Construction Cost Estimation Components

FascinatingSine avatar
FascinatingSine
·
·
Download

Start Quiz

Study Flashcards

18 Questions

What type of cost estimate takes into account the cost of individual types of process equipment and multiplies it by an 'installation factor'?

Factored estimate

Which cost estimate type is based on historical data and closely relates building costs to floor area?

Floor area estimate

In a function estimate, which of the following examples represents the cost per bed for a hospital?

Cost per bed

How are lump sum costs of trade related in the component system of construction?

Related to gross area covered

What improvement does parameter estimate offer over the floor area estimate?

It uses multiple parameter measures instead of a single one

Which component is not considered in a factored estimate calculation?

Markup cost

What type of estimate breaks down the subject into many items or components, often with detailed specifications?

Detailed estimate

What is a key feature of estimating software that allows it to organize items in a hierarchical structure?

Hierarchical/WBS organization

What type of estimate is often used when there is limited information available about the project?

Factored estimate

What is a key advantage of using building information modeling (BIM) in cost estimation?

Improved accuracy

What is a common method of estimating costs used in construction projects?

CAD and digital takeoff systems

What is a desirable feature of estimating software that allows it to compare costs between different systems or providers?

Cost comparisons

What must cost estimates in construction projects include?

Materials, labor, equipment, and consumables

Which of the following is a key purpose of detailed estimation in construction projects?

To break down each category into small parts

What is the main emphasis when it comes to profitability in the business of design and construction?

Accurate and complete cost estimation

Which method is recommended for handling inexact figures during detailed estimation?

Utilizing the round-up method

What is one important factor to consider when providing allowances in detailed estimation?

Breakage, wastage, or slack

Why is it important to classify the general parts of a project into categories during detailed estimation?

To organize the project components for accurate costing

This quiz covers the different components involved in cost estimation for construction projects, such as labor, materials, tools & equipment, trade contractors, markup, contingency cost, administrative cost, profit, and variations. Understanding these components is crucial for successful project delivery and fair compensation.

Make Your Own Quizzes and Flashcards

Convert your notes into interactive study material.

Get started for free
Use Quizgecko on...
Browser
Browser