Questions and Answers

What is the minimum land requirement for a City Gate Station (CGS) as per the PNGRB guidelines?

  • 1000 sq.m
  • 1500 sq.m
  • 2500 sq.m
  • 2000 sq.m (correct)
  • Which of the following should be made available to telecom services, similar to tower installation, as per the URDPFI Guidelines?

  • Building regulation modifications
  • Both b and c
  • Utility corridor
  • Right of Way (RoW) permission (correct)
  • What should the development authorities include in the Development Control Regulations, as per the PNGRB guidelines?

  • Provisions for telecom services
  • Right of Usage (RoU) for city roads
  • Land requirements for CGS
  • Safety norms prescribed by PNGRB (correct)
  • Where should land for City gas stations be provisioned?

    <p>In urban extensions, avoiding congested areas</p> Signup and view all the answers

    What should the municipalities and development authorities make provisions for, as per the PNGRB guidelines?

    <p>All of the above</p> Signup and view all the answers

    What should be integrated with the utility corridor, according to the URDPFI Guidelines?

    <p>Telecom services including broadband</p> Signup and view all the answers

    Which of the following areas would be considered technically not feasible for a domestic PNG connection?

    <p>An area with structurally unstable buildings and narrow lanes</p> Signup and view all the answers

    What type of pipeline material is mentioned in the text for domestic PNG connections?

    <p>Medium-density polyethylene (MDPE)</p> Signup and view all the answers

    What should be ensured for the provision of domestic and trans-country pipelines?

    <p>Overall safety, quality, and convenience</p> Signup and view all the answers

    What is a requirement mentioned in the text for a technically feasible domestic PNG connection?

    <p>Provision for connecting the customer's premises with the service MDPE pipeline</p> Signup and view all the answers

    What should be considered when connecting the service pipeline to a customer's building?

    <p>Ensuring it does not pose any hindrance or safety hazard</p> Signup and view all the answers

    What is NOT mentioned in the text as a requirement for a technically feasible domestic PNG connection?

    <p>Availability of a nearby incineration facility</p> Signup and view all the answers

    What is one of the basic requirements for artificial recharge?

    <p>Availability of non-committed runoff in space and time</p> Signup and view all the answers

    What is NOT mentioned as a criterion to be evaluated for planning an artificial recharge scheme?

    <p>Evaluation of landfill site suitability for waste disposal</p> Signup and view all the answers

    Which of the following is considered a part of hydrological studies for artificial recharge planning?

    <p>Rainfall pattern in the area</p> Signup and view all the answers

    Which of the following is NOT mentioned as a criterion for identifying areas suitable for artificial recharge?

    <p>Areas with high potential for biodegradable waste generation</p> Signup and view all the answers

    What is one of the hydrogeological studies recommended for artificial recharge planning?

    <p>Identification of suitable hydrogeological environment for artificial recharge</p> Signup and view all the answers

    Which of the following is NOT mentioned as a source of surface water supply for artificial recharge?

    <p>Leachate from municipal solid waste landfills</p> Signup and view all the answers