Are You an Expert in WeLink Indoor Installation?

EngrossingTopaz avatar
EngrossingTopaz
·
·
Download

Start Quiz

Study Flashcards

36 Questions

What is the first step WeLink technicians must take before entering a customer's home?

Wear WeLink-issued shoe covers

What is the purpose of the wall grommet in the Seed indoor installation?

To provide a termination point for ethernet cable

Which type of line is terminated in the UPS for the Anchor indoor installation?

18/4 solid core line

What is the purpose of the Network Interface Device (NID) in the Anchor indoor installation?

To provide a termination point for ethernet cable

What is the difference in line requirements between the Seed and Anchor indoor installations?

The Anchor requires an 18/4 solid core line in addition to the cat5e cable

What is the final step in the Seed indoor installation?

Connecting the cat5e patch cable to the wifi router

What is the final step in the Anchor indoor installation?

Running the cat5e and 18/4 solid core line into the customer's location

What is the purpose of the Leaf Cube in the Leaf indoor installation?

To terminate the interior lines and connect to the eero gateway

What is required on the inside wall for the Leaf indoor installation?

A keystone jack with a shielded Cat5e Keystone

What is the difference in cable requirements between the Seed and Leaf indoor installations?

The Leaf requires a cat5e cable down the roof

What is the purpose of the 18/4 solid core line in the Anchor indoor installation?

To terminate the interior lines and connect to the eero gateway

What is the purpose of the cat5e patch cable in the Seed indoor installation?

To connect the keystone jack and the wifi router

What is the first step WeLink technicians must take before entering a customer's home?

Wear WeLink-issued shoe covers

What is the purpose of the wall grommet in the Seed indoor installation?

To provide a termination point for ethernet cable

Which type of line is terminated in the UPS for the Anchor indoor installation?

18/4 solid core line

What is the purpose of the Network Interface Device (NID) in the Anchor indoor installation?

To provide a termination point for ethernet cable

What is the difference in line requirements between the Seed and Anchor indoor installations?

The Anchor requires an 18/4 solid core line in addition to the cat5e cable

What is the final step in the Seed indoor installation?

Connecting the cat5e patch cable to the wifi router

What is the final step in the Anchor indoor installation?

Running the cat5e and 18/4 solid core line into the customer's location

What is the purpose of the Leaf Cube in the Leaf indoor installation?

To terminate the interior lines and connect to the eero gateway

What is required on the inside wall for the Leaf indoor installation?

A keystone jack with a shielded Cat5e Keystone

What is the difference in cable requirements between the Seed and Leaf indoor installations?

The Leaf requires a cat5e cable down the roof

What is the purpose of the 18/4 solid core line in the Anchor indoor installation?

To terminate the interior lines and connect to the eero gateway

What is the purpose of the cat5e patch cable in the Seed indoor installation?

To connect the keystone jack and the wifi router

What is the first step that WeLink technicians must take before entering a customer's home for indoor installation?

Wear WeLink-issued shoe covers

What is the difference between Seed and Anchor indoor installation?

Seed requires a cat5e and an 18/4 solid core line while Anchor requires only a cat5e line

What is the purpose of a wall grommet in indoor installation?

To follow all line run and line penetration standards

What type of cable is needed only between the keystone jack and the wifi router for Seed indoor installation?

Cat5e patch cable

What is the purpose of a Network Interface Device in indoor installation?

To provide a termination point for ethernet cable

What type of cable is required for Leaf indoor installation?

Cat5e cable

What type of line is terminated in the UPS for Anchor indoor installation?

18/4 solid core line

What is the power source for MBU in Seed indoor installation?

Dedicated power source inside the Seed UPS

What is the purpose of a keystone wall plate in indoor installation?

To terminate the interior lines and connect to the eero gateway

What is the difference between Seed and Leaf indoor installation?

Seed requires a cat5e and an 18/4 solid core line while Leaf requires only a cat5e line

What type of cable is needed between the MBU and the customer's preferred location for Anchor indoor installation?

Cat6 cable

What type of line is not required to have POE for indoor installation?

Cat5e customer line for Anchor

Study Notes

WeLink Indoor Installation Procedures

  • Indoor installation is a crucial step in providing internet services to customers' wifi and wired devices.
  • WeLink technicians are required to wear WeLink-issued shoe covers before entering a customer's home.
  • The Seed indoor installation involves running a cat5e cable from the MBU to the customer's preferred location, following all line run and line penetration standards.
  • A wall grommet is required on the outside wall and a keystone wall plate with a shielded Cat5e Keystone on the inside wall to terminate the interior lines and connect to the eero gateway.
  • A cat5e patch cable is needed only between the keystone jack and the wifi router.
  • No POE is required for the cat5e customer line for a Seed, as the MBU is powered via a dedicated power source inside the Seed UPS.
  • The Anchor indoor installation involves running a cat5e and an 18/4 solid core line from the MBU to the customer's preferred location, terminating the 18/4 in the UPS, and running another 18/4 along with the cat5e into the customer's location.
  • All line run and line penetration standards must be followed for the cat5e and 18/4 solid core line.
  • A wall grommet is required on the outside and interior walls before placing the Network Interface Device (NID), which converts AC power to 48V DC and provides a termination point for ethernet cable.
  • No POE is required for the cat5e customer line for an Anchor.
  • The Leaf indoor installation involves running a cat5e cable from the Leaf Cube down the roof and into the customer's preferred location.
  • A wall grommet is required on the outside wall and a keystone wall plate and cat5e keystone is required to be installed when terminating the interior lines and connecting to the eero gateway.

Test your knowledge of WeLink indoor installation procedures with this quiz! From Seed to Anchor to Leaf installations, this quiz covers the essential steps and standards for providing high-quality internet services to customers' wifi and wired devices. See how well you understand the process and ensure that you're following all the required steps to provide the best service possible.

Make Your Own Quizzes and Flashcards

Convert your notes into interactive study material.

Get started for free

More Quizzes Like This

Internet Services and Cyber Security Quiz
10 questions
Internet: Services and Impact
10 questions
Internet Services Quiz
24 questions
Use Quizgecko on...
Browser
Browser