Battery Chargers and their Functioning Principles
10 Questions
1 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the purpose of the master/slave selector switch 'SW8'?

  • To monitor the incoming voltage
  • To control the output of the bridge
  • To switch between master and slave charger (correct)
  • To isolate the charger in case of any fault

What is the purpose of the step-down transformer 'TX1'?

  • To isolate the charger in case of any fault
  • To monitor the incoming voltage
  • To convert the input voltage to a lower voltage (correct)
  • To control the output of the bridge

What is the input voltage for the charger?

  • 415V three phase (correct)
  • 220V single phase
  • 240V three phase
  • 480V single phase

What happens if the master charger fails?

<p>The slave charger takes over automatically (D)</p> Signup and view all the answers

Which city is the capital of the Indian state of Uttar Pradesh?

<p>Lucknow (A)</p> Signup and view all the answers

Which component is used to isolate the charger in case of any fault?

<p>C1 (B)</p> Signup and view all the answers

What is the population of Lucknow according to the 2011 census?

<p>2.8 million (B)</p> Signup and view all the answers

What is the elevation of Lucknow above sea level?

<p>123 meters (A)</p> Signup and view all the answers

Which century saw Lucknow flourish as a cultural and artistic hub under the Nawabs?

<p>18th and 19th centuries (B)</p> Signup and view all the answers

What is the area of Lucknow in square miles as of December 2019?

<p>155 square miles (A)</p> Signup and view all the answers

More Like This

Use Quizgecko on...
Browser
Browser