EASY What are the two main parts of an internal inspection?

  • Waterside and fireside (correct)
  • Mechanical and chemical
  • Visual and auditory
  • Hydrostatic and chemical
  • Before starting the waterside inspection, what must be done to the boiler?

  • Cleaned and lubricated
  • Filleted and polished
  • Shut down, isolated, and locked out (correct)
  • Turned on and inspected
  • What is examined during the waterside inspection?

  • Boiler drums and superheaters only
  • Boiler drums, drum internals, and waterwalls
  • Only the economizer and superheaters
  • All of the above and more (correct)
  • Why are pressure parts cleaned internally?

    <p>To provide a clean metal surface for further inspection</p> Signup and view all the answers

    What is analyzed in a detailed inspection report?

    <p>Both deposit thickness and composition</p> Signup and view all the answers

    During the waterside inspection, what is the inspector looking for?

    <p>Signs of corrosion, pitting, and cracking</p> Signup and view all the answers

    What must be removed to allow inspection for scale or other deposits?

    <p>The plugs in the water column, feeder, and low water cut-off connection piping connections</p> Signup and view all the answers

    What may be done after the waterside inspection is completed?

    <p>The boiler is closed up and a hydrostatic test is carried out</p> Signup and view all the answers

    Why would an inspector request the removal of refractory or insulation during a fireside inspection?

    <p>To inspect tube or drum surfaces</p> Signup and view all the answers

    What is the purpose of a hydrostatic test on a boiler?

    <p>To find small leaks or cracks in the boiler</p> Signup and view all the answers

    What should the temperature of the water be during a hydrostatic test?

    <p>Between 20°C and 50°C</p> Signup and view all the answers

    Why must all air be vented from the boiler during a hydrostatic test?

    <p>To prevent the air from being compressed and causing a vessel failure</p> Signup and view all the answers

    What is the purpose of pressurizing the boiler during a hydrostatic test?

    <p>To test the boiler's strength and detect leaks</p> Signup and view all the answers

    How long must the pressure be held during a hydrostatic test?

    <p>Until the inspector completes the inspection</p> Signup and view all the answers

    What must be done with the safety valve during a hydrostatic test?

    <p>It must be removed or blanked off</p> Signup and view all the answers

    Why are the gauge glass connections closed during a hydrostatic test?

    <p>To prevent water from leaking out</p> Signup and view all the answers

    What should be done after the hydrostatic test is complete?

    <p>Crack open a drain to slowly bleed off the pressure</p> Signup and view all the answers

    What is the purpose of the Power Engineer during a fireside inspection?

    <p>To assist the inspector</p> Signup and view all the answers

    MEDIUM During a fireside inspection, what is the primary reason for removing sections of refractory or insulation?

    <p>To inspect tube or drum surfaces</p> Signup and view all the answers

    What is checked during a fireside inspection?

    <p>The fireside surfaces for bulges and blisters, and the ends of firetubes for signs of leakage</p> Signup and view all the answers

    What is the primary purpose of a hydrostatic test on a boiler?

    <p>To check the tightness of the pressurized parts of a boiler</p> Signup and view all the answers

    What should be closed during a hydrostatic test?

    <p>All valves, except the vent valve and feedwater supply valve</p> Signup and view all the answers

    What is the recommended temperature range for the water during a hydrostatic test?

    <p>Between 20°C and 50°C</p> Signup and view all the answers

    Why must all air be vented from the boiler during a hydrostatic test?

    <p>To prevent compressed air from causing vessel failure</p> Signup and view all the answers

    What is the purpose of pressurizing the boiler during a hydrostatic test?

    <p>To check the tightness of the pressurized parts</p> Signup and view all the answers

    What should be done with the safety valve during a hydrostatic test?

    <p>It should be removed or blanked off</p> Signup and view all the answers

    What should be done after the hydrostatic test is complete?

    <p>The pressure should be slowly bled off, and then the drains should be closed</p> Signup and view all the answers

    During a fireside inspection, what is the role of the Power Engineer?

    <p>To assist the inspector and point out defects in the associated plant equipment</p> Signup and view all the answers

    What is the primary purpose of removing deposits from pressure parts during a waterside inspection?

    <p>To provide a clean metal surface for further inspection</p> Signup and view all the answers

    What is the significance of analyzing the deposit composition in a detailed inspection report?

    <p>It identifies the type of scale or deposit</p> Signup and view all the answers

    Why is it essential to check stays during a waterside inspection?

    <p>To inspect for looseness and cracking at the fastened ends</p> Signup and view all the answers

    What is the purpose of opening pressure control lines during a waterside inspection?

    <p>To inspect for scale or other deposits</p> Signup and view all the answers

    What is the significance of inspecting drum welds during a waterside inspection?

    <p>To inspect for any signs of corrosion or cracking</p> Signup and view all the answers

    What should be done with pigtails during a waterside inspection?

    <p>They should be made available for inspection</p> Signup and view all the answers

    Why is it important to inspect manhole and handhole openings during a waterside inspection?

    <p>To inspect for signs of corrosion or pitting</p> Signup and view all the answers

    What is the purpose of inspecting drum connections during a waterside inspection?

    <p>To inspect for signs of corrosion or pitting</p> Signup and view all the answers

    HARD What is the primary reason for cleaning pressure parts internally during a waterside inspection?

    <p>To provide a clean metal surface for further inspection</p> Signup and view all the answers

    What is the significance of analyzing deposit composition in a detailed inspection report?

    <p>To understand the impact on heat transfer</p> Signup and view all the answers

    Why is it essential to inspect drum welds during a waterside inspection?

    <p>To ensure the drum's structural integrity</p> Signup and view all the answers

    What is the purpose of removing plugs in the water column, feeder, and low water cut-off connection piping during a waterside inspection?

    <p>To inspect for scale or other deposits</p> Signup and view all the answers

    Why is it important to inspect stays during a waterside inspection?

    <p>To check for looseness and cracking</p> Signup and view all the answers

    What is the purpose of opening pressure control lines during a waterside inspection?

    <p>To permit inspection of connected components</p> Signup and view all the answers

    Why is it essential to inspect manhole and handhole openings during a waterside inspection?

    <p>To check for corrosion and pitting</p> Signup and view all the answers

    What is the purpose of inspecting drum connections during a waterside inspection?

    <p>To check for signs of corrosion</p> Signup and view all the answers

    What is the primary purpose of inspecting the tubesheet ligaments during a fireside inspection?

    <p>To examine for cracking and deterioration</p> Signup and view all the answers

    What is the recommended procedure for venting air from the boiler during a hydrostatic test?

    <p>Make sure all air is vented from the highest points of the boiler as it is being filled</p> Signup and view all the answers

    What is the primary reason for removing or blocking off certain controls during a hydrostatic test?

    <p>To prevent damage from excessive pressure</p> Signup and view all the answers

    What is the purpose of filling the boiler with water between 20°C and 50°C during a hydrostatic test?

    <p>To prevent brittle fracture and burn hazards</p> Signup and view all the answers

    What is the primary responsibility of the Power Engineer during a fireside inspection?

    <p>To assist the inspector and point out any defects known to exist</p> Signup and view all the answers

    What is the significance of inspecting the ends of firetubes during a fireside inspection?

    <p>To check for signs of leakage and erosion</p> Signup and view all the answers

    What is the primary purpose of holding the pressure at 1 ½ times the MAWP during a hydrostatic test?

    <p>To detect any small leaks or hairline cracks</p> Signup and view all the answers

    What is the recommended procedure for releasing the pressure after a hydrostatic test?

    <p>Crack open a drain and allow the pressure to slowly bleed off</p> Signup and view all the answers

    What is the primary purpose of inspecting the refractory and brickwork of the burners during a fireside inspection?

    <p>To inspect for deterioration and damage</p> Signup and view all the answers

    What is the significance of the ASME Boiler and Pressure Vessel Code, Section VII, during a hydrostatic test?

    <p>It provides detailed requirements for the care of power boilers</p> Signup and view all the answers

    Study Notes

    Internal Inspection

    • Consists of a waterside inspection and a fireside inspection

    Waterside Inspection

    • Examines boiler drums, drum internals, tube connections, waterwalls, superheaters, economizer, and fittings
    • Pressure parts are examined for deposits and scale and may be cleaned internally using mechanical or chemical methods
    • A detailed inspection report may be required, including measurement of deposit thickness and lab analysis
    • Inspector looks for signs of corrosion, pitting, and cracking of metal surfaces
    • Stays are checked for looseness and cracking at the fastened ends
    • Particular attention is paid to manhole and handhole openings and drum connections

    Fireside Inspection

    • May require removal of refractory or insulation to facilitate inspection of tube or drum surfaces
    • Fireside surfaces are examined for bulges and blisters, indicating overheating
    • Ends of firetubes are checked for signs of leakage, and tubesheet ligaments for cracking
    • Tubes adjacent to soot blowers are examined for signs of erosion due to direct steam impingement
    • Refractory and brickwork of burners, baffles, and furnace walls are checked for deterioration

    Hydrostatic Test

    • Enables inspector to check tightness of pressurized parts of a boiler and find small leaks
    • Detailed requirements for hydrostatic tests are described in ASME Boiler and Pressure Vessel Code, Section VII, and National Board Inspection Code
    • Procedures for heating boilers and power boilers differ

    Power Boiler Procedure for Hydrostatic Test

    • Close manholes and handholes, ensuring no debris or tools are left in drums
    • Close all valves, except vent valve and feedwater supply valve, and gauge glass connections
    • Remove or block off any control that cannot withstand hydrostatic test pressure
    • Fill boiler with water between 20°C and 50°C, venting all air from highest points
    • Pressurize boiler slowly to 1 ½ times MAWP, holding pressure for inspection
    • Visually inspect all accessible pressurized parts for signs of leakage, and observe pressure gauge for drops in pressure
    • After test, crack open a drain and allow pressure to slowly bleed off, closing all drains unless intending to drain boiler further

    Internal Inspection

    • Consists of a waterside inspection and a fireside inspection

    Waterside Inspection

    • Examines boiler drums, drum internals, tube connections, waterwalls, superheaters, economizer, and fittings
    • Pressure parts are examined for deposits and scale and may be cleaned internally using mechanical or chemical methods
    • A detailed inspection report may be required, including measurement of deposit thickness and lab analysis
    • Inspector looks for signs of corrosion, pitting, and cracking of metal surfaces
    • Stays are checked for looseness and cracking at the fastened ends
    • Particular attention is paid to manhole and handhole openings and drum connections

    Fireside Inspection

    • May require removal of refractory or insulation to facilitate inspection of tube or drum surfaces
    • Fireside surfaces are examined for bulges and blisters, indicating overheating
    • Ends of firetubes are checked for signs of leakage, and tubesheet ligaments for cracking
    • Tubes adjacent to soot blowers are examined for signs of erosion due to direct steam impingement
    • Refractory and brickwork of burners, baffles, and furnace walls are checked for deterioration

    Hydrostatic Test

    • Enables inspector to check tightness of pressurized parts of a boiler and find small leaks
    • Detailed requirements for hydrostatic tests are described in ASME Boiler and Pressure Vessel Code, Section VII, and National Board Inspection Code
    • Procedures for heating boilers and power boilers differ

    Power Boiler Procedure for Hydrostatic Test

    • Close manholes and handholes, ensuring no debris or tools are left in drums
    • Close all valves, except vent valve and feedwater supply valve, and gauge glass connections
    • Remove or block off any control that cannot withstand hydrostatic test pressure
    • Fill boiler with water between 20°C and 50°C, venting all air from highest points
    • Pressurize boiler slowly to 1 ½ times MAWP, holding pressure for inspection
    • Visually inspect all accessible pressurized parts for signs of leakage, and observe pressure gauge for drops in pressure
    • After test, crack open a drain and allow pressure to slowly bleed off, closing all drains unless intending to drain boiler further

    Internal Inspection

    • Consists of a waterside inspection and a fireside inspection

    Waterside Inspection

    • Examines boiler drums, drum internals, tube connections, waterwalls, superheaters, economizer, and fittings
    • Pressure parts are examined for deposits and scale and may be cleaned internally using mechanical or chemical methods
    • A detailed inspection report may be required, including measurement of deposit thickness and lab analysis
    • Inspector looks for signs of corrosion, pitting, and cracking of metal surfaces
    • Stays are checked for looseness and cracking at the fastened ends
    • Particular attention is paid to manhole and handhole openings and drum connections

    Fireside Inspection

    • May require removal of refractory or insulation to facilitate inspection of tube or drum surfaces
    • Fireside surfaces are examined for bulges and blisters, indicating overheating
    • Ends of firetubes are checked for signs of leakage, and tubesheet ligaments for cracking
    • Tubes adjacent to soot blowers are examined for signs of erosion due to direct steam impingement
    • Refractory and brickwork of burners, baffles, and furnace walls are checked for deterioration

    Hydrostatic Test

    • Enables inspector to check tightness of pressurized parts of a boiler and find small leaks
    • Detailed requirements for hydrostatic tests are described in ASME Boiler and Pressure Vessel Code, Section VII, and National Board Inspection Code
    • Procedures for heating boilers and power boilers differ

    Power Boiler Procedure for Hydrostatic Test

    • Close manholes and handholes, ensuring no debris or tools are left in drums
    • Close all valves, except vent valve and feedwater supply valve, and gauge glass connections
    • Remove or block off any control that cannot withstand hydrostatic test pressure
    • Fill boiler with water between 20°C and 50°C, venting all air from highest points
    • Pressurize boiler slowly to 1 ½ times MAWP, holding pressure for inspection
    • Visually inspect all accessible pressurized parts for signs of leakage, and observe pressure gauge for drops in pressure
    • After test, crack open a drain and allow pressure to slowly bleed off, closing all drains unless intending to drain boiler further

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    This quiz covers the procedures and components involved in internal boiler inspections, including waterside and fireside inspections, and the cleaning of pressure parts.