Podcast
Questions and Answers
Civil engineering services are required for each of five typical phases of a construction project.
Civil engineering services are required for each of five typical phases of a construction project.
False
In the Final Design Phase, preparation of construction drawings and estimated construction cost are not included as part of the services.
In the Final Design Phase, preparation of construction drawings and estimated construction cost are not included as part of the services.
False
The Construction Phase involves providing advice and consultation on matters related to the bidding or negotiating process.
The Construction Phase involves providing advice and consultation on matters related to the bidding or negotiating process.
False
Special services in a construction project can only be provided by the client.
Special services in a construction project can only be provided by the client.
Signup and view all the answers
The Study and Report Phase includes the preparation of conceptual design and opinions of probable construction cost.
The Study and Report Phase includes the preparation of conceptual design and opinions of probable construction cost.
Signup and view all the answers
The Operation Phase includes assistance to the client in the start-up and operation of the project but excludes periodic inspections.
The Operation Phase includes assistance to the client in the start-up and operation of the project but excludes periodic inspections.
Signup and view all the answers
During the Preliminary Design Phase, the Civil Engineer may need to consult with governmental authorities to approve the design of the project.
During the Preliminary Design Phase, the Civil Engineer may need to consult with governmental authorities to approve the design of the project.
Signup and view all the answers
The Civil Engineer does not need to assist the client in obtaining any additional data or services during the project phases.
The Civil Engineer does not need to assist the client in obtaining any additional data or services during the project phases.
Signup and view all the answers
The client's requirements for the project are not important in the services provided by the Civil Engineer during the phases.
The client's requirements for the project are not important in the services provided by the Civil Engineer during the phases.
Signup and view all the answers
The Preliminary Design Phase involves preparing final design criteria, preliminary drawings, outline specifications, and written descriptions of the project.
The Preliminary Design Phase involves preparing final design criteria, preliminary drawings, outline specifications, and written descriptions of the project.
Signup and view all the answers
The Civil Engineer does not need to present alternative solutions to the client during any phase of the project.
The Civil Engineer does not need to present alternative solutions to the client during any phase of the project.
Signup and view all the answers
In the Preliminary Design Phase, consulting with the client and reviewing preliminary reports are not considered part of the services provided.
In the Preliminary Design Phase, consulting with the client and reviewing preliminary reports are not considered part of the services provided.
Signup and view all the answers