18 Questions
What is the Client required to provide the Civil Engineer within a reasonable time?
All information required by the Civil Engineer to perform his services
What is the Client required to do with regards to the Civil Engineer's performance of services?
Cooperate with the Civil Engineer and not interfere or obstruct the proper performance of the Services
What is the Client required to do to enable the Civil Engineer to enter the site and inspect facilities?
Make arrangements as soon as practicable to enable the Civil Engineer to enter the site and inspect facilities
Who is responsible for arranging and bearing the costs of services from other professionals or third parties?
The Client is responsible for arranging and bearing the costs
When the Civil Engineer is required to administer the work of other professionals or third parties, who should instructions be given through?
The Client should give instructions to the Civil Engineer, who will then pass them on to the other professionals or third parties
What is the primary responsibility of the Client in their relationship with the Civil Engineer?
To cooperate with the Civil Engineer and facilitate the performance of their services
What is the primary responsibility of the Civil Engineer during the Preliminary Design Phase?
Reviewing preliminary reports and defining project requirements
Which of the following is NOT a responsibility of the Client during the Final Design Phase?
Preparing construction drawings and specifications
What is a key aspect of the cooperation between the Civil Engineer and the Client?
The Civil Engineer provides periodic status reports to the Client
At what stage are payment terms and project costs typically discussed?
During the Preliminary Design Phase
What is the purpose of the Bidding or Negotiating Phase?
To select contractors and negotiate contracts for construction
When should arrangements for site inspection typically be made?
During the Preliminary Design Phase
Which of the following is NOT a special service provided by Civil Engineers for construction projects?
Negotiating contracts with subcontractors
What is the primary purpose of the AMO Seminar?
To teach contractors about construction safety and legal aspects
Which of the following services is NOT typically provided by a Civil Engineer?
Selecting and engaging contractors
What is the role of a Civil Engineer in litigation related to a construction project?
Assist the client as an expert witness
Which of the following services requires close cooperation between the Civil Engineer and the client?
Redesign to reflect changes by the client
What is the purpose of value engineering in a construction project?
To optimize the project design and construction for maximum value
Test your knowledge on the responsibilities of the client in cooperating with a civil engineer. Understand the importance of providing required information and decisions promptly, and avoiding interference with the engineer's work.