CompTIA Network+ N10-008 Certification Exam Update Quiz
10 Questions
1 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What topology is characterized by computers being connected to a central point with their own individual cables or wireless connections?

  • Mesh
  • Ring
  • Bus
  • Star (correct)
  • In the event of an outage, where a company can immediately switch from one datacenter to another, what does this BEST describe?

  • Multipathing
  • Load balancing
  • Data mirroring
  • A warm site (correct)
  • Which document would BEST support ensuring unnecessary modifications to the corporate network are not permitted and version control is maintained?

  • A business continuity plan
  • A change management policy (correct)
  • An incident response plan
  • An acceptable use policy
  • What is MOST likely to generate significant East-West traffic in a datacenter?

    <p>A duplication of a hosted virtual server to another physical server for redundancy</p> Signup and view all the answers

    What should you do if you want to ensure you have the latest product before taking the exam?

    <p>Check the latest product in the member center 2-3 days before the exam</p> Signup and view all the answers

    What will happen if someone shares the product file?

    <p>Free update and account access will be disabled</p> Signup and view all the answers

    What information should you provide if you have questions about the product?

    <p>Exam Number, Version, Page Number, Question Number, and Login Account</p> Signup and view all the answers

    When is the free update available for the product?

    <p>Within one year after purchase</p> Signup and view all the answers

    What does the vendor reserve the right of final explanation for?

    <p>The copyright statement</p> Signup and view all the answers

    How often should you check for the latest product before the exam?

    <p>2-3 days before the exam</p> Signup and view all the answers

    Study Notes

    Network Topology

    • Star topology is characterized by computers being connected to a central point with their own individual cables or wireless connections.

    Disaster Recovery

    • A company can immediately switch from one datacenter to another in the event of an outage, describing a disaster recovery (DR) strategy.

    Change Management

    • A change management document is necessary to ensure that unnecessary modifications to the corporate network are not permitted and version control is maintained.

    Datacenter Traffic

    • East-West traffic in a datacenter is most likely generated by server-to-server communication or storage area network (SAN) traffic.

    Product Updates

    • To ensure you have the latest product before taking the exam, check for updates frequently.
    • Sharing the product file with others can result in loss of software integrity and potential expiration.
    • If you have questions about the product, provide details about your issue or inquiry.

    Product Support

    • The vendor reserves the right of final explanation for any product-related issues or concerns.
    • A free update for the product is available periodically (e.g., quarterly or annually).
    • Check for the latest product updates regularly, ideally every week or two, before taking the exam.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    Test your knowledge of the latest updates for the CompTIA Network+ N10-008 certification exam with this quiz. Stay informed about important product updates and ensure you are prepared for the exam.

    More Like This

    Use Quizgecko on...
    Browser
    Browser