Below are activities that are included in the
schedule of detailed engineering EXCEPT
Below are activities that are included in the schedule of detailed engineering EXCEPT
- Field Surveys and Investigations (correct)
- Site investigations
- Soils and Foundation Investigation
- Construction Materials Investigation
The following documents embody the nondiscretionary "pass/fail" criteria for prequalification or eligibility for the contract to be bid except.
The following documents embody the nondiscretionary "pass/fail" criteria for prequalification or eligibility for the contract to be bid except.
- Legal Documents
- Technical Documents
- Financial Documents
- Operating Documents (correct)
The timeframe for the processing of variation
orders from the preparation up to the approval
by the implementing agency concerned shall
not exceed ________ calendar days.
The timeframe for the processing of variation orders from the preparation up to the approval by the implementing agency concerned shall not exceed ________ calendar days.
- 28
- 30 (correct)
- 31
- 14
What is PD 1594?
What is PD 1594?
If, after ___ percent completion, the work is
satisfactory done and on schedule, no
additional retention shall be made; otherwise,
the ten percent (10%) retention shall be
imposed.
If, after ___ percent completion, the work is satisfactory done and on schedule, no additional retention shall be made; otherwise, the ten percent (10%) retention shall be imposed.
Bids may be withdrawn only in writing _
working days before the deadline of submission
of bids
Bids may be withdrawn only in writing _ working days before the deadline of submission of bids
What is section 61?
What is section 61?
Which of the following is the reason that an
extension of contract time may be granted?
Which of the following is the reason that an extension of contract time may be granted?
RULE XXV is also known as?
RULE XXV is also known as?
For projects whereby the Notice to Proceed
(NTP) is issued after how many calendar days
from the bidding date?
For projects whereby the Notice to Proceed (NTP) is issued after how many calendar days from the bidding date?