Which of the following is a key concept in control system engineering?
Which of the following is a key concept in control system engineering?
- Feedback (correct)
- Backlash
- Feedforward
- Sideboard
What is the purpose of a PID controller in control system engineering?
What is the purpose of a PID controller in control system engineering?
- To measure system noise
- To synchronize multiple systems
- To amplify input signals
- To regulate process control systems (correct)
In control system engineering, what does 'stability' refer to?
In control system engineering, what does 'stability' refer to?
- The speed of system response
- The accuracy of sensor measurements
- The maximum achievable system output
- The ability of a system to return to a steady state after a disturbance (correct)
Which of the following is a characteristic of a stable control system?
Which of the following is a characteristic of a stable control system?
What is the primary purpose of a root locus plot in control system analysis?
What is the primary purpose of a root locus plot in control system analysis?
What effect does increasing the derivative term in a PID controller have on the system's response?
What effect does increasing the derivative term in a PID controller have on the system's response?