Questions and Answers

What is the main goal of the book described in the text?

  • To provide a history of construction design
  • To present a method for compiling consistently accurate construction cost estimates (correct)
  • To introduce a new construction material
  • To simplify construction regulations

Which of the following is NOT described as a main project delivery system in the construction industry?

  • Design-build
  • Traditional design-bid-build
  • Construction management
  • Architectural design competition (correct)

What is the role of conceptual estimates in the cost-planning process?

  • Offer review and control capabilities
  • Provide detailed itemized costs
  • Act as initial rough order of magnitude estimates (correct)
  • Finalize the construction budget

What technology integration capability does the book aim to provide for construction cost estimating?

<p>Integration with the latest technology available (C)</p> Signup and view all the answers

What is the basis for most people and organizations deciding to build a project?

<p>Thorough analysis of value and cost (D)</p> Signup and view all the answers

How is the value of a proposed facility usually quantified?

<p>Through cost-benefit analysis (A)</p> Signup and view all the answers

How is monetary value typically determined in the cost-benefit analysis mentioned?

<p>Through present worth analysis or time value of money concepts (D)</p> Signup and view all the answers

What defines a feasible project according to the text?

<p>When benefits exceed the total estimated cost (B)</p> Signup and view all the answers

What is the stage where the contractor's markup is added and the bid documents are completed?

<p>Stage 6: Summary and Bid (B)</p> Signup and view all the answers

Why is detailed estimating considered the method of choice for bid preparation in the construction industry?

<p>It is more likely to produce an accurate forecast of actual costs. (D)</p> Signup and view all the answers

What is the basis of a detailed estimate in construction projects?

<p>Quantity takeoff obtained from the full project design (C)</p> Signup and view all the answers

Why are preliminary estimates usually prepared by quicker but less accurate methods?

<p>Because they require less time and effort. (C)</p> Signup and view all the answers