Questions and Answers

The Distribution Development Plan shall include energy and demand ______.

forecasts

Distribution planning studies ensure the safety and ______ of the Distribution System.

reliability

The Distribution Utility shall conduct distribution planning studies to prepare the Distribution Development Plan to be submitted annually to ______.

DOE

If a User believes that the cohesive forecast does not accurately reflect its ______ on the planning data, it shall notify the Distribution Utility.

<p>assumptions</p> Signup and view all the answers

Distribution planning studies shall be conducted to assess the impact on the Distribution System or any User System of any Demand ______.

<p>Forecast</p> Signup and view all the answers

Distribution substation ______ and sizing are essential components of the Distribution Development Plan.

<p>siting</p> Signup and view all the answers

The Distribution Reactive Power ______ plan is a crucial part of the Distribution Development Plan.

<p>compensation</p> Signup and view all the answers

A summary of the technical and economic analysis is performed to justify the ______.

<p>DDP</p> Signup and view all the answers

The User shall provide all types of ______, including Connected Load and Maximum Demand.

<p>Loads</p> Signup and view all the answers

The Electrical Diagrams and Connection Point Drawings must indicate the quantities, ratings, and operating parameters of ______ equipment.

<p>Electrical</p> Signup and view all the answers

The User must provide the rated and operating ______ of the overhead lines or underground cables.

<p>Voltage</p> Signup and view all the answers

Positive sequence resistance and ______ are necessary parameters for overhead lines and underground cables.

<p>reactance</p> Signup and view all the answers

The User shall provide the values of zero sequence resistance and ______ for accurate circuit parameter assessment.

<p>reactance</p> Signup and view all the answers

The Distribution Utility shall conduct distribution planning analysis which shall include the determination of optimum patterns for the selection of sites and sizes of distribution ______.

<p>substations</p> Signup and view all the answers

Voltage drop studies shall be performed to determine the Voltages at the Connection Points for the forecasted ______ of the existing Distribution System.

<p>Demand</p> Signup and view all the answers

Short circuit studies shall be performed to evaluate the effect on the Distribution System Equipment of the connection of new ______ Plants.

<p>Generating</p> Signup and view all the answers

The studies shall identify the Equipment that could be damaged when ______ exceeds the design limit of the Equipment.

<p>current</p> Signup and view all the answers

Three-phase short-circuit studies shall be performed for all nodes of the Distribution System for the maximum and minimum ______ scenarios.

<p>generation</p> Signup and view all the answers

The Distribution Utility and the User shall exchange information on ______ infeed levels at the Connection Point.

<p>fault</p> Signup and view all the answers

The development of optimum ______ configuration and switching controls for distribution feeders is essential for effective distribution management.

<p>feeder</p> Signup and view all the answers

Lifecycle costing methods are used to analyze the cost of capital and the discount ______ in distribution planning studies.

<p>rate</p> Signup and view all the answers

The notice shall contain the purpose and nature of the proposed ______, the extent and condition of the Equipment involved.

<p>System Test</p> Signup and view all the answers

An invitation to nominate representatives for the ______ Group to be established to coordinate the proposed System Test.

<p>System Test</p> Signup and view all the answers

The members of the System Test Group shall meet within 1 month after the Test Group is ______.

<p>established</p> Signup and view all the answers

The ______ Utility may decide to proceed with the proposed System Test even if the affected Users fail to reply within that period.

<p>Distribution</p> Signup and view all the answers

The System Test Coordinator may come from the Distribution Utility or the System Test ______.

<p>Proponent</p> Signup and view all the answers

The Distribution Utility shall ensure that the Safety Precautions in the Distribution System and on the System of all ______ involved are coordinated and implemented.

<p>Users</p> Signup and view all the answers

If a User becomes aware that Safety Precautions are also required in the System of other ______, the Distribution Utility shall be promptly informed.

<p>Users</p> Signup and view all the answers

The Distribution Utility and the User shall assign a ______ Coordinator who shall be responsible for the coordination of Safety Precautions.

<p>Safety</p> Signup and view all the answers

Any party who wants to change its Safety ______ shall notify the other party of the change.

<p>Coordinator</p> Signup and view all the answers

The Safety Coordinator requesting that a Safety Precaution be applied on the System of the other party shall be referred to as the ______ Safety Coordinator.

<p>Requesting</p> Signup and view all the answers

The Safety Coordinator that will implement the requested Safety Precaution shall be referred to as the ______ Safety Coordinator.

<p>Implementing</p> Signup and view all the answers

If work or testing requires Safety Precautions on the MV and HV Equipment of the User System, the Requesting Safety Coordinator shall contact the ______ Safety Coordinator.

<p>Implementing</p> Signup and view all the answers

Safety Precautions must be coordinated and implemented in the Distribution System and the Systems of the affected ______.

<p>Users</p> Signup and view all the answers

The Black Start Test shall demonstrate that the Embedded Generating Unit with Black Start capability can implement a ______ procedure.

<p>Black Start</p> Signup and view all the answers

To pass the Black Start Test, the Embedded Generating Unit shall start on its own, synchronize with the Grid through the ______ System.

<p>Distribution</p> Signup and view all the answers

The Declared Data Capability Test shall demonstrate that the Embedded Generating Unit can be ______ and dispatched in accordance with the Declared Data.

<p>scheduled</p> Signup and view all the answers

The Dispatch Accuracy Test assesses if the Embedded Generating Unit meets the relevant Dispatch ______ and Dispatch Parameters.

<p>Scheduling</p> Signup and view all the answers

In terms of synchronization, the process is achieved within ±5 minutes of the registered ______ time.

<p>synchronization</p> Signup and view all the answers

The actual ramp rate should be within ±10% of the registered ______ rate.

<p>ramp</p> Signup and view all the answers

For load reduction rates, the actual Load reduction rate should be within ±10% of the registered load ______ rate.

<p>reduction</p> Signup and view all the answers

All other Dispatch Scheduling and Dispatch Parameters must be within ±1.5% of the declared ______.

<p>values</p> Signup and view all the answers

Study Notes

Chapter 5: Distribution Planning

  • Purpose: Specify responsibilities of distribution utilities and users in developing the distribution system, ensure system safety and reliability, detail data requirements for new/modified connections to the system, and specify data for distribution system development.

Distribution Planning Responsibilities and Procedures

  • Distribution Utility Responsibilities: Responsible for distribution planning, including analyzing the impact of new facilities (e.g., embedded generating plants, loads, lines, substations), planning system expansion to meet forecasted demand and new connections, and identifying/correcting problems in power quality, system loss, and reliability.

  • User Responsibilities: Cooperate with the utility in maintaining distribution planning data, providing required standard/detailed planning data as requested by the utility, and submitting annual historical and forecast planning data for the next five years by a set date. This data should include updated standard and detailed planning data.

  • Data Submission: Users must submit planning data as required by the utility. This includes the relevant standard and detailed planning data, both annually and as required, as defined in specific articles.

  • Evaluation of Proposed Development: Distribution utility conducts distribution impact studies to evaluate an impact on the system and other users. Utility notifies user of impact of any planned development in the distribution system that may affect the user's system.

Chapter 6: Distribution Operations

  • Purpose: Define operational responsibilities of distribution utilities and users, indicate arrangements for mutual assistance and equipment/inventory sharing, specify requirements for communication and notice issuance, describe demand control strategies (frequency and voltage), detail procedures during emergencies, specify testing of power quality, detail system tests which may cause unusual conditions, specify tests confirming Embedded Generating Unit compliance with registered parameters, and requirements for site and equipment identifier at connection points.

  • Operational Responsibilities: Distribution utility is responsible for operating, maintaining the power quality of the distribution system, providing distribution maintenance programs, maintaining and providing distribution equipment and facilities.

  • Responsibilities of Embedded Generation Companies: Ensure generating units can deliver stated generation capabilities in connection agreements, provide accurate and timely operation data to the utility, execute instructions of the utility during normal, alert, or emergency conditions.

  • Responsibilities of Large VRE Embedded Generation Companies: Specify operations mode (Free Active Production, other control), System Operator is required to make best efforts to allow continuation of Free Active Power Production mode for Large VRE, under emergency/extreme situations the System Operator and Distribution Utility shall issue appropriate instructions related to operation.

  • Operations Arrangements: Mutual assistance procedures between Distribution Utilities and users, including mutual aid programs for emergencies.

  • Coordination Procedures: Describe methods for safety procedures, coordination communications, and notices, also defines the responsibilities of a Safety Coordinator within a Distribution System.

  • Testing and Monitoring: Distribute utility tests and/or monitors power quality in the system, test occurs at the user's request, and measures effect of a user on the system.

Chapter 7: Distribution Revenue Metering Requirements

  • Purpose: Establish rules for metering active and reactive energy and demand for distribution systems, ensure accurate procedures for metering data.

  • Requirements/Equipment: Specify requirements for revenue metering equipment (revenue meters, instrument transformers, connecting cables, etc.), the location (connection points, usually), and any procedure to handle energy loss if the connection point meter isn't feasible.

  • Metering Responsibilities: Distribution Utility or the Meter Service Provider (MSP) is responsible for the design, installation, operation, and maintenance of the metering system, ensuring its integrity and accuracy.

  • Types of Metering: Define requirements for active and reactive energy and demand metering.

  • Instrument Transformers: Specify required equipment standards; voltage and current transformers are covered under specific standards.

  • Requirements for Distribution Revenue Meters: Provide type and standards for metering; different types of meters are required for low and medium/high voltage customers.

  • Meter Reading and Metering Data: Define the types of metering data, its storage, who has access, and how it is delivered.

Chapter 8: Philippine Distribution Code—Transition Provisions

  • Purpose: Introduce procedures for permanent exemptions from some Code requirements.

  • Compliance of Distribution Utilities and Users: Specify the compliance requirement for Distribution Utilities, Embedded Generation Companies, Metering Service Providers, and other users, including submitting a Compliance Report to the ERC.

  • Compliance Dates: Specify compliance deadlines for existing Distribution Utilities, new users who are not yet in compliance with the rules specified by the distribution code, and meter providers.

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

Related Documents

Description

This quiz covers key concepts related to the Distribution Development Plan, including distribution planning studies, energy demand assessments, and the role of the Distribution Utility. Participants will learn about the importance of forecasting and the technical components necessary for effective distribution planning.

More Like This

Use Quizgecko on...
Browser
Browser