IAP Manual july 22 - Part 3

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson
Download our mobile app to listen on the go
Get App

Questions and Answers

Which category of architectural experience requires 120 hours for Procurement and Contract Award?

  • Category B: Construction Administration (correct)
  • Category A: Design and Construction Documents
  • Category C: Management
  • Category D: Construction Phase - Office

What is the total number of architectural experience hours required to satisfy the IAP's requirements?

  • 3720 (correct)
  • 760
  • 2960
  • 900-1000

Which category of architectural experience involves Management of the Project?

  • Category D: Construction Phase - Office
  • Category B: Construction Administration
  • Category C: Management (correct)
  • Category A: Design and Construction Documents

What is the purpose of programming in the architectural process?

<p>To collect and analyze data (A)</p> Signup and view all the answers

Which of the following is the purpose of the Canadian Experience Record Book (CERB)?

<p>To provide a tool for recording architectural experience (A)</p> Signup and view all the answers

Who is responsible for maintaining a record of architectural experience in the CERB?

<p>The Recognized Student/Intern (C)</p> Signup and view all the answers

In what situations should the CERB be submitted for review?

<p>Both A and B (D)</p> Signup and view all the answers

What is the purpose of late submission review and assessment of architectural experience?

<p>To assess the nature and breadth of the experience (B)</p> Signup and view all the answers

Which of the following is a typical activity for an intern during the Schematic Design phase?

<p>Assist in the preparation of presentation drawings and models (B)</p> Signup and view all the answers

What is the main responsibility of the Architect during the Engineering Systems Integration phase?

<p>Coordinate all building systems, including engineering systems (C)</p> Signup and view all the answers

Which of the following is a typical activity for an intern during the Building Cost Analysis phase?

<p>Assist in reviewing shop drawings and evaluating samples (B)</p> Signup and view all the answers

What is the importance of reasonable cost estimates in the construction process?

<p>Influence decisions involving basic design and selection of building products (B)</p> Signup and view all the answers

Which of the following is NOT a typical required Intern Activity in the Envelope Detailing phase?

<p>Assist in developing various schedules and outline specifications for materials, finishes, fixed equipment, fixtures and updates to project schedule. (B)</p> Signup and view all the answers

Which of the following factors is NOT considered in the design of the building envelope?

<p>Size and character of the entire project (C)</p> Signup and view all the answers

Which method is typically used by Architects for preliminary analysis?

<p>Computation based on area and/or volume (B)</p> Signup and view all the answers

What do Architects typically use to estimate construction cost later in the design process?

<p>Quantity surveys (B)</p> Signup and view all the answers

Which of the following is NOT a typical required intern activity related to construction documents?

<p>Review and analyze bidding forms, lien provisions, supplementary and special conditions and obtain the client’s insurance and bonding requirements (D)</p> Signup and view all the answers

Which of the following is NOT a factor to be considered in the selection and evaluation of materials or products to be used in a project?

<p>Availability (A)</p> Signup and view all the answers

What is a fundamental principle of specification writing?

<p>Communicating the requirements of the construction process in a logical, orderly sequence (D)</p> Signup and view all the answers

What is an essential quality of construction documents?

<p>All of the above (D)</p> Signup and view all the answers

Which of the following is a key responsibility of the architect in document checking and coordination?

<p>Coordinating with other consultants (D)</p> Signup and view all the answers

What is the purpose of close coordination between drawings and specifications in construction documents?

<p>To eliminate conflicts between the work of different consultants (A)</p> Signup and view all the answers

When should the drawings be checked and cross-checked for accuracy and compatibility?

<p>Throughout the construction phase (B)</p> Signup and view all the answers

What is the significance of thorough project document coordination during construction?

<p>It facilitates smooth construction process (B)</p> Signup and view all the answers

Which phase(s) of a project does document checking and coordination occur?

<p>Throughout multiple phases of the project (B)</p> Signup and view all the answers

True or false: Close coordination between drawings and specifications is required when preparing construction documents.

<p>True (A)</p> Signup and view all the answers

True or false: The work of each consultant must be reviewed regularly and checked against the architectural drawings as well as the drawings of other consultants to eliminate conflicts.

<p>True (A)</p> Signup and view all the answers

True or false: Before final release for construction purposes, the drawings must be checked and cross-checked for accuracy and compatibility.

<p>True (A)</p> Signup and view all the answers

True or false: Thorough project document coordination is not crucial and does not have far-reaching significance during construction.

<p>False (B)</p> Signup and view all the answers

True or false: The role of the architect as a coordinating professional is not a key responsibility in document checking and coordination.

<p>False (B)</p> Signup and view all the answers

Flashcards are hidden until you start studying

More Like This

IAP Manual july 22 - Part 1
30 questions
IAP Manual july 22 - Part 2
20 questions
IAP Room Entry Protocol
30 questions
IAP Immunization Schedule 2024
26 questions

IAP Immunization Schedule 2024

CharmingHeliotrope8332 avatar
CharmingHeliotrope8332
Use Quizgecko on...
Browser
Browser