Climate Resilience Rating Approach for Buildings

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What are the initial questions used to rate the climate resilience in buildings?

  • Site conditions, environmental hazards, and disaster recovery strategies
  • Site info, relevant hazards, and maintenance planning
  • Site info, relevant hazards, and adaptive capacity (correct)
  • Site location, relevant hazards, and emergency response plans

What does the CEN TS/17385 method focus on for the condition assessment of immobile constructed assets?

  • Environmental and geographic conditions (correct)
  • Predictive maintenance strategy
  • Performance of building systems
  • Quality of facility management service

Which factor does maintainability depend on according to the lecture?

  • Proactive and predictive maintenance strategy
  • Efficiency of maintenance personnel
  • Cost of maintenance works
  • Stressing use conditions (correct)

What are the key maintainability indicators (KMI) mentioned in the lecture?

<p>Cost, quality, and time (B)</p> Signup and view all the answers

How many steps are included in the maintainability assessment procedure according to the lecture?

<p>8 steps (A)</p> Signup and view all the answers

What is the main focus at the site level in the audit process?

<p>Evaluating the environmental conditions and road network (B)</p> Signup and view all the answers

What is the primary purpose of the Dutch standard NEN 2006 for condition assessment of buildings?

<p>To classify building defects into critical, serious, and minor levels (B)</p> Signup and view all the answers

In the audit process, what are the objects of assessment at the building level?

<p>External surfaces and internal area characteristics (D)</p> Signup and view all the answers

What is the main objective of proactive design in relation to maintainability?

<p>To predict maintenance and facilitate accessibility (C)</p> Signup and view all the answers

Which type of maintenance planning is carried out at predetermined intervals?

<p>Preventive planned maintenance (D)</p> Signup and view all the answers

Flashcards are hidden until you start studying

More Like This

Use Quizgecko on...
Browser
Browser