Questions and Answers
What must all fittings meet in order to be installed on a boiler?
What must all fittings meet in order to be installed on a boiler?
Under what conditions are pressure fittings required to be registered as pressure components?
Under what conditions are pressure fittings required to be registered as pressure components?
Who reviews the application for registration of a fitting as a pressure component?
Who reviews the application for registration of a fitting as a pressure component?
What is issued to a fitting found suitable for pressure service?
What is issued to a fitting found suitable for pressure service?
Signup and view all the answers
What does ASME B31.1 code cover?
What does ASME B31.1 code cover?
Signup and view all the answers
What types of boilers are covered by ASME BPVC I?
What types of boilers are covered by ASME BPVC I?
Signup and view all the answers
Where can specific rules for different types of power boilers be found?
Where can specific rules for different types of power boilers be found?
Signup and view all the answers
What do heating boilers generate according to ASME BPVC IV rules?
What do heating boilers generate according to ASME BPVC IV rules?
Signup and view all the answers
Where are the requirements for safety relief valves for hot water boilers found in ASME BPVC IV?
Where are the requirements for safety relief valves for hot water boilers found in ASME BPVC IV?
Signup and view all the answers
Which section of ASME B31.1 code covers the design and fabrication of piping for pressure relief devices?
Which section of ASME B31.1 code covers the design and fabrication of piping for pressure relief devices?
Signup and view all the answers
What must be provided by the supplier for every registered fitting installed or replaced?
What must be provided by the supplier for every registered fitting installed or replaced?
Signup and view all the answers
Which ASME code should be consulted for high-pressure plant piping?
Which ASME code should be consulted for high-pressure plant piping?
Signup and view all the answers
What is the administrative jurisdiction over boiler external piping according to ASME codes?
What is the administrative jurisdiction over boiler external piping according to ASME codes?
Signup and view all the answers
Which category does boiler piping include?
Which category does boiler piping include?
Signup and view all the answers
What is essential for safety and performance of fittings and piping systems?
What is essential for safety and performance of fittings and piping systems?
Signup and view all the answers
What is prohibited in pressure service according to the jurisdictions?
What is prohibited in pressure service according to the jurisdictions?
Signup and view all the answers
What must be clearly marked on fittings for safe and proper use?
What must be clearly marked on fittings for safe and proper use?
Signup and view all the answers
What is important to avoid failure or incompatibility in fittings?
What is important to avoid failure or incompatibility in fittings?
Signup and view all the answers
What must Power Engineers consult when designing low-pressure plant piping?
What must Power Engineers consult when designing low-pressure plant piping?
Signup and view all the answers
What should never be placed in pressure service?
What should never be placed in pressure service?
Signup and view all the answers
What are examples of rules covered by ASME B31.1 for boiler external piping?
What are examples of rules covered by ASME B31.1 for boiler external piping?
Signup and view all the answers
What is a requirement for existing piping systems and new installations?
What is a requirement for existing piping systems and new installations?
Signup and view all the answers
What are the required service conditions for all fittings installed on a boiler?
What are the required service conditions for all fittings installed on a boiler?
Signup and view all the answers
What is the primary requirement for a fitting to be registered as a pressure component?
What is the primary requirement for a fitting to be registered as a pressure component?
Signup and view all the answers
Where should the application for registration of a fitting as a pressure component be made?
Where should the application for registration of a fitting as a pressure component be made?
Signup and view all the answers
What is the role of design engineers in the registration process of a fitting as a pressure component?
What is the role of design engineers in the registration process of a fitting as a pressure component?
Signup and view all the answers
What must be provided by the supplier for every registered fitting installed or replaced?
What must be provided by the supplier for every registered fitting installed or replaced?
Signup and view all the answers
Where are the requirements for safety relief valves for hot water boilers found in ASME BPVC IV?
Where are the requirements for safety relief valves for hot water boilers found in ASME BPVC IV?
Signup and view all the answers
What does ASME BPVC I have administrative jurisdiction over?
What does ASME BPVC I have administrative jurisdiction over?
Signup and view all the answers
Which ASME code should be consulted for high-pressure plant piping?
Which ASME code should be consulted for high-pressure plant piping?
Signup and view all the answers
What is important to avoid failure or incompatibility in fittings?
What is important to avoid failure or incompatibility in fittings?
Signup and view all the answers
What type of boilers are covered by ASME BPVC I?
What type of boilers are covered by ASME BPVC I?
Signup and view all the answers
What does boiler piping include?
What does boiler piping include?
Signup and view all the answers
Where can specific rules for different types of power boilers be found?
Where can specific rules for different types of power boilers be found?
Signup and view all the answers
What is the administrative jurisdiction over boiler external piping according to ASME codes?
What is the administrative jurisdiction over boiler external piping according to ASME codes?
Signup and view all the answers
Under what conditions are pressure fittings required to be registered as pressure components?
Under what conditions are pressure fittings required to be registered as pressure components?
Signup and view all the answers
What does ASME B31.1 code cover?
What does ASME B31.1 code cover?
Signup and view all the answers
What is important to avoid failure or incompatibility in fittings?
What is important to avoid failure or incompatibility in fittings?
Signup and view all the answers
What must Power Engineers consult when designing low-pressure plant piping?
What must Power Engineers consult when designing low-pressure plant piping?
Signup and view all the answers
Where are the requirements for safety relief valves for hot water boilers found in ASME BPVC IV?
Where are the requirements for safety relief valves for hot water boilers found in ASME BPVC IV?
Signup and view all the answers
What must all fittings meet in order to be installed on a boiler?
What must all fittings meet in order to be installed on a boiler?
Signup and view all the answers
What is issued to a fitting found suitable for pressure service?
What is issued to a fitting found suitable for pressure service?
Signup and view all the answers
What should never be placed in pressure service?
What should never be placed in pressure service?
Signup and view all the answers
Study Notes
-
Fittings requiring registration include pipe fittings, expansion joints, hose assemblies, measuring devices, and pressure relief devices.
-
Registration material (including CRN) must be provided by the supplier for every registered fitting installed or replaced.
-
Jurisdictions prohibit the use of non-registered fittings in pressure service.
-
Fittings must be clearly marked with manufacturer name, service designation, and material designation for safe and proper use.
-
Power Engineers must consult the correct ASME codes (BPVC I for high-pressure plant piping, and B31.1, BPVC IV, and B31.9 for low-pressure plant piping) when designing, repairing, or installing piping systems.
-
Boiler piping is divided into three categories: boiler proper piping, boiler external piping, and nonboiler external piping.
-
Existing piping systems and new installations must follow the correct code for safe and durable piping systems.
-
ASME BPVC I has administrative jurisdiction over boiler external piping, but ASME B31.1 has technical jurisdiction, including rules for steam piping, feedwater piping, blowoff piping, and blowdown piping.
-
Proper identification, installation, and testing of fittings and piping systems are essential for safety and performance.
-
Improperly identified fittings or piping must never be placed in pressure service.
-
Fittings must be made of suitable materials and be of proper strength for the specific application to avoid failure or incompatibility.
-
Fittings requiring registration include pipe fittings, expansion joints, hose assemblies, measuring devices, and pressure relief devices.
-
Registration material (including CRN) must be provided by the supplier for every registered fitting installed or replaced.
-
Jurisdictions prohibit the use of non-registered fittings in pressure service.
-
Fittings must be clearly marked with manufacturer name, service designation, and material designation for safe and proper use.
-
Power Engineers must consult the correct ASME codes (BPVC I for high-pressure plant piping, and B31.1, BPVC IV, and B31.9 for low-pressure plant piping) when designing, repairing, or installing piping systems.
-
Boiler piping is divided into three categories: boiler proper piping, boiler external piping, and nonboiler external piping.
-
Existing piping systems and new installations must follow the correct code for safe and durable piping systems.
-
ASME BPVC I has administrative jurisdiction over boiler external piping, but ASME B31.1 has technical jurisdiction, including rules for steam piping, feedwater piping, blowoff piping, and blowdown piping.
-
Proper identification, installation, and testing of fittings and piping systems are essential for safety and performance.
-
Improperly identified fittings or piping must never be placed in pressure service.
-
Fittings must be made of suitable materials and be of proper strength for the specific application to avoid failure or incompatibility.
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.
Related Documents
Description
Test your understanding of the code reference for boiler fittings according to CSA B51 Boiler, Pressure Vessel, and Pressure Piping Code. This quiz covers the registration and requirements for fittings connected to the pressure side of a boiler, including considerations for service conditions.