Aviation Operator Regulations
6 Questions
1 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is required of an operator regarding inoperative instruments or equipment?

  • Ignore until the next scheduled maintenance
  • Inspect and rectify immediately
  • Seek approval for operation with inoperative items
  • Inspect, repair, replace, or remove at the next required inspection (correct)

What is the responsibility of an operator with regards to maintenance, overhaul, alterations, and repairs that affect airworthiness?

  • Delegate to maintenance personnel
  • Ensure they are performed according to the operator's preference
  • Perform them as per the Act or regulations made thereunder (correct)
  • Ensure they are performed as prescribed by the manufacturer

When should an operator ensure that a placard is installed on the aircraft?

  • When instructed by the manufacturer
  • When discrepancies are listed in the maintenance records (correct)
  • During the next scheduled maintenance
  • When inoperative instruments or equipment are discovered

What is the responsibility of an operator regarding the maintenance records?

<p>Ensure maintenance personnel make appropriate entries (A)</p> Signup and view all the answers

Under what circumstances can an operator ignore an inoperative instrument or item of equipment?

<p>When approved under an exception list (C)</p> Signup and view all the answers

What action should an operator take after maintenance has been accomplished satisfactorily and in accordance with prescribed methods?

<p>Complete and sign the certificate of release to service (A)</p> Signup and view all the answers
Use Quizgecko on...
Browser
Browser