What should be done if internal corrosion is found in the coupon?

  • Remove the drilling machine from the isolation valve
  • Continue with the completion plug process
  • Immediately report it to the supervisor (correct)
  • Securely close the isolation valve

When should the completion plug be screwed into the fitting?

  • After removing the drilling machine
  • Before examining the coupon
  • Before attaching the drilling machine
  • After advancing the inserting bar (correct)

What should be done after removing the drilling machine and machine adapter from the isolation valve?

  • Securely tighten completion plug
  • Clear pipe shavings and debris left from tapping operation (correct)
  • Open the isolation valve
  • Attach the drilling machine assembled with boring bar adapter

What should be done after attaching the isolation valve to the fitting?

<p>Fully open the isolation valve (B)</p> Signup and view all the answers

What should be done if the boring bar does not advance easily during the drilling operation?

<p>Continue cutting. The cut is not complete (D)</p> Signup and view all the answers

What should be done after the pilot drill contacts the pipe?

<p>Slightly retract the boring bar (C)</p> Signup and view all the answers

What should be done before operating the drilling machine?

<p>Thoroughly coat the cutter and pilot bit with cutting grease (C)</p> Signup and view all the answers

More Like This

Pipeline Function and Maintenance Quiz
4 questions
Pipeline apunte v o f
29 questions

Pipeline apunte v o f

LighterTheme9174 avatar
LighterTheme9174
Pipeline Gráfico en Transformaciones 3D
10 questions
Use Quizgecko on...
Browser
Browser