Cross Drainage Works Quiz
5 Questions
2 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

How can cross drainage works be avoided?

Cross drainage works can be avoided by changing the alignment of canal waterway or by mixing two or three streams into one and constructing only one cross drainage work to make the structure economical.

What is an aqueduct in the context of cross drainage works?

In the context of cross drainage works, an aqueduct is a structure where the canal bed level is above the drainage bed level, and the canal is constructed above the drainage. A canal trough is constructed for canal water flow.

What is the purpose of cross drainage works?

The purpose of cross drainage works is to prevent the mixing of drain water into canal water when there is a crossing of canal and natural drain.

What is a syphon aqueduct?

<p>A syphon aqueduct is a type of cross drainage work where the canal water is carried over the drainage through a pipe or syphon.</p> Signup and view all the answers

What is the purpose of a level crossing canal inlet and outlet?

<p>The purpose of a level crossing canal inlet and outlet is to facilitate the crossing of canal and natural drain at the same level without any superstructure.</p> Signup and view all the answers

More Like This

River Diversion Headworks Quiz
29 questions
Untertagebauwerke in der Schweiz
37 questions
Introduction to Civil Engineering: Water Management
15 questions
Use Quizgecko on...
Browser
Browser