EDD Inspector's Duties Quiz
9 Questions
0 Views

EDD Inspector's Duties Quiz

Created by
@ObtainableInspiration

Questions and Answers

What is the minimum acceptable insulation resistance in the test?

  • 1 kilohm
  • 2 megohms
  • 1 megohm (correct)
  • 1 ohm
  • Which test does the EDD Inspector conduct?

  • Insulation resistance test (correct)
  • Voltage drop test
  • Power factor test
  • Current leakage test
  • What voltage supply is applied to the installation during the test?

  • 500 volts D.C. (correct)
  • 500 volts A.C.
  • 1000 volts A.C.
  • 1000 volts D.C.
  • What is the responsibility of the contractor regarding the submission of load values to EDD?

    <p>The contractor shall submit the values of individual load connected to the installation (in the form approved by EDD for that purpose) to EDD before the visit of EDD inspector to the installation.</p> Signup and view all the answers

    What is the role of the EDD Inspector in relation to the tests on the installation?

    <p>The role of the EDD Inspector is to witness the tests and certify the test certificates.</p> Signup and view all the answers

    What is the contractor required to provide for the measurement of earth electrode resistance?

    <p>The contractor shall provide all necessary assistance required for carrying out the test, including the testing apparatus and auxiliary electrodes.</p> Signup and view all the answers

    True or false: If the installation does not meet the requirements, the contractor is responsible for rectifying the fault?

    <p>True</p> Signup and view all the answers

    True or false: If the contractor does not appear for inspection, a fee of BD 50/- will be charged for rescheduling?

    <p>True</p> Signup and view all the answers

    True or false: If a contractor defaults for more than four times, their license will be suspended for three months?

    <p>True</p> Signup and view all the answers