Podcast
Questions and Answers
Which test is used to measure the pressure drawdown in a wellbore during a constant flow rate?
Which test is used to measure the pressure drawdown in a wellbore during a constant flow rate?
- Pulse Testing
- Interference Test
- Injection Test
- Buildup Test (correct)
What does a drawdown test measure?
What does a drawdown test measure?
- Reservoir heterogeneities
- Reservoir boundaries
- Reservoir permeability
- Pressure drawdown in a wellbore (correct)
When is a buildup test performed?
When is a buildup test performed?
- During a pressure drawdown test
- After a well has been shut in (correct)
- During a constant flow rate
- Before a well has been shut in
What information can be obtained from a drill stem test?
What information can be obtained from a drill stem test?
Which test is used to determine whether or not to complete a well?
Which test is used to determine whether or not to complete a well?
Flashcards are hidden until you start studying