Criteria for Technically Feasible Domestic PNG Connection

NeatSeaborgium avatar
NeatSeaborgium
·
·
Download

Start Quiz

Study Flashcards

18 Questions

What is the minimum land requirement for a City Gate Station (CGS) as per the PNGRB guidelines?

2000 sq.m

Which of the following should be made available to telecom services, similar to tower installation, as per the URDPFI Guidelines?

Right of Way (RoW) permission

What should the development authorities include in the Development Control Regulations, as per the PNGRB guidelines?

Safety norms prescribed by PNGRB

Where should land for City gas stations be provisioned?

In urban extensions, avoiding congested areas

What should the municipalities and development authorities make provisions for, as per the PNGRB guidelines?

All of the above

What should be integrated with the utility corridor, according to the URDPFI Guidelines?

Telecom services including broadband

Which of the following areas would be considered technically not feasible for a domestic PNG connection?

An area with structurally unstable buildings and narrow lanes

What type of pipeline material is mentioned in the text for domestic PNG connections?

Medium-density polyethylene (MDPE)

What should be ensured for the provision of domestic and trans-country pipelines?

Overall safety, quality, and convenience

What is a requirement mentioned in the text for a technically feasible domestic PNG connection?

Provision for connecting the customer's premises with the service MDPE pipeline

What should be considered when connecting the service pipeline to a customer's building?

Ensuring it does not pose any hindrance or safety hazard

What is NOT mentioned in the text as a requirement for a technically feasible domestic PNG connection?

Availability of a nearby incineration facility

What is one of the basic requirements for artificial recharge?

Availability of non-committed runoff in space and time

What is NOT mentioned as a criterion to be evaluated for planning an artificial recharge scheme?

Evaluation of landfill site suitability for waste disposal

Which of the following is considered a part of hydrological studies for artificial recharge planning?

Rainfall pattern in the area

Which of the following is NOT mentioned as a criterion for identifying areas suitable for artificial recharge?

Areas with high potential for biodegradable waste generation

What is one of the hydrogeological studies recommended for artificial recharge planning?

Identification of suitable hydrogeological environment for artificial recharge

Which of the following is NOT mentioned as a source of surface water supply for artificial recharge?

Leachate from municipal solid waste landfills

Learn about the criteria that determine if an area/locality/building is technically feasible for laying Medium-Density Polythylene (MDPE) pipelines for Domestic PNG Connection. Understand the requirements for accessibility of fire tenders in case of emergencies.

Make Your Own Quizzes and Flashcards

Convert your notes into interactive study material.

Get started for free

More Quizzes Like This

Use Quizgecko on...
Browser
Browser