What is the key factor that influences making design decisions for a data center?

  • Geographical location of the data center
  • Cost of the equipment
  • Availability levels of different tasks (correct)
  • Number of machines in the data center
  • Which operations at the Chekhovian Bank data center are classified as 'mission-critical'?

  • Home loans
  • General transactions
  • Security and equities trading (correct)
  • ATM transactions
  • Why is it recommended to have redundant systems for highly utilized (mission-critical) tasks like ATM transactions?

  • To ensure continuous availability (correct)
  • To save electricity
  • To reduce maintenance costs
  • To improve efficiency
  • Which type of task at the Chekhovian Bank data center can tolerate occasional downtime without disastrous consequences?

    <p>Home loans</p> Signup and view all the answers

    In the context of the Chekhovian Bank data center, what is a good idea even though some corners can be cut?

    <p>Adding redundancy for home loans</p> Signup and view all the answers

    Why is it important to analyze historical data and general trends when determining the availability profile of machines in a data center?

    <p>To understand the risk and make informed decisions</p> Signup and view all the answers

    What should the entire design team consider in every aspect of the design process?

    <p>Insurance and local building codes</p> Signup and view all the answers

    Why is it essential to have continual dialog with insurers and building authorities during the design phases?

    <p>To avoid unnecessary changes to the plans at the last minute</p> Signup and view all the answers

    In the U.S., when is code approval required for a construction project?

    <p>First for the building plans, then after the construction is complete</p> Signup and view all the answers

    What signifies that everything was installed according to code in the U.S.?

    <p>Later approval ensuring installation matches approved plans</p> Signup and view all the answers

    What are some potential factors that may make a data center project financially unviable?

    <p>Insufficient power supply from the local power company or frequent flooding problems</p> Signup and view all the answers

    Why is it crucial to assess risks and compromises during the project planning phase?

    <p>To determine if the data center project is financially viable</p> Signup and view all the answers

    What is the main reason for having redundant systems in a mission-critical data center?

    <p>To prevent costly downtime</p> Signup and view all the answers

    Why is it important to restrict access to the data center proper?

    <p>To avoid accidental contact with hardware components</p> Signup and view all the answers

    What security measures should be in place to control access to the data center?

    <p>Checkpoint-controlled access points and card readers</p> Signup and view all the answers

    Why are cameras recommended at entry points in a data center?

    <p>To be monitored by security personnel for added security</p> Signup and view all the answers

    How do redundant systems impact the overall cost of a mission-critical data center?

    <p>They can be a prudent investment to prevent million-dollar downtime costs</p> Signup and view all the answers

    What is the primary purpose of using risk analysts in determining the cost-effectiveness of redundant systems?

    <p>To evaluate if the investment in redundant systems is justified based on potential risks</p> Signup and view all the answers