Borrower's Environmental and Social Framework be improved according to the assessment process?
How should the Borrower's Environmental and Social Framework be improved according to the assessment process?
What role do recent studies and assessments play in evaluating cumulative impacts of a project?
What role do recent studies and assessments play in evaluating cumulative impacts of a project?
Why is the consideration of cumulative impacts important during the environmental and social assessment process?
Why is the consideration of cumulative impacts important during the environmental and social assessment process?
What is the first step in the mitigation hierarchy when addressing environmental and social impacts?
What is the first step in the mitigation hierarchy when addressing environmental and social impacts?
Which of the following correctly describes 'provisioning services'?
Which of the following correctly describes 'provisioning services'?
What is the next action after minimizing or reducing risks and impacts in the mitigation hierarchy?
What is the next action after minimizing or reducing risks and impacts in the mitigation hierarchy?
Which aspect is essential for Good International Industry Practice (GIIP)?
Which aspect is essential for Good International Industry Practice (GIIP)?
What is required when significant residual impacts remain after implementing the mitigation hierarchy?
What is required when significant residual impacts remain after implementing the mitigation hierarchy?
How can ecosystem services be classified?
How can ecosystem services be classified?
Which of the following best defines 'regulating services'?
Which of the following best defines 'regulating services'?
What is one of the main purposes of the environmental and social assessment?
What is one of the main purposes of the environmental and social assessment?
What is the primary requirement for the Borrower during the environmental and social assessment process?
What is the primary requirement for the Borrower during the environmental and social assessment process?
Which of the following best describes 'Associated Facilities'?
Which of the following best describes 'Associated Facilities'?
What does the Borrower need to develop as part of their obligations?
What does the Borrower need to develop as part of their obligations?
In what manner should the Borrower conduct monitoring and reporting?
In what manner should the Borrower conduct monitoring and reporting?
What is an essential action the Borrower must take regarding stakeholder engagement?
What is an essential action the Borrower must take regarding stakeholder engagement?
Which statement about the legal agreement is true according to the requirements outlined?
Which statement about the legal agreement is true according to the requirements outlined?
What are the characteristics of monitoring within the environmental and social performance context?
What are the characteristics of monitoring within the environmental and social performance context?
What is required when Associated Facilities are being assessed?
What is required when Associated Facilities are being assessed?
What should the Borrower do if significant changes occur in their Environmental and Social (ES) Framework?
What should the Borrower do if significant changes occur in their Environmental and Social (ES) Framework?
Which method is NOT appropriate for assessing the potential environmental and social risks of a project?
Which method is NOT appropriate for assessing the potential environmental and social risks of a project?
In what situation would the Borrower need to conduct additional assessments?
In what situation would the Borrower need to conduct additional assessments?
What is the role of stakeholder engagement in the Borrower's assessment process?
What is the role of stakeholder engagement in the Borrower's assessment process?
What combination of tools might the Borrower utilize for environmental and social assessment?
What combination of tools might the Borrower utilize for environmental and social assessment?
If the Borrower proposes changes to the ESCP, what is the required process?
If the Borrower proposes changes to the ESCP, what is the required process?
What factors should the methods and tools used in assessment reflect?
What factors should the methods and tools used in assessment reflect?
Which of the following assessments is NOT typically included in the Borrower's assessments?
Which of the following assessments is NOT typically included in the Borrower's assessments?
What should the Borrower do if the risk rating of a subproject increases?
What should the Borrower do if the risk rating of a subproject increases?
Which aspect is essential for managing substantial, moderate, and low-risk subprojects?
Which aspect is essential for managing substantial, moderate, and low-risk subprojects?
What is a focus of the environmental and social assessment regarding project-related impacts?
What is a focus of the environmental and social assessment regarding project-related impacts?
Why is careful assessment needed in projects concerning land titling?
Why is careful assessment needed in projects concerning land titling?
What do ESS2 and ESS6 emphasize in terms of managing supply chain risks?
What do ESS2 and ESS6 emphasize in terms of managing supply chain risks?
In the context of ESSs, which issue is associated with climate change risks?
In the context of ESSs, which issue is associated with climate change risks?
What are the potential consequences of inadequate project assessment related to land rights?
What are the potential consequences of inadequate project assessment related to land rights?
How should the environmental and social assessment approach significant impacts?
How should the environmental and social assessment approach significant impacts?
What additional work might be required of the Borrower after the initial environmental and social assessment?
What additional work might be required of the Borrower after the initial environmental and social assessment?
Which aspect does Sectoral ESIA particularly emphasize?
Which aspect does Sectoral ESIA particularly emphasize?
How should environmental and social assessments be linked according to best practices?
How should environmental and social assessments be linked according to best practices?
Which of the following is NOT a legal aspect reviewed in the environmental and social assessment?
Which of the following is NOT a legal aspect reviewed in the environmental and social assessment?
What is the significance of the institutional capacity in the environmental and social management process?
What is the significance of the institutional capacity in the environmental and social management process?
What can be a consequence of not thoroughly assessing environmental and social impacts at the sectoral level?
What can be a consequence of not thoroughly assessing environmental and social impacts at the sectoral level?
What is the overall goal of an environmental and social assessment?
What is the overall goal of an environmental and social assessment?
What is a primary focus of Regional Environmental and Social Impact Assessments (ESIA)?
What is a primary focus of Regional Environmental and Social Impact Assessments (ESIA)?
Which aspect is crucial for ensuring integrity in environmental and social assessments?
Which aspect is crucial for ensuring integrity in environmental and social assessments?
What must the Borrower ensure when hiring consultants for environmental and social assessments?
What must the Borrower ensure when hiring consultants for environmental and social assessments?
In what scenario may site-specific analyses be excluded from the ESIA?
In what scenario may site-specific analyses be excluded from the ESIA?
What are the implications of the environmental and social assessment not being conducted by the same consultants who prepare engineering designs?
What are the implications of the environmental and social assessment not being conducted by the same consultants who prepare engineering designs?
What aspect is crucial for identifying mitigation measures in relation to socio-environmental impacts?
What aspect is crucial for identifying mitigation measures in relation to socio-environmental impacts?
What is one of the identified requirements for mitigating adverse impacts on vulnerable groups?
What is one of the identified requirements for mitigating adverse impacts on vulnerable groups?
Which measure should be included in the assessment of mitigation strategies?
Which measure should be included in the assessment of mitigation strategies?
What is a significant concern when determining the acceptability of residual negative impacts?
What is a significant concern when determining the acceptability of residual negative impacts?
Which type of assessments are critical for evaluating the contextual implications on sustainability?
Which type of assessments are critical for evaluating the contextual implications on sustainability?
What is essential for effective stakeholder engagement in impact assessments?
What is essential for effective stakeholder engagement in impact assessments?
What should the institutional capabilities focus on in regard to implementation?
What should the institutional capabilities focus on in regard to implementation?
What factor must be assessed to understand the capital and recurrent costs of proposed measures?
What factor must be assessed to understand the capital and recurrent costs of proposed measures?
What criteria must facilities or activities meet to be classified as Associated Facilities?
What criteria must facilities or activities meet to be classified as Associated Facilities?
Which factors might the Borrower include to demonstrate they cannot control Associated Facilities?
Which factors might the Borrower include to demonstrate they cannot control Associated Facilities?
What is one responsibility of the Bank when assessing a project?
What is one responsibility of the Bank when assessing a project?
How does the Bank decide to use the Borrower's Environmental and Social Framework?
How does the Bank decide to use the Borrower's Environmental and Social Framework?
What aspect is crucial for Borrowers to address when implementing a project?
What aspect is crucial for Borrowers to address when implementing a project?
What is necessary for the Borrower to achieve concerning environmental and social harm?
What is necessary for the Borrower to achieve concerning environmental and social harm?
Which organization is NOT mentioned as part of the Borrower's environmental and social framework?
Which organization is NOT mentioned as part of the Borrower's environmental and social framework?
What is required from the Borrower if a subproject's risk rating increases?
What is required from the Borrower if a subproject's risk rating increases?
What is a key consideration for the Bank in project assessment?
What is a key consideration for the Bank in project assessment?
Which of the following is considered a significant concern during environmental assessments?
Which of the following is considered a significant concern during environmental assessments?
What does the assessment process aim to prevent regarding legitimate rights?
What does the assessment process aim to prevent regarding legitimate rights?
What aspect should projects consider to avoid impacting threatened species?
What aspect should projects consider to avoid impacting threatened species?
What is the significance of assessing climate change issues within the environmental and social assessment?
What is the significance of assessing climate change issues within the environmental and social assessment?
What are the implications of secure tenure in project assessments?
What are the implications of secure tenure in project assessments?
How does the Borrower address potential environmental risks according to the standards?
How does the Borrower address potential environmental risks according to the standards?
What type of risks does the environmental and social assessment consider?
What type of risks does the environmental and social assessment consider?
What factors influence the scope and depth of an environmental and social assessment?
What factors influence the scope and depth of an environmental and social assessment?
Which of the following statements accurately describes hazard or risk assessment?
Which of the following statements accurately describes hazard or risk assessment?
What consultation requirement does the Borrower have regarding the environmental and social assessment process?
What consultation requirement does the Borrower have regarding the environmental and social assessment process?
When is a hazard or risk assessment required for a project?
When is a hazard or risk assessment required for a project?
What does the environmental and social assessment process typically include?
What does the environmental and social assessment process typically include?
Why might some projects require only an environmental or social audit?
Why might some projects require only an environmental or social audit?
What must the Borrower take into account when conducting the environmental and social assessment?
What must the Borrower take into account when conducting the environmental and social assessment?
What is the Banks' requirement regarding hazardous materials assessment?
What is the Banks' requirement regarding hazardous materials assessment?
What is a purpose of including components in a project according to environmental and social assessment guidelines?
What is a purpose of including components in a project according to environmental and social assessment guidelines?
What should the project description include to comply with assessment requirements?
What should the project description include to comply with assessment requirements?
What may the Bank require if the Borrower's technical capacity is found inadequate?
What may the Bank require if the Borrower's technical capacity is found inadequate?
What must be indicated through an environmental and social assessment of a project?
What must be indicated through an environmental and social assessment of a project?
What kind of impacts should the project consider according to the environmental and social management guidelines?
What kind of impacts should the project consider according to the environmental and social management guidelines?
What type of planning is necessary for projects that may have offsite environmental effects?
What type of planning is necessary for projects that may have offsite environmental effects?
What is a key consideration for the environmental and social assessment in project management?
What is a key consideration for the environmental and social assessment in project management?
What should be included in the project's management tools regarding environmental and social performance?
What should be included in the project's management tools regarding environmental and social performance?
Flashcards
What is the borrower's responsibility in ESS1?
What is the borrower's responsibility in ESS1?
The responsibility of the borrower to identify, manage, and monitor environmental and social risks and impacts throughout a project's lifecycle.
What is the purpose of the ESSs?
What is the purpose of the ESSs?
The Environmental and Social Standards (ESSs) are designed to help borrowers manage project risks and enhance their environmental and social performance.
How do the ESSs work?
How do the ESSs work?
The ESSs use a 'risk and outcomes based approach'. This means that the desired outcomes for a project are defined first, and then specific requirements are set to help borrowers achieve these outcomes.
How are the ESSs proportionate?
How are the ESSs proportionate?
Signup and view all the flashcards
What is an ESA?
What is an ESA?
Signup and view all the flashcards
How is the ESA proportionate?
How is the ESA proportionate?
Signup and view all the flashcards
What are the benefits of the ESA?
What are the benefits of the ESA?
Signup and view all the flashcards
How does the ESA support decision-making?
How does the ESA support decision-making?
Signup and view all the flashcards
Bank's Articles of Agreement
Bank's Articles of Agreement
Signup and view all the flashcards
Technical Feasibility
Technical Feasibility
Signup and view all the flashcards
Post-Project Activities
Post-Project Activities
Signup and view all the flashcards
ESSs Scope Under Guarantee
ESSs Scope Under Guarantee
Signup and view all the flashcards
Technical Assistance Documents
Technical Assistance Documents
Signup and view all the flashcards
Environmental and Social Policy
Environmental and Social Policy
Signup and view all the flashcards
Project Alignment with ESSs
Project Alignment with ESSs
Signup and view all the flashcards
Purpose of the ESSs
Purpose of the ESSs
Signup and view all the flashcards
What are OP/BP 10.00 Investment Project Financing Projects?
What are OP/BP 10.00 Investment Project Financing Projects?
Signup and view all the flashcards
What are the World Bank's Environmental and Social Policies for Investment Project Financing?
What are the World Bank's Environmental and Social Policies for Investment Project Financing?
Signup and view all the flashcards
What are OP/BP 8.60 Development Policy Lending Projects?
What are OP/BP 8.60 Development Policy Lending Projects?
Signup and view all the flashcards
What are OP/BP 9.00 Program-for-Results Financing Projects?
What are OP/BP 9.00 Program-for-Results Financing Projects?
Signup and view all the flashcards
What should projects funded by Investment Project Financing (IPF) do?
What should projects funded by Investment Project Financing (IPF) do?
Signup and view all the flashcards
What is the goal of OP/BP 10.00 Investment Project Financing Projects?
What is the goal of OP/BP 10.00 Investment Project Financing Projects?
Signup and view all the flashcards
What about technical assistance projects funded by Investment Project Financing (IPF)?
What about technical assistance projects funded by Investment Project Financing (IPF)?
Signup and view all the flashcards
How do you ensure sustainability in technical assistance projects funded by Investment Project Financing?
How do you ensure sustainability in technical assistance projects funded by Investment Project Financing?
Signup and view all the flashcards
Ecosystem services
Ecosystem services
Signup and view all the flashcards
Mitigation Hierarchy
Mitigation Hierarchy
Signup and view all the flashcards
Compensation and/or Offset
Compensation and/or Offset
Signup and view all the flashcards
Residual Impacts
Residual Impacts
Signup and view all the flashcards
Environmental and Social Assessment (ESA)
Environmental and Social Assessment (ESA)
Signup and view all the flashcards
Disadvantaged or vulnerable groups
Disadvantaged or vulnerable groups
Signup and view all the flashcards
Incorporating Compensation and/or Offset Costs
Incorporating Compensation and/or Offset Costs
Signup and view all the flashcards
How does the borrower address disadvantaged groups?
How does the borrower address disadvantaged groups?
Signup and view all the flashcards
Do sub-projects need environmental assessments?
Do sub-projects need environmental assessments?
Signup and view all the flashcards
When are independent experts needed?
When are independent experts needed?
Signup and view all the flashcards
What about the suppliers' environmental impact?
What about the suppliers' environmental impact?
Signup and view all the flashcards
How does the environmental assessment consider associated facilities?
How does the environmental assessment consider associated facilities?
Signup and view all the flashcards
How is the sub-project assessment proportionate?
How is the sub-project assessment proportionate?
Signup and view all the flashcards
Is the project technically feasible?
Is the project technically feasible?
Signup and view all the flashcards
How does ESA consider vulnerable groups?
How does ESA consider vulnerable groups?
Signup and view all the flashcards
Who develops the ESCP?
Who develops the ESCP?
Signup and view all the flashcards
Is the ESCP legally binding?
Is the ESCP legally binding?
Signup and view all the flashcards
When is the ESCP disclosed?
When is the ESCP disclosed?
Signup and view all the flashcards
What information is used for the ESCP?
What information is used for the ESCP?
Signup and view all the flashcards
What tools are used for the ESCP?
What tools are used for the ESCP?
Signup and view all the flashcards
How long does the ESCP apply?
How long does the ESCP apply?
Signup and view all the flashcards
What is the mitigation hierarchy in the ESCP?
What is the mitigation hierarchy in the ESCP?
Signup and view all the flashcards
Cumulative Impact Assessment
Cumulative Impact Assessment
Signup and view all the flashcards
Environmental and Social Commitment Plan (ESCP)
Environmental and Social Commitment Plan (ESCP)
Signup and view all the flashcards
Regional ESIA
Regional ESIA
Signup and view all the flashcards
Vulnerability Assessment
Vulnerability Assessment
Signup and view all the flashcards
How is the ESCP used?
How is the ESCP used?
Signup and view all the flashcards
Scope of the ESA
Scope of the ESA
Signup and view all the flashcards
ESA Standards and Practices
ESA Standards and Practices
Signup and view all the flashcards
Key Areas Covered by the ESA
Key Areas Covered by the ESA
Signup and view all the flashcards
Independent Experts in ESA
Independent Experts in ESA
Signup and view all the flashcards
ESA and Vulnerable Groups
ESA and Vulnerable Groups
Signup and view all the flashcards
ESA and Associated Facilities
ESA and Associated Facilities
Signup and view all the flashcards
ESA for Sub-Projects
ESA for Sub-Projects
Signup and view all the flashcards
Environmental and Social Management Plan (ESMP)
Environmental and Social Management Plan (ESMP)
Signup and view all the flashcards
Legal Status of the ESMP
Legal Status of the ESMP
Signup and view all the flashcards
Sectoral ESIA
Sectoral ESIA
Signup and view all the flashcards
Bank's Review of Completed or Partial ESAs
Bank's Review of Completed or Partial ESAs
Signup and view all the flashcards
Coordination of Environmental & Social Responsibilities
Coordination of Environmental & Social Responsibilities
Signup and view all the flashcards
Proportionate Environmental and Social Assessments (ESA)
Proportionate Environmental and Social Assessments (ESA)
Signup and view all the flashcards
Purpose of the Environmental and Social Standards (ESSs)
Purpose of the Environmental and Social Standards (ESSs)
Signup and view all the flashcards
IPF Projects and Environmental and Social Policies
IPF Projects and Environmental and Social Policies
Signup and view all the flashcards
Environmental and Social Assessment of Technical Assistance Projects
Environmental and Social Assessment of Technical Assistance Projects
Signup and view all the flashcards
What is an Environmental and Social Management Plan (ESMP)?
What is an Environmental and Social Management Plan (ESMP)?
Signup and view all the flashcards
What is an Analysis of Alternatives?
What is an Analysis of Alternatives?
Signup and view all the flashcards
What are the borrower's commitments related to the ESMP?
What are the borrower's commitments related to the ESMP?
Signup and view all the flashcards
What is an Environmental and Social Commitment Plan (ESCP)?
What is an Environmental and Social Commitment Plan (ESCP)?
Signup and view all the flashcards
How are compensation and offset costs incorporated?
How are compensation and offset costs incorporated?
Signup and view all the flashcards
What is a Cumulative Impact Assessment?
What is a Cumulative Impact Assessment?
Signup and view all the flashcards
What is a Vulnerability Assessment?
What is a Vulnerability Assessment?
Signup and view all the flashcards
What is a Regional ESIA?
What is a Regional ESIA?
Signup and view all the flashcards
Borrower's Commitments related to the ESMP
Borrower's Commitments related to the ESMP
Signup and view all the flashcards
Analysis of Alternatives
Analysis of Alternatives
Signup and view all the flashcards
How does the borrower ensure project monitoring?
How does the borrower ensure project monitoring?
Signup and view all the flashcards
Which standards are enforced by the Bank?
Which standards are enforced by the Bank?
Signup and view all the flashcards
Can the Bank accept less stringent measures?
Can the Bank accept less stringent measures?
Signup and view all the flashcards
What is the Borrower's responsibility regarding the project?
What is the Borrower's responsibility regarding the project?
Signup and view all the flashcards
How does the borrower justify less stringent measures?
How does the borrower justify less stringent measures?
Signup and view all the flashcards
Why might less stringent measures be proposed?
Why might less stringent measures be proposed?
Signup and view all the flashcards
What are the ESSs?
What are the ESSs?
Signup and view all the flashcards
What does each ESS address?
What does each ESS address?
Signup and view all the flashcards
How are the ESSs tailored to specific projects?
How are the ESSs tailored to specific projects?
Signup and view all the flashcards
What assessment is required before a project is financed?
What assessment is required before a project is financed?
Signup and view all the flashcards
How is the ESA tailored to a specific project?
How is the ESA tailored to a specific project?
Signup and view all the flashcards
What documents outline how a borrower will manage environmental and social risks?
What documents outline how a borrower will manage environmental and social risks?
Signup and view all the flashcards
What are the main purposes of the ESCP?
What are the main purposes of the ESCP?
Signup and view all the flashcards
What are the borrower's responsibilities towards vulnerable groups?
What are the borrower's responsibilities towards vulnerable groups?
Signup and view all the flashcards
What are cumulative impacts?
What are cumulative impacts?
Signup and view all the flashcards
What information must the borrower provide to the bank about cumulative impacts?
What information must the borrower provide to the bank about cumulative impacts?
Signup and view all the flashcards
How does the borrower improve its environmental and social framework?
How does the borrower improve its environmental and social framework?
Signup and view all the flashcards
When should a cumulative impact assessment be conducted?
When should a cumulative impact assessment be conducted?
Signup and view all the flashcards
Significant Residual Impacts
Significant Residual Impacts
Signup and view all the flashcards
What is the mitigation hierarchy?
What is the mitigation hierarchy?
Signup and view all the flashcards
How are Suppliers' Impacts Considered?
How are Suppliers' Impacts Considered?
Signup and view all the flashcards
How are Associated Facilities Evaluated?
How are Associated Facilities Evaluated?
Signup and view all the flashcards
How are Sub-Projects Assessed?
How are Sub-Projects Assessed?
Signup and view all the flashcards
How is Sub-Project Assessment Proportionate?
How is Sub-Project Assessment Proportionate?
Signup and view all the flashcards
How does the ESA Consider Associated Activities?
How does the ESA Consider Associated Activities?
Signup and view all the flashcards
How are Disadvantaged Groups Considered?
How are Disadvantaged Groups Considered?
Signup and view all the flashcards
What are Significant Residual Impacts?
What are Significant Residual Impacts?
Signup and view all the flashcards
Sub-project assessment
Sub-project assessment
Signup and view all the flashcards
Assessing Associated Facilities
Assessing Associated Facilities
Signup and view all the flashcards
Independent Experts Needed
Independent Experts Needed
Signup and view all the flashcards
Addressing Disadvantaged Groups
Addressing Disadvantaged Groups
Signup and view all the flashcards
Suppliers' Environmental Impact
Suppliers' Environmental Impact
Signup and view all the flashcards
What is a Borrower's ES Framework?
What is a Borrower's ES Framework?
Signup and view all the flashcards
When is a Cultural Heritage Management Plan needed?
When is a Cultural Heritage Management Plan needed?
Signup and view all the flashcards
What is a Sectoral EIA?
What is a Sectoral EIA?
Signup and view all the flashcards
What is a Direct Impact?
What is a Direct Impact?
Signup and view all the flashcards
What is an Indirect Impact?
What is an Indirect Impact?
Signup and view all the flashcards
What's the project's lifecycle?
What's the project's lifecycle?
Signup and view all the flashcards
What are Induced Impacts?
What are Induced Impacts?
Signup and view all the flashcards
How does the Borrower's ES Framework align with national regulations?
How does the Borrower's ES Framework align with national regulations?
Signup and view all the flashcards
Joint Financing
Joint Financing
Signup and view all the flashcards
Vulnerable Groups
Vulnerable Groups
Signup and view all the flashcards
Project Monitoring
Project Monitoring
Signup and view all the flashcards
Environmental and Social Standards
Environmental and Social Standards
Signup and view all the flashcards
Environmental and Social Standards (ESSs)
Environmental and Social Standards (ESSs)
Signup and view all the flashcards
Cumulative Impacts
Cumulative Impacts
Signup and view all the flashcards
Borrower's Responsibility
Borrower's Responsibility
Signup and view all the flashcards
What is the Environmental and Social Assessment (ESA)?
What is the Environmental and Social Assessment (ESA)?
Signup and view all the flashcards
What is the Environmental and Social Commitment Plan (ESCP)?
What is the Environmental and Social Commitment Plan (ESCP)?
Signup and view all the flashcards
Why is addressing vulnerable groups important in the ESCP?
Why is addressing vulnerable groups important in the ESCP?
Signup and view all the flashcards
Why are Associated Facilities Evaluated?
Why are Associated Facilities Evaluated?
Signup and view all the flashcards
What are projects funded by IPF subject to?
What are projects funded by IPF subject to?
Signup and view all the flashcards
What outlines how a borrower manages environmental and social risks?
What outlines how a borrower manages environmental and social risks?
Signup and view all the flashcards
What responsibilities does the borrower have towards vulnerable groups?
What responsibilities does the borrower have towards vulnerable groups?
Signup and view all the flashcards
Less Stringent Measures
Less Stringent Measures
Signup and view all the flashcards
Improving ES Framework
Improving ES Framework
Signup and view all the flashcards
Borrower's Environmental and Social (ES) Responsibility
Borrower's Environmental and Social (ES) Responsibility
Signup and view all the flashcards
Justification for Less Stringent Measures
Justification for Less Stringent Measures
Signup and view all the flashcards
Borrower's ES Framework Changes
Borrower's ES Framework Changes
Signup and view all the flashcards
Assessing Environmental and Social Risks
Assessing Environmental and Social Risks
Signup and view all the flashcards
ES Framework Consistency
ES Framework Consistency
Signup and view all the flashcards
What is the ESCP?
What is the ESCP?
Signup and view all the flashcards
Changes in ES Framework
Changes in ES Framework
Signup and view all the flashcards
Identifying Environmental and Social Risks
Identifying Environmental and Social Risks
Signup and view all the flashcards
Types of Assessments
Types of Assessments
Signup and view all the flashcards
Inconsistency with ES Framework
Inconsistency with ES Framework
Signup and view all the flashcards
Approval for ESCP Changes
Approval for ESCP Changes
Signup and view all the flashcards
Stakeholder Engagement for ES Framework Changes
Stakeholder Engagement for ES Framework Changes
Signup and view all the flashcards
ESCP: Environmental and Social Commitment Plan
ESCP: Environmental and Social Commitment Plan
Signup and view all the flashcards
Compensation or Offset
Compensation or Offset
Signup and view all the flashcards
How are Sub-Projects Evaluated?
How are Sub-Projects Evaluated?
Signup and view all the flashcards
ESA - Environmental and Social Assessment
ESA - Environmental and Social Assessment
Signup and view all the flashcards
Supplier's Impact
Supplier's Impact
Signup and view all the flashcards
Associated Facilities
Associated Facilities
Signup and view all the flashcards
Proportionate Assessment
Proportionate Assessment
Signup and view all the flashcards
Study Notes
Environmental and Social Risk Assessment
- ESS1 outlines the Borrower's responsibilities for assessing, managing, and monitoring environmental and social risks throughout a Bank-funded project.
- The Environmental and Social Standards (ESSs) help Borrowers manage risks and improve performance using a risk and outcomes-based approach, with objectives and specific requirements.
- Borrowers conduct environmental and social assessments of projects to ensure environmental and social soundness and sustainability.
- Assessments must be proportionate to the project's risks and impacts and inform both project design and decision-making.
- Risks and impacts are managed throughout the project lifecycle, reflecting the project's nature, scale, and potential risks.
- The Borrower may utilize national environmental and social frameworks, if consistent with ESSs, to manage project risks. (e.g., for implementation of the project)
- Borrowers are responsible for ensuring projects meet ESS requirements even if they are not directly implementing the project (e.g., contractors are considered under the Borrower's control).
- The Borrower may need to demonstrate, to the Bank's satisfaction, that a chosen alternative performance level is consistent with the objectives of the ESSs and the applicable EHSGs, and is unlikely to result in any significant environmental or social harm.
- Associated facilities (activities not funded, but directly related and necessary for project viability) are also subject to ESS1; these must be managed to the extent the borrower has control.
- The borrower will conduct an environmental and social assessment of the project, taking into account stakeholder engagement.
- Stakeholder engagement and disclosure are necessary to ensure that the project's potential risks and impacts are well-understood and managed.
- The ESS1 assessment must consider all relevant direct, indirect, and cumulative risks and impacts throughout the project's life cycle. This includes those specifically identified in ESS2-10.
- Associated facilities' activities not funded, but necessary for project viability, require a review of risks and impacts, aligned with the level of control or influence by the borrower.
Scope of Application
- ESS1 applies to all projects funded by the Bank through Investment Project Financing, including technical assistance and other related activities.
- The term "project" is defined within the legal agreement.
- Borrowers cooperate with multilateral/bilateral funding agencies on common assessment and management approaches; a common approach is applicable even when multiple stakeholders are involved, if agreed.
- The common approach must ensure project objectives are consistent with ESSs.
- ESS1 also applies to all associated facilities; these must be managed to the extent the borrower has influence.
- Associated Facilities relate to activities not funded, but are directly related and necessary for project viability (e.g., necessary for project to be viable).
- OP 10.00 Investment Project Finance and other applicable terms are considered for scope assessment and are integrated into the ESS framework; this includes guarantees and other related instruments.
- ESS1 applies to all associated facilities, including activities that are not funded but are directly linked and crucial for the project's successful operation.
- ESS1 applies to all associated facilities to the extent the Borrower has direct control or influence over them.
- ESS1 applies to projects including technical assistance, provided through stand-alone projects or as part of larger projects.
Objectives
- Identify, evaluate, and manage environmental and social risks and impacts.
- Employ a mitigation hierarchy: avoid, minimize, mitigate, compensate for unavoidable residual impacts.
- Ensure adverse impacts do not disproportionately affect disadvantaged or vulnerable groups; measures are needed to promote equity and access to benefits for all.
- Utilize national environmental and social institutions and frameworks, where appropriate; national/local laws, regulations, and institutions are incorporated.
- Improve environmental and social performance, building Borrower capacity; this includes training.
- Conduct environmental and social due diligence; and ensure the project is consistent with (and within) the boundaries of the Bank's Articles of Agreement.
- The environmental assessment should include identifying, evaluating, and managing the environmental and social risks and impacts associated with primary suppliers as required by ESS2 and ESS6.
- Environmental and social assessments should be in line with the mitigation hierarchy, ensuring consideration of risks associated with different phases of a project (e.g. pre-construction, construction, operation, decommissioning).
Requirements
- Borrowers assess, manage, and monitor environmental and social risks and impacts throughout a project's lifecycle.
- Conduct environmental and social assessments, proportionate to potential risks, utilizing methods that reflect the specific project and context. Stakeholder engagement is a critical component (e.g., stakeholder engagement and disclosure, appropriate information, and accurate description of the project and related risks).
- Implement stakeholder engagement following ESS10, with a focus on disclosure of information that is proportionate to the nature of stakeholders' interests and the potential environmental/social risks and impacts of a project throughout the entire lifecycle.
- Develop and implement the Environmental and Social Commitment plan (ESCP).
- Conduct stakeholder engagement, disclose appropriate information.
- Associated facilities activities not funded, but necessary for project viability, require review of risks and impacts, aligned with the level of control or influence by the borrower.
- National laws and institutions to be considered (including compliance with international treaties).
- Borrowers notify the bank of any significant changes in the framework and conduct additional assessment, if applicable, in response to the changes; this includes appropriate notification regarding significant project changes.
- Follow the detailed requirements of ESS1 and the appropriate annexes for the project, including EHSGs.
- All relevant good international practices (GIIP) are incorporated across the assessment, management, and monitoring phases of the project.
Environmental and Social Commitment Plan (ESCP)
- The ESCP outlines measures/actions for project compliance with ESSs, within a specified timeframe.
- The ESCP integrates assessment findings, Bank due diligence, and stakeholder engagement and integrates into the project lifecycle.
- The ESCP incorporates a system for adaptive management of proposed project changes.
- The ESCP describes the management tools used (e.g., environmental and social management plans, operational policies).
- Common approach is included in ESCP when established.
- Project-specific aspects and requirements are included in the scope of the project, and compliance requirements are included within the plan; completion dates and provisions for adaptive management to respond to changes in the project lifecycle are included.
- The ESCP will be developed as information regarding the potential risks and impacts of the project becomes known.
- The ESCP will take into account the findings of the environmental and social assessment, the Bank's environmental and social due diligence, and the results of stakeholder engagement.
- Timeframes for plan completion should be explicitly defined.
- The ESCP details management tools, utilizing elements like environmental and social management plans, frameworks, operational policies, operational manuals, management systems, procedures, practices, and financial investments. Such management tools incorporate the mitigation hierarchy in their application, and consider relevant laws and regulations alongside the ESSs.
Project Monitoring and Reporting
- Monitor project environmental and social performance in accordance with ESCP.
- The monitoring method will be proportionate to the nature of the project, potential risks, and compliance requirements, ensuring monitoring is in line with the project’s implementation phases; regular, ongoing monitoring is necessary.
- Report results to the Bank regularly, including stakeholder engagement information, according to the ESCP (at least annually).
- Corrective and preventive actions are to be implemented based on monitoring results, adjusting as needed throughout the project lifecycle.
- Site visits may be performed by Bank staff.
- Promptly notify the Bank of any changes that could impact the environmental/social risk assessment and seek approval for adjustments, as required (e.g., changes affecting project lifecycle, stakeholders, etc.).
- Follow the detailed requirements of ESS1 and the appropriate annexes for the project, including the ESCP, and other established tools.
- The ESCP should contain a clear description of all the roles and responsibilities of the various parties involved in managing the project's environmental and social aspects.
- The monitoring and reporting should incorporate the project’s entire lifecycle (pre-construction, construction, operation, decommissioning, closure, and reinstatement).
Stakeholder Engagement and Disclosure
- Borrowers engage with stakeholders throughout the project lifecycle regarding environmental and social risks, impacts, and required information, with proportionate and meaningful disclosure. Disclosures should be easily accessible and understandable by the target audience.
- Information disclosure is proportionate to risk levels, specifically for high-risk projects.
- Documentation disclosure is subject to agreement with Bank.
- Engagement and disclosure should consider all stakeholders, addressing potential issues that could negatively affect them; this includes indigenous communities, for example.
- The scope, frequency, and method of engagement should be clearly defined.
Environmental and Social Audit Assessment
- Environmental and Social audit assesses significant environmental and social issues in existing projects/activities against the ESSs.
- Audits should examine specific risk areas (community safety, climate change, natural resource usage, cultural heritage).
- The audit should identify and assess risks relating to potential project impacts and incorporate national policies, laws, regulations, and institutions, including international treaties.
- Assess potential conflicts between the project and existing tensions or conflicts within affected communities, engaging with stakeholders for a more comprehensive perspective.
- The assessment should integrate national regulatory requirements of host countries, particularly highlighting differences from EHSGs.
- High-risk or contentious projects may require international expert involvement to address specific concerns.
- All associated issues (risks and impacts) of associated facilities are to be incorporated into the audit, outlining the process for managing those risks.
- Consideration of transboundary and global risks and impacts (effluents, emissions, water contamination, climate change, etc.). Thorough risk profiles for all aspects of the project and relevant stakeholders should be developed. A specific focus on cumulative, direct, and indirect impacts are outlined for consideration in the assessments.
- Ensure that the audit is conducted in a way that is appropriate to the specific context of the project and the potential risks and impacts.
- Explicitly consider and address any potentially significant environmental and social risks and impacts associated with the project, including risks to cultural heritage, and indigenous peoples, and transboundary risks.
- The audit should explicitly consider the adequacy of existing environmental and social frameworks.
- The assessment needs to cover risks and impacts throughout the project lifecycle, including pre-construction, construction, operation, decommissioning, and closure.
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.
Related Documents
Description
This quiz covers the key principles of Environmental and Social Standards (ESSs) as outlined in ESS1. Participants will learn about the Borrower's responsibilities for assessing and managing environmental and social risks in Bank-funded projects. The quiz emphasizes the importance of risk assessments in ensuring project sustainability and informed decision-making.