IAP Manual july 22 - Part 3
30 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

Which category of architectural experience requires 120 hours for Procurement and Contract Award?

  • Category B: Construction Administration (correct)
  • Category A: Design and Construction Documents
  • Category C: Management
  • Category D: Construction Phase - Office

What is the total number of architectural experience hours required to satisfy the IAP's requirements?

  • 3720 (correct)
  • 760
  • 2960
  • 900-1000

Which category of architectural experience involves Management of the Project?

  • Category D: Construction Phase - Office
  • Category B: Construction Administration
  • Category C: Management (correct)
  • Category A: Design and Construction Documents

What is the purpose of programming in the architectural process?

<p>To collect and analyze data (A)</p> Signup and view all the answers

Which of the following is the purpose of the Canadian Experience Record Book (CERB)?

<p>To provide a tool for recording architectural experience (A)</p> Signup and view all the answers

Who is responsible for maintaining a record of architectural experience in the CERB?

<p>The Recognized Student/Intern (C)</p> Signup and view all the answers

In what situations should the CERB be submitted for review?

<p>Both A and B (D)</p> Signup and view all the answers

What is the purpose of late submission review and assessment of architectural experience?

<p>To assess the nature and breadth of the experience (B)</p> Signup and view all the answers

Which of the following is a typical activity for an intern during the Schematic Design phase?

<p>Assist in the preparation of presentation drawings and models (B)</p> Signup and view all the answers

What is the main responsibility of the Architect during the Engineering Systems Integration phase?

<p>Coordinate all building systems, including engineering systems (C)</p> Signup and view all the answers

Which of the following is a typical activity for an intern during the Building Cost Analysis phase?

<p>Assist in reviewing shop drawings and evaluating samples (B)</p> Signup and view all the answers

What is the importance of reasonable cost estimates in the construction process?

<p>Influence decisions involving basic design and selection of building products (B)</p> Signup and view all the answers

Which of the following is NOT a typical required Intern Activity in the Envelope Detailing phase?

<p>Assist in developing various schedules and outline specifications for materials, finishes, fixed equipment, fixtures and updates to project schedule. (B)</p> Signup and view all the answers

Which of the following factors is NOT considered in the design of the building envelope?

<p>Size and character of the entire project (C)</p> Signup and view all the answers

Which method is typically used by Architects for preliminary analysis?

<p>Computation based on area and/or volume (B)</p> Signup and view all the answers

What do Architects typically use to estimate construction cost later in the design process?

<p>Quantity surveys (B)</p> Signup and view all the answers

Which of the following is NOT a typical required intern activity related to construction documents?

<p>Review and analyze bidding forms, lien provisions, supplementary and special conditions and obtain the client’s insurance and bonding requirements (D)</p> Signup and view all the answers

Which of the following is NOT a factor to be considered in the selection and evaluation of materials or products to be used in a project?

<p>Availability (A)</p> Signup and view all the answers

What is a fundamental principle of specification writing?

<p>Communicating the requirements of the construction process in a logical, orderly sequence (D)</p> Signup and view all the answers

What is an essential quality of construction documents?

<p>All of the above (D)</p> Signup and view all the answers

Which of the following is a key responsibility of the architect in document checking and coordination?

<p>Coordinating with other consultants (D)</p> Signup and view all the answers

What is the purpose of close coordination between drawings and specifications in construction documents?

<p>To eliminate conflicts between the work of different consultants (A)</p> Signup and view all the answers

When should the drawings be checked and cross-checked for accuracy and compatibility?

<p>Throughout the construction phase (B)</p> Signup and view all the answers

What is the significance of thorough project document coordination during construction?

<p>It facilitates smooth construction process (B)</p> Signup and view all the answers

Which phase(s) of a project does document checking and coordination occur?

<p>Throughout multiple phases of the project (B)</p> Signup and view all the answers

True or false: Close coordination between drawings and specifications is required when preparing construction documents.

<p>True (A)</p> Signup and view all the answers

True or false: The work of each consultant must be reviewed regularly and checked against the architectural drawings as well as the drawings of other consultants to eliminate conflicts.

<p>True (A)</p> Signup and view all the answers

True or false: Before final release for construction purposes, the drawings must be checked and cross-checked for accuracy and compatibility.

<p>True (A)</p> Signup and view all the answers

True or false: Thorough project document coordination is not crucial and does not have far-reaching significance during construction.

<p>False (B)</p> Signup and view all the answers

True or false: The role of the architect as a coordinating professional is not a key responsibility in document checking and coordination.

<p>False (B)</p> Signup and view all the answers

More Like This

IAP Manual july 22 - Part 1
30 questions
IAP Manual july 22 - Part 2
20 questions
IAP Room Entry Protocol
30 questions
IAP Immunization Schedule 2024
26 questions

IAP Immunization Schedule 2024

CharmingHeliotrope8332 avatar
CharmingHeliotrope8332
Use Quizgecko on...
Browser
Browser