During which phase of the project is the selected scheme refined and developed in more detail?
Design Development
What is the term used to refer to the combination of the schematic design phase and the design development phase?
Preliminary Design
Why is it advantageous to obtain initial approval of the early concept from the client before proceeding to more specific design details?
To ensure the client's satisfaction
What do engineers and some clients often refer to as 'design'?
Construction Documents
In which language is the distinction between the three phases of design (schematic design, design development, and construction documentation) clear?
French
Which of the following is a purpose of an outline specification?
To review and obtain approval from the client and other stakeholders
What is a design report?
A tool for use by clients and other stakeholders
Which document describes the proposed materials and construction systems in general terms?
Outline specification
Who may find a design report useful?
All of the above
What is often included in a design report?
An analysis of the building with respect to compliance with the building code
Which of the following information should the architect provide to the structural engineer in order to commence design development?
The selected schematic design
What are some design issues that must be resolved with the structural engineer and the members of the design team through an Integrated Design Process?
All of the above
What type of information does the mechanical engineer require to undertake design development?
All of the above
During the design development phase, what does the mechanical engineer select and resolve?
All of the above
What information does the electrical engineer require to undertake the design development documents?
All of the above
During the design development phase, the architect is responsible for which of the following tasks?
Preparation of construction documents
What is one of the key factors that the architect should review when assessing the maintenance and durability of various materials during design development?
Cost and performance of the materials
What is the role of the consultants during the design development phase?
Coordinating the design work
What is the purpose of refining the design during the design development phase?
To minimize delays and coordination problems
When should collaboration with the engineers begin for a project?
During the schematic design phase
During the design development phase, the electrical engineer resolves design issues related to which of the following systems?
Lighting systems
What is the purpose of the lighting layouts developed by the architect and the electrical engineer during the design development phase?
To select light fixtures for the project
Which of the following consultants may be involved at the design development stage of a project?
All of the above
What permits and approvals are typically obtained during the design development phase?
Development permits
What type of estimate may be prepared during the design development phase by the architect or a cost consultant?
Updated estimate
True or false: An outline specification provides detailed information about the proposed materials and construction systems.
False
True or false: A design report is primarily used by the architect's office staff to better understand the design.
False
True or false: The design report may include an analysis of the building's compliance with the building code.
True
True or false: The design report is a contractual requirement for all projects.
False
True or false: The design report serves as a record for the project and can help with lengthy approval periods or delays.
True
Test Your Knowledge: What Information Should an Architect Provide to a Structural Engineer for Design Development?
Make Your Own Quizzes and Flashcards
Convert your notes into interactive study material.
Get started for free