Construction Management Quiz

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson
Download our mobile app to listen on the go
Get App

Questions and Answers

Which of the following is not considered a Variation Order?

  • Extra work order
  • Resume order (correct)
  • Change order
  • Supplemental agreement

A project may be granted a time extension for delays due to reasons beyond the contractor's control if the affected works are what type of activities?

  • Critical activities (correct)
  • Dummy activities
  • Hammock activities
  • Non-critical activities

If work is 50% completed satisfactorily, what should be the retention rate on progress payments?

  • 15%
  • 5%
  • 20%
  • 10% (correct)

What is the permitted variation from the design thickness of a layer of aggregate base course?

<p>± 20 mm (C)</p> Signup and view all the answers

What is the permitted variation from the design thickness of a layer of aggregate subbase course?

<p>± 30 mm (B)</p> Signup and view all the answers

What is the rate of application of seal coat using cutback asphalt?

<p>1.5-3.0 li./sq.m. (B)</p> Signup and view all the answers

What is the required area of the trial section to assess material suitability for construction?

<p>About 500 sq.m. (B)</p> Signup and view all the answers

What is the accepted proportion mixture of cement for a Portland cement stabilized road mix?

<p>5 to 12 mass percent (A)</p> Signup and view all the answers

Defective works in a project should be reported to the contractor through which method?

<p>Inspection report (A)</p> Signup and view all the answers

How much percentage is typically withheld on general items until final acceptance of a project?

<p>20% (B)</p> Signup and view all the answers

What is the accepted proportion mixture of lime for a Lime stabilized road mix?

<p>4 to 15 mass percent (C)</p> Signup and view all the answers

Which of the following is not considered a construction safety procedure?

<p>Sending workers engaged in clearing without protection (D)</p> Signup and view all the answers

Which of the following is not a cause of delay in project implementation?

<p>Pre-determined rainy month in the area (C)</p> Signup and view all the answers

The bar chart used in project management is commonly referred to as what?

<p>Gantt chart (D)</p> Signup and view all the answers

After 50% completion of work, what is the retention rate imposed if the work is satisfactory?

<p>10% (C)</p> Signup and view all the answers

Which type of activities, as shown in the PERT/CPM diagram, may grant a time extension due to delays beyond the contractor's control?

<p>Critical activities (A)</p> Signup and view all the answers

If the required thickness of item 200 is 300 mm, the material may be spread and compacted in how many layers?

<p>Two (B)</p> Signup and view all the answers

What is the term for a record compiled to contain the data and history of a project?

<p>Log book (D)</p> Signup and view all the answers

In riprapping construction, which element is provided as a water outlet and lateral pressure reliever?

<p>Weep hole (A)</p> Signup and view all the answers

What do you call the process of strengthening an existing pavement by adding thickness?

<p>Overlaying (C)</p> Signup and view all the answers

Concrete mix should not be in place for more than how many minutes from when the ingredients were mixed?

<p>45 (D)</p> Signup and view all the answers

The maximum time allowed from when water is added to concrete mix until it is placed is?

<p>45 mins (C)</p> Signup and view all the answers

Before placing concrete, the base of a roadway should be kept moist for at least how long?

<p>3 hrs (A)</p> Signup and view all the answers

To protect newly poured Portland cement concrete from rain, which material is NOT required?

<p>Plastic water stops (A)</p> Signup and view all the answers

What is the allowable minimum penetration of piles in firm material?

<p>4.0 m (B)</p> Signup and view all the answers

What should the condition of the tack coat be before the next course is applied?

<p>Sticky (A)</p> Signup and view all the answers

Concrete mix not placed within ______________ minutes from the time ingredients were charged should not be used.

<p>90 (C)</p> Signup and view all the answers

What is the minimum allowable atmospheric temperature in the application of Item 305 bituminous material?

<p>5 ºC (C)</p> Signup and view all the answers

Why must the inside face of a pothole be made vertical before patching using asphalt?

<p>To ensure bond between the new mix and old surface (C)</p> Signup and view all the answers

Repainting of a steel bridge is classified as which type of maintenance activity?

<p>Periodic maintenance (B)</p> Signup and view all the answers

What is the process of cutting the branches around a tree on the roadside to encourage straight growth called?

<p>Pruning (B)</p> Signup and view all the answers

What is the minimum required penetration depth for piles in firm material?

<p>75 mm (D)</p> Signup and view all the answers

What is a contractor entitled to claim if a project is started more than 8 months after the bidding?

<p>Price adjustment (B)</p> Signup and view all the answers

Before issuing a certificate of final inspection, which conference should be conducted in the field after a project completion?

<p>Exit conference (A)</p> Signup and view all the answers

In an inspection report, what is the most critical item to include aside from findings?

<p>Recommendation of possible actions to be undertaken (A)</p> Signup and view all the answers

Which of the following data is not typically contained in a logbook?

<p>Survey data (C)</p> Signup and view all the answers

What formula is commonly used for computing price escalation?

<p>Economic formula (D)</p> Signup and view all the answers

Which date serves as the basis for computing contract price escalation in a project awarded through public bidding?

<p>Date of bidding (A)</p> Signup and view all the answers

When computing contract price escalation for a project awarded through simplified bidding, which date is used?

<p>Date of bidding (B)</p> Signup and view all the answers

Which of the following is not considered a flood damage mitigation measure?

<p>Highway drainage (A)</p> Signup and view all the answers

Flashcards are hidden until you start studying

Study Notes

Variation Orders and Extensions

  • Variation Orders include change orders, extra work orders, and supplemental agreements; resume orders are not included.
  • A project may receive a time extension if delays stem from reasons beyond the contractor's control, affecting critical activities.

Retention and Payments

  • Upon satisfactory progress at 50% completion, no extra retention is imposed; a typical retention rate is 5%.
  • General items payment typically withhold up to 20% until final project acceptance.

Material Specifications and Quality Control

  • Permitted variation for aggregate base course thickness is ± 20 mm; subbase course thickness variation is ± 10 mm.
  • Trial section area needed for material and method testing is about 400 sq.m.

Mixture Proportions

  • The acceptable cement mix for Portland cement stabilized road mixes is 4 to 20 mass percent.
  • Lime stabilization for road mixes accepts a lime proportion of 2 to 10 mass percent.

Soil and Base Conditions

  • Sub-grade soil must be well compacted at optimum moisture and maximum dry density for quality control.
  • Concrete procedures dictate base moistening for at least 6 hours before placing concrete.

Project Management and Reporting

  • Defective works are reported to the contractor through an inspection report.
  • The logbook does not include survey data but documents daily activities, weather conditions, and material usage.

Construction Safety and Delays

  • Construction safety procedures involve proper shoring of excavations and guarding openings; logging by equipment operators is essential.
  • Causes of delays include plan revisions and inadequacies in contractor resources; natural factors like predetermined rainy seasons do not count.

Planning Tools and Maintenance

  • Bar charts are synonymous with Gantt charts, vital for project scheduling.
  • Repainting of a steel bridge is categorized as periodic maintenance.

Concrete Handling Regulations

  • Concrete must be mixed and placed within 90 minutes of initial mixing; transport time from addition of water to placement should not exceed 30 minutes.
  • Waterproofing materials for fresh concrete include burlap or plastic sheeting, while metal forms may not be suitable.

Piles, Tack and Temperature Considerations

  • Minimum penetration for piles in firm material is 4.0 meters; tack coat conditions should be sticky before applying the next course.
  • The minimum temperature for bituminous material application is 10 ºC.

Inspections, Reports, and Allowances

  • Post-final inspection, certificates of completion are contingent on conducting an exit conference.
  • Essential items in inspection reports include recommendations for actions rather than team member details.

Price Adjustment and Flood Mitigation

  • Contract price escalation is generally computed from the effectivity date of the contract.
  • Flood damage mitigation strategies encompass reservoir flow reduction and floodplain management, while highway drainage does not qualify as a mitigation measure.