Under which condition is a change order not required?

  • Decrease in work due to deletion of work items (correct)
  • Increase in cost due to construction materials
  • Reclassification of items of works
  • Aggregate cost increase limited to 25% of original cost
  • Which of the following is not classified as a Variation Order?

  • Extra work order (correct)
  • Change order
  • Supplemental agreement
  • Resume order
  • What is the retention rate imposed if work is 50% complete and satisfactory?

  • 5%
  • 20%
  • 10% (correct)
  • 15%
  • What is the permitted variation from the design thickness for an aggregate subbase course?

    <p>± 10 mm</p> Signup and view all the answers

    What is the minimum cement content per cubic meter of class B concrete when one bag weighs 40 kg?

    <p>9 bags</p> Signup and view all the answers

    What is the minimum area required for the trial section to evaluate material suitability and construction method efficiency?

    <p>About 400 sq.m.</p> Signup and view all the answers

    How often can a contractor request progress payment?

    <p>Once a month</p> Signup and view all the answers

    Before asphalt pavement is laid on a granular base, what type of liquid asphalt is typically applied?

    <p>Tack coat</p> Signup and view all the answers

    Which test is primarily used to differentiate clay from silt?

    <p>Hydrometer test</p> Signup and view all the answers

    What is the effective sieve no. on which the Atterberg limit tests are performed?

    <p>200</p> Signup and view all the answers

    Study Notes

    DPWH Accreditation of Contractors'/Consultants' Project Engineer Reviewer Quiz App

    • This is a quiz app for DPWH contractors/consultants' project engineer reviewers.
    • It is a February 2023 edition.
    • Developed by Engr. Jestoni G. Elano, CE, ME II, SO2.

    PE Exam Reference E-Books

    • DGCS Vol. I to 6
    • Accessibility Law (BP 344)
    • Simplified Construction Handbook
    • Blue Book Vol. II, 2013
    • Blue Book Vol. III, 1995
    • Building Cons. Methodology
    • Road Cons. Methodology
    • Bridge Cons. Methodology

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Related Documents

    Description

    Test your knowledge on key concepts in construction management. This quiz covers topics such as change orders, retention rates, material suitability, and testing methods. Answer questions to assess your understanding of essential principles in the field.

    More Like This

    Use Quizgecko on...
    Browser
    Browser