5 Questions
Which test is used to measure the pressure drawdown in a wellbore during a constant flow rate?
Buildup Test
What does a drawdown test measure?
Pressure drawdown in a wellbore
When is a buildup test performed?
After a well has been shut in
What information can be obtained from a drill stem test?
Fluid samples
Which test is used to determine whether or not to complete a well?
Drill Stem Testing
Test your knowledge of core handling and preservation with this quiz. Learn the steps involved in properly marking, wrapping, and transporting core samples for laboratory analysis. Improve your understanding of this important process in the field of geology.
Make Your Own Quizzes and Flashcards
Convert your notes into interactive study material.
Get started for free