Acciona Energía

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson
Download our mobile app to listen on the go
Get App

Questions and Answers

When was the first commercial wind farm in Spain installed?

  • December 1994 (correct)
  • January 1995
  • February 1996
  • November 1993

Which company installed the first commercial wind farm in Spain?

  • ACCIONA, S.A.
  • Energía Hidroeléctrica de Navarra, S.A. (correct)
  • Alabe company
  • Enel electric group

When did ACCIONA acquire the Energía Hidroeléctrica de Navarra, S.A. company?

  • 1995
  • 2003 and 2004 (correct)
  • 2009
  • 2000 and 2001

How much renewable assets did ACCIONA acquire in 2009 as part of the operation with the Enel electric group?

<p>More than two GW (gigawatts) (A)</p> Signup and view all the answers

When was ACCIONA Energía listed on the Madrid, Barcelona, Bilbao, and Valencia Stock Exchanges?

<p>July 1, 2021 (D)</p> Signup and view all the answers

Where is Acciona based?

<p>Madrid (C)</p> Signup and view all the answers

When did Acciona acquire the Energía Hidroeléctrica de Navarra, S.A. company?

<p>2003 (C)</p> Signup and view all the answers

What is the ticker symbol for Acciona Energía on the stock exchanges?

<p>ENE (A)</p> Signup and view all the answers

Who installed the first commercial wind farm in Spain?

<p>Energía Hidroeléctrica de Navarra, S.A. (C)</p> Signup and view all the answers

When was the KW Tarifa wind farm installed?

<p>1995 (C)</p> Signup and view all the answers

Flashcards are hidden until you start studying

Use Quizgecko on...
Browser
Browser