The presence of excessive amount of sulphuric and alkali materials in water used in reinforced concrete construction will result in ________?
The presence of excessive amount of sulphuric and alkali materials in water used in reinforced concrete construction will result in ________?
Corrosion of steel reinforcement
In patching works using cold mix (Emulsified Asphalt SS-1 Aggregate Mix), what color of the mix indicates that it is ready for application?
In patching works using cold mix (Emulsified Asphalt SS-1 Aggregate Mix), what color of the mix indicates that it is ready for application?
What do you call the process of cutting the branches around a tree on the roadside to make them denser and grow straight?
What do you call the process of cutting the branches around a tree on the roadside to make them denser and grow straight?
Pruning
Match the following soil size distribution analysis methods:
Match the following soil size distribution analysis methods:
Signup and view all the answers
What is the amount withheld by the agency equivalent to 10% of the amount due to a contractor?
What is the amount withheld by the agency equivalent to 10% of the amount due to a contractor?
Signup and view all the answers
Match the soil classification with their characteristics:
Match the soil classification with their characteristics:
Signup and view all the answers
Unconfined compressive strength test is usually performed on ______ soils.
Unconfined compressive strength test is usually performed on ______ soils.
Signup and view all the answers
Which test determines the pile bearing capacity by loading one or more piles and measuring settlement under load?
Which test determines the pile bearing capacity by loading one or more piles and measuring settlement under load?
Signup and view all the answers
Higher value of Plasticity Index indicates stronger soil performance.
Higher value of Plasticity Index indicates stronger soil performance.
Signup and view all the answers
What is the minimum percent of A-6 group classification of soil?
What is the minimum percent of A-6 group classification of soil?
Signup and view all the answers
Two pronounced seasons, dry from November to April, wet during the rest of the year
Two pronounced seasons, dry from November to April, wet during the rest of the year
Signup and view all the answers
The catch up schedule reflects:
The catch up schedule reflects:
Signup and view all the answers
The length of the stream is assumed one diagonal of this rectangle plus one-half of the shorter side of the rectangle, which is the:
The length of the stream is assumed one diagonal of this rectangle plus one-half of the shorter side of the rectangle, which is the:
Signup and view all the answers
The maximum length of ascending gradient which a loaded truck can operate without undue reduction in speed is called:
The maximum length of ascending gradient which a loaded truck can operate without undue reduction in speed is called:
Signup and view all the answers
Proper storage of cement must satisfy the following requirement with the exception of:
Proper storage of cement must satisfy the following requirement with the exception of:
Signup and view all the answers
Dams are hydraulic structures constructed to:
Dams are hydraulic structures constructed to:
Signup and view all the answers
The depth of corrugation and roughened finish by brooming on the surface of a newly set concrete pavement should not be more than:
The depth of corrugation and roughened finish by brooming on the surface of a newly set concrete pavement should not be more than:
Signup and view all the answers
Which of the following complements as a regulating flood control structure:
Which of the following complements as a regulating flood control structure:
Signup and view all the answers
What kind of reinforcing steel is used for tie bars of a PCCP?
What kind of reinforcing steel is used for tie bars of a PCCP?
Signup and view all the answers
When a contract is mutually terminated, the contractor is:
When a contract is mutually terminated, the contractor is:
Signup and view all the answers
What is item 505 in the DPWH Standard Specifications?
What is item 505 in the DPWH Standard Specifications?
Signup and view all the answers
Unless other sizes are shown in the plans, shoes for stone masonry should have a minimum thickness of:
Unless other sizes are shown in the plans, shoes for stone masonry should have a minimum thickness of:
Signup and view all the answers
How many core samples should be taken for thickness determination of a 2-kilometer, 2-lane concrete road pavement?
How many core samples should be taken for thickness determination of a 2-kilometer, 2-lane concrete road pavement?
Signup and view all the answers
To avoid hitting a waterfall, realignment of the route must be done. Borings should be made on the proposed alignment at an average interval of:
To avoid hitting a waterfall, realignment of the route must be done. Borings should be made on the proposed alignment at an average interval of:
Signup and view all the answers
Which of the following is not a field test in road construction?
Which of the following is not a field test in road construction?
Signup and view all the answers
Per program of work, the estimated volume of item 201 materials is 7,500 cubic meter. How many grading and plasticity test are required based on the DPWH minimum testing requirement?
Per program of work, the estimated volume of item 201 materials is 7,500 cubic meter. How many grading and plasticity test are required based on the DPWH minimum testing requirement?
Signup and view all the answers
If the required thickness of Item 200 is 300 mm, the material may be spread and compacted in
If the required thickness of Item 200 is 300 mm, the material may be spread and compacted in
Signup and view all the answers
As practically possible, concrete mix should not be placed where this can be subject to manual dropping by not more than [ ] and where no other special tools and means are used.
As practically possible, concrete mix should not be placed where this can be subject to manual dropping by not more than [ ] and where no other special tools and means are used.
Signup and view all the answers
What is the required minimum weight of the gravity hammer used in pile driving?
What is the required minimum weight of the gravity hammer used in pile driving?
Signup and view all the answers
When the value of G.I. is negative, what will be the soil performance?
When the value of G.I. is negative, what will be the soil performance?
Signup and view all the answers
The weight of Sandy soil for Hydrometer Analysis is [ ].
The weight of Sandy soil for Hydrometer Analysis is [ ].
Signup and view all the answers
What is a type of soil in which most of the soil grains are of the same size?
What is a type of soil in which most of the soil grains are of the same size?
Signup and view all the answers
Percent passing loose for coarse aggregates when tested for clay lump is [ ].
Percent passing loose for coarse aggregates when tested for clay lump is [ ].
Signup and view all the answers
The mass percent passing loose for coarse aggregates when tested soft fragment is [ ].
The mass percent passing loose for coarse aggregates when tested soft fragment is [ ].
Signup and view all the answers
If slag is used, the density of coarse aggregate is [ ].
If slag is used, the density of coarse aggregate is [ ].
Signup and view all the answers
Mass percent loose for fine aggregates when tested in Clay lumps is [ ].
Mass percent loose for fine aggregates when tested in Clay lumps is [ ].
Signup and view all the answers
What is the type of cement which shall be transferred to an elevated, air tight, and weatherproof bins storage?
What is the type of cement which shall be transferred to an elevated, air tight, and weatherproof bins storage?
Signup and view all the answers
What is the strength for load-bearing hollow blocks?
What is the strength for load-bearing hollow blocks?
Signup and view all the answers
When mixed at the site or in a central mixing plant, the mixing time shall not be less than
When mixed at the site or in a central mixing plant, the mixing time shall not be less than
Signup and view all the answers
The batches shall be so charged into the drum that a portion of the mixing water shall enter in advance of the cement and aggregate. The flow of water shall be uniform, and all water should be in the drum by the end of the [ ] of the mixing period.
The batches shall be so charged into the drum that a portion of the mixing water shall enter in advance of the cement and aggregate. The flow of water shall be uniform, and all water should be in the drum by the end of the [ ] of the mixing period.
Signup and view all the answers
The time elapsed from the time water is added to the mix until the concrete is deposited at the site shall not exceed [ ] when concrete is hauled in the truck.
The time elapsed from the time water is added to the mix until the concrete is deposited at the site shall not exceed [ ] when concrete is hauled in the truck.
Signup and view all the answers
The minimum percent compaction for embankment is [ ].
The minimum percent compaction for embankment is [ ].
Signup and view all the answers
The minimum percent compaction for base and Sub-base of the road is [ ].
The minimum percent compaction for base and Sub-base of the road is [ ].
Signup and view all the answers
The CBR value of aggregate base course is not less than ____ %.
The CBR value of aggregate base course is not less than ____ %.
Signup and view all the answers
The CBR value of aggregate subbase course is not less than ____ %.
The CBR value of aggregate subbase course is not less than ____ %.
Signup and view all the answers
The minimum compressive strength for Class A concrete is 20.7 Mpa. How about Class C?
The minimum compressive strength for Class A concrete is 20.7 Mpa. How about Class C?
Signup and view all the answers
If sea water is used in a concrete mix, what will be the effect on the hardened concrete pavement?
If sea water is used in a concrete mix, what will be the effect on the hardened concrete pavement?
Signup and view all the answers
Which provision is not part of the job mix formula?
Which provision is not part of the job mix formula?
Signup and view all the answers
Scaling of newly constructed concrete pavement is an evidence of inadequate quality control mainly due to high
Scaling of newly constructed concrete pavement is an evidence of inadequate quality control mainly due to high
Signup and view all the answers
The grade designation of a reinforcing steel bars is also its
The grade designation of a reinforcing steel bars is also its
Signup and view all the answers
Which of the following is not an engineering property of granular soils?
Which of the following is not an engineering property of granular soils?
Signup and view all the answers
Which of the following is an engineering property of fine grained soil?
Which of the following is an engineering property of fine grained soil?
Signup and view all the answers
The dividing size between coarse and fine aggregates used in asphalting is
The dividing size between coarse and fine aggregates used in asphalting is
Signup and view all the answers
The objective of designing the asphalt mixture is determination of
The objective of designing the asphalt mixture is determination of
Signup and view all the answers
The sample of reinforcing steel bars for every 10,000 kgs shall be
The sample of reinforcing steel bars for every 10,000 kgs shall be
Signup and view all the answers
Given: Specific gravity = 2.305 Wet compressive strength = 1000 kpa Dry compressive strength = 1400 kpa. What is the percentage?
Given: Specific gravity = 2.305 Wet compressive strength = 1000 kpa Dry compressive strength = 1400 kpa. What is the percentage?
Signup and view all the answers
For any proposed bridge site, the topographic and river surveys should be extended from the centerline of the bridge at least
For any proposed bridge site, the topographic and river surveys should be extended from the centerline of the bridge at least
Signup and view all the answers
Study Notes
Bridge Construction and Materials
- Topographic and river surveys for a proposed bridge site should be extended from the centerline of the bridge at least 300m upstream and downstream.
- The simplest type of superstructure of a concrete bridge with a limited span of 8 meters is a reinforced concrete slab.
- Types of caisson foundations include pneumatic, box, and open caisson.
Contract and Project Management
- A contract will be entitled to contract price escalation if the allowable variance from the original unit price is more than 5%.
- The government may rescind the contract work if there is undue delay attributable solely to the contractor.
- A project with delays due to reasons beyond the control of the contractor may be granted a time extension if the affected works are critical activities.
Road Construction and Materials
- The permitted variation from the design thickness of a layer of aggregate base course is ± 10 mm.
- The permitted variation from the design thickness of a layer of aggregate subbase course is ± 20 mm.
- The required area of the trial section needed to check the suitability of the materials and efficiency of the equipment and construction method is about 500 sq.m.
Soil and Aggregate
- The accepted proportion mixture of cement to be added to the soil aggregate (dry soil) in a Portland cement stabilized road mix base course is 4 to 20 mass percent.
- The accepted proportion mixture of lime to be added to the soil aggregate (dry soil), in a Lime stabilized road mix base course is 2 to 10 mass percent.
Construction Safety
- The side of deep excavations must be properly shored.
- All openings above ground level must be guarded.
Concrete and Asphalt
- The minimum cement content (40 kg/bag) per cubic meter of class B concrete is 9 bags.
- The minimum testing requirement of concrete for item 405 is the compressive strength test on concrete cylinder samples consisting of a set of 3 concrete cylinder samples to represent not more than 100 m³ of concrete.
- The process of maintaining sufficient moisture and favourable temperature in concrete is called curing.
Engineering and Design
- The single vertical datum to which elevation for all infrastructure projects should be referred to is mean sea level.
- The minimum field density for embankment materials is 95%.
Project Implementation and Inspection
- Defective works in a project should be brought to the attention of the contractor by the Project Inspector through a logbook entry.
- The bar chart is also called a Gantt chart.
- Who assists the Project Engineer in the overall direction and supervision of field operations is the Resident Engineer.
Miscellaneous
- The rate of application of seal coat using cutback asphalt is 1.5-3.0 li./sq.m.
- The Atterberg limit tests are performed on the soil fraction passing sieve no. 40.
- The process of maintaining sufficient moisture and favourable temperature in concrete is called curing.### Emulsified Asphalt
- The rate of application of emulsified asphalt used as a tack coat should be within the range of 0.2-0.5 l/m² or 0.2-0.7 l/m².
Camber on Gravel Roads
- Camber on gravel roads is provided to establish a smooth riding surface and prevent water from stagnating on the carriageway.
Sub-grade Soil Compaction
- Sub-grade soil is well compacted under the controlled condition of optimum moisture content and maximum dry density.
Asphalt Pavement and Surface Treatment
- Before an asphalt pavement or asphalt surface treatment is placed on a granular base, a tack coat is applied.
Bearings for Bridges
- Bearings for bridges are designed to provide free movement of girders, and expansion joints, rockers, sliding plates, and rollers are used to allow such movement.
Work Reports
- The resident engineer prepares daily reports on work accomplishments for review by the project engineer.
Field Tests
- The following are field tests in road construction: density test, core boring test, California bearing ratio (CBR) test, and dynamic cone penetrometer test.
Concrete Pavement
- The flexural strength of concrete is considered satisfactory when the average strength of all sets of 3 consecutive strength test results equal or exceed the specified strength and when no individual strength test result is deficient by more than 15% of 550 psi.
Vegetation Control
- The remaining height of grasses and shrubs after maintenance work should be left uncut at 50mm, 100mm, or 200mm.
Concrete Mix
- Concrete mix should be kept continuously wet by the application of water for a minimum period of 28 days after it has been placed.
Pile Driving
- The minimum weight of the gravity hammer used in pile driving is 1500 kg, and the maximum allowable variation at the butt end of a pile in any direction from its location shown in the approved plans is 75 mm.
Road Maintenance
- The equivalent physical measurement used in the determination of the cost of maintenance of our national roads and bridges and all its facilities is known as the lane kilometre.
Bridge Foundation
- The simplest type of superstructure of a concrete bridge with a limited span of 8 meters is a reinforced concrete slab.
Highway Design
- The most common hourly volume count used for roadway design is the 30th highest hourly volume.
Caisson Foundation
- A pneumatic foundation, box caisson, open caisson, and hydraulic caisson are types of caisson foundation.
Roadway Design
- The maximum value of impact applied to the superstructure of a bridge should be 15.24/(L+38), where L is the portion of the span loaded for maximum.
Building Frames
- Lateral forces on building frames can be analyzed by approximate analytical methods, including the moment-distribution method, portal method, and factor method.
Project Inspection
- After the final inspection of a reported 100% accomplished project, before a certificate of final inspection is issued, an emergency conference, exit conference, or pre-construction conference should be conducted in the field.
Logbook
- A logbook contains data on activities done during the day, materials delivered and used for the day, and the day's weather condition.
Price Escalation
- The formula used in computing price escalation is the no-loss, no-gain formula, and the computation of contract price escalation is based on the notice to proceed.
Flood Damage Mitigation
- Reduction of peck flow by reservoirs, confinement of the flow by levees, floodwalls, and flood plain management are flood damage mitigation measures.
Cross Drainage
- Provision of cross drainage is necessary, and culverts, bridges, and dips are included in cross drainage.
Roadway Foundation
- The most appropriate filling material if you encounter unsuitable roadway foundation is fine aggregates, coarse aggregates, broken concrete, or granular materials.
Concrete Strengthening
- The strengthening of an old existing asphalt or concrete pavement by providing additional adequate thickness over it is called overlaying.
Bridge Construction
- The minimum length requirement for the longitudinal reinforcement of the piles that should be embedded in the bridge structure is 30 times the diameter of main reinforcing deformed bars.
Roadside Trees
- The process of cutting the branches around a tree on the roadside to make them denser and grow straight is called pruning.
Steel Deck
- Steel jack arches, open panel, and stiffened steel are categorized as types of steel deck used on bridges.
Pile Driving
- Driving heads of piles are provided to ensure lateral support to the pile and provide a driving surface normal to the pile.
Dam Structure
- Impervious fill, random fill, and outlet protection works are components of a dam structure.
Economic Evaluation
- The determination of flood discharges, determination of estimated amount of damage, and subsurface investigation are components of an economic evaluation of flood control projects.
Soil Testing
- The particle size distribution of coarse-grained soil is determined by sieve analysis.
Reinforcing Steel Bars
- For testing reinforcing steel bars, the sample for every 10 tons should be 1.0 meter long.
Asphalt Mix
- Under Item 310, the asphalt content of bituminous mix on the basis of total dry aggregate should be between 5% to 8%.
Concrete Pavement Protection
- To protect Portland cement concrete pavement against rain before it has sufficiently hardened, the contractor should be required to have at all times any of the following materials, except for metal form or wood planks.### Materials and Construction
- Burlap or cotton mats are used for concrete pavement
- Plastic sheeting material and plastic water stops are used in construction
- Minimum flexural strength requirement of concrete for Portland Cement Concrete Pavement is 500 psi
Soil Classification
- Soil classification is determined by Atterberg limits test, Sieve analysis test, Hydrometer test, and combinations of these tests
Asphalt Overlay
- Reflection cracking in asphalt overlay can be corrected by applying a seal coat, additional bituminous mix, or redoing the construction
- Criteria for recommending asphalt pavement include well-maintained drainage facilities, non-typhoon belt area, and stable base course
Bank and River Protection
- Types of bank protection structures include drainage ditch, retaining wall, and lateral works
- Coastal protection works, river protection works, and slope protection works are used to protect land areas
Bridge Construction
- Simplest type of superstructure of a concrete bridge with a limited span of 8 meters is a reinforced concrete slab
- Types of caisson foundations include pneumatic foundation, box caisson, open caisson, and hydraulic caisson
- Underpinning methods include earth-filled wood cofferdaming, water diversion, and use of steel sheet piles
Measurement and Testing
- Measurement of concrete materials for concrete structures is by volume
- Catch-up schedule reflects the accomplishments-duration relationship
- Core samples are taken for thickness determination of concrete pavement
Road Design and Construction
- Maximum length of ascending gradient for a loaded truck is called the critical length of grade for design
- Storage of cement at the job site must satisfy certain requirements, including elevated warehouse location
- Depth of corrugation and roughened finish by brooming on the surface of a newly set concrete pavement should not be more than 6.0 mm
Project Management
- Item 505 in the DPWH Standard Specifications refers to structural concrete
- Certificate of quality control and assurance attests that materials incorporated into the project works correspond to the quantity accomplished and conform to specifications
Water Flow and Culverts
- Velocity-area method is used to determine stream discharge
- Apparatus used to determine consistency of liquid asphalt is a viscometer
- Culvert flow under entrance control is synonymous with flow under inlet control
Foundation Design
- Allowed load or bearing capacity is obtained by reducing the ultimate bearing capacity by a factor of safety of 2.0
- Flexural stress in the extreme fiber stress in compression, fc, for service load design of bridges is 0.40 f'c
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.
Related Documents
Description
This quiz tests your knowledge of various civil engineering concepts, including concrete construction, road maintenance, and soil analysis. It covers topics related to the use of materials in construction and the maintenance of infrastructure.