What is the minimum acceptable insulation resistance in the test?
What is the minimum acceptable insulation resistance in the test?
Which test does the EDD Inspector conduct?
Which test does the EDD Inspector conduct?
What voltage supply is applied to the installation during the test?
What voltage supply is applied to the installation during the test?
What is the responsibility of the contractor regarding the submission of load values to EDD?
What is the responsibility of the contractor regarding the submission of load values to EDD?
Signup and view all the answers
What is the role of the EDD Inspector in relation to the tests on the installation?
What is the role of the EDD Inspector in relation to the tests on the installation?
Signup and view all the answers
What is the contractor required to provide for the measurement of earth electrode resistance?
What is the contractor required to provide for the measurement of earth electrode resistance?
Signup and view all the answers
True or false: If the installation does not meet the requirements, the contractor is responsible for rectifying the fault?
True or false: If the installation does not meet the requirements, the contractor is responsible for rectifying the fault?
Signup and view all the answers
True or false: If the contractor does not appear for inspection, a fee of BD 50/- will be charged for rescheduling?
True or false: If the contractor does not appear for inspection, a fee of BD 50/- will be charged for rescheduling?
Signup and view all the answers
True or false: If a contractor defaults for more than four times, their license will be suspended for three months?
True or false: If a contractor defaults for more than four times, their license will be suspended for three months?
Signup and view all the answers