Podcast
Questions and Answers
When was the first commercial wind farm in Spain installed?
When was the first commercial wind farm in Spain installed?
- December 1994 (correct)
- January 1995
- February 1996
- November 1993
Which company installed the first commercial wind farm in Spain?
Which company installed the first commercial wind farm in Spain?
- ACCIONA, S.A.
- Energía Hidroeléctrica de Navarra, S.A. (correct)
- Alabe company
- Enel electric group
When did ACCIONA acquire the Energía Hidroeléctrica de Navarra, S.A. company?
When did ACCIONA acquire the Energía Hidroeléctrica de Navarra, S.A. company?
- 1995
- 2003 and 2004 (correct)
- 2009
- 2000 and 2001
How much renewable assets did ACCIONA acquire in 2009 as part of the operation with the Enel electric group?
How much renewable assets did ACCIONA acquire in 2009 as part of the operation with the Enel electric group?
When was ACCIONA Energía listed on the Madrid, Barcelona, Bilbao, and Valencia Stock Exchanges?
When was ACCIONA Energía listed on the Madrid, Barcelona, Bilbao, and Valencia Stock Exchanges?
Where is Acciona based?
Where is Acciona based?
When did Acciona acquire the Energía Hidroeléctrica de Navarra, S.A. company?
When did Acciona acquire the Energía Hidroeléctrica de Navarra, S.A. company?
What is the ticker symbol for Acciona Energía on the stock exchanges?
What is the ticker symbol for Acciona Energía on the stock exchanges?
Who installed the first commercial wind farm in Spain?
Who installed the first commercial wind farm in Spain?
When was the KW Tarifa wind farm installed?
When was the KW Tarifa wind farm installed?
Flashcards are hidden until you start studying