Hotel Land Use: Development Control Regulations

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Listen to an AI-generated conversation about this lesson
Download our mobile app to listen on the go
Get App

Questions and Answers

What is the primary land use designated for Plot 2-01-02 in the Colombo Port City Development Project?

  • Residential
  • Hotel (correct)
  • Commercial
  • Retail

According to the development control regulations, the building setback areas must be left unlandscaped.

False (B)

What is the maximum permissible Floor Area Ratio (FAR) for Plot 2-01-02?

3.0

The overall design of the development shall provide a distinctive, ______ environment within the site.

<p>garden-like</p>
Signup and view all the answers

Match the following development aspects to their respective requirements for Plot 2-01-02:

<p>Total Landscape Coverage = Minimum 45% of Plot Area Building Height = Maximum 80.0m Building Coverage = Maximum 60%</p>
Signup and view all the answers

To maintain access for firefighting and emergency service vehicles, what is the minimum width required for emergency vehicle access (EVA)?

<p>7.0m (B)</p>
Signup and view all the answers

The roof areas of the development should not be considered as part of the overall building design.

<p>False (B)</p>
Signup and view all the answers

What is the minimum setback distance required from the edge of the podium for towers?

<p>6.0m</p>
Signup and view all the answers

Night lighting design should maintain the amenity of ______ and ensure that light is directed away from residential units.

<p>residents</p>
Signup and view all the answers

Match the following utilities with their respective maximum discharge/demand for Plot 2-01-02:

<p>Water Demand = Max. 228m³/day Wastewater Discharge = Max. 183m³/day Power Demand = 3.87MW</p>
Signup and view all the answers

According to the regulations, what should the developer endeavor to minimize regarding the potable water supply system?

<p>The demand (C)</p>
Signup and view all the answers

Zero runoff of stormwater to adjoining plots is not required by the regulations.

<p>False (B)</p>
Signup and view all the answers

What is the minimum power factor developers should maintain at the point of connection with the service authority?

<p>0.95</p>
Signup and view all the answers

All buildings shall display information on ______ awareness and include guidance to building users on how to be more sustainable.

<p>sustainability</p>
Signup and view all the answers

Match the following maximum allowable water consumption/flow rates for household potable water consumption-related fixtures and fittings:

<p>Dual flush WC (low flush) = 3.03 litres Shower head (low flow) = 6.81 litres/min Washing machine/commercial = 45.42 litres/load</p>
Signup and view all the answers

What plant types are stipulated as NOT PERMITTED for planting along the building site boundary?

<p>Invasive plant species (D)</p>
Signup and view all the answers

For the Plantation zone between the building and the roadside; A Green Buffer Zone to road frontage implies planting must be a minimum width of 5.0m.

<p>False (B)</p>
Signup and view all the answers

To promote responsible management and reduce the opportunity for Mosquito breeding sites; what measure should hotel operators to be mindful of?

<p>standing water</p>
Signup and view all the answers

Where Sustainability measures are promoted for Hotel developments; the Policy/Management strategy must provide clearly defined roles & responsibilities plus set improvement ______.

<p>targets</p>
Signup and view all the answers

Hotels which are seeking to be promote health and social responsibility are encouraged to establish certain standards in their restaurants; please match those standards to the food.

<p>Menu = Indicate calories content Food advertised as 'healthy' = Contains at least 4 items Foods offered = Low in fat / salt / sugar</p>
Signup and view all the answers

Flashcards

Plot 2-01-02

Hotel land use in the Island Living District along the ocean front.

Island Living District

Primarily residential area with sea, beach, canal and central park.

25.0m building height

Maximum allowable height of the podium building.

Building setbacks

Building setback areas are landscaped as an extension of open spaces.

Signup and view all the flashcards

Landscaping Design

Design shall provide garden-like environment within the site

Signup and view all the flashcards

Pedestrian Access Routes

Maintained at a constant level

Signup and view all the flashcards

Roof Design

The roof areas of the development are to be considered the 'fifth' elevation

Signup and view all the flashcards

Vehicular access

To access the service areas, car parking areas, passenger drop-off/pick-up points

Signup and view all the flashcards

Vehicle Parking Provision

To provide sufficient vehicle parking spaces

Signup and view all the flashcards

Water Supply

Potable water installations shall comply with relevant authority and British code and standards.

Signup and view all the flashcards

Treat Effluent

Treat non-domestic effluent before discharging waste to domestic sewer.

Signup and view all the flashcards

Electrical Network

All electrical design must conform to authority requirements

Signup and view all the flashcards

Telecommunications System

Telecommunication network installations comply with regulations

Signup and view all the flashcards

Building Facade

The building must be accessible for cleaning

Signup and view all the flashcards

Storm Water Re-use

Storm water should be considered for irrigation and cooling.

Signup and view all the flashcards

Waste Facilities

Centralized solid waste facilities shall be on the plot and screened.

Signup and view all the flashcards

Waste Containers

Follow the standards of waste collectors

Signup and view all the flashcards

Above ground Landscaping

Plant vertical elements to provide green linking

Signup and view all the flashcards

Perimeter Screening

50% transparency is required

Signup and view all the flashcards

Airborne Contamination

Low volatile organic compounds, or VOC

Signup and view all the flashcards

Study Notes

Development Control Regulations: Hotel Land Use - Plot 2-01-02

  • Plot 2-01-02 is designated for hotel land use within the Island Living District, situated along the oceanfront.
  • The site covers an area of 24,911.34m².
  • It is located adjacent to the Community Park.

Vision for Future Development

  • The Island Living District prioritizes residential areas surrounded by leisure spaces like the sea, waterfront, beach, canal, and a central park.
  • The hotel offers a panoramic view of the Indian Ocean.
  • The area includes premium villa developments and low to medium residential buildings.
  • The vision for the plot is to establish a high-rise resort hotel with amenities for tourists and guests.

Plot Regulations - Urban Design for Plot 2-01-02

  • Land use is designated as Hotel.
  • Max FAR is 3.0.
  • Max building height is 80.0m.
  • Max building coverage is 60%.

Landscape Coverage

  • Requires a min of 45% of the plot area.
  • Ground Level Landscape requires a min of 20% of the plot area.

Mandatory Plot Development Controls: Building Height

  • The maximum allowable height for the podium building is 25.0m from the main plot access point.
  • The maximum allowable height for the tower is 80.0m from the main plot access point.

Building Setback

  • Building setback areas are landscaped as an extension of open spaces.
  • A minimum spacing between buildings varies.
  • There's a minimum 6.0m setback from the edge of the podium for towers.

Landscaping Requirement

  • The development's design should create a distinctive, garden-like environment with Landscape Replacement Areas.
  • The roofs of multi-story car parks (MSCP) and podiums should be landscaped.

Public Space

  • Any public space should have an open frontage to allow pedestrian access and visibility.

Pedestrian Network

  • Pedestrian footpaths must connect all buildings within the plot.

Outdoor Refreshment Areas (ORAs)

  • ORAs are allowed, intended for outdoor seating as an extension of restaurants or cafes.
  • ORAs should not compromise pedestrian circulation or traffic safety.
  • Structures, lightweight covers, shading devices, and furniture should enhance public spaces and complement the public realm.

Barrier-free Accessibility

  • All pedestrian access routes, including covered walkways and through-block pedestrian links, must maintain a constant platform level.
  • Level changes should be minimized and accommodated with ramps.

Basement Levels / Subterranean Structures

  • Basement levels and permanent subterranean structures are permitted.

Building Form and Massing

  • The development should respond appropriately to the surrounding context and contribute positively to the city's skyline.

Roofscape

  • The roof areas of the development are to be fully integrated as part of the overall building form.
  • All service areas, including Mechanical and Electrical (M&E) equipment and water tanks, should be located inside the building envelope.

Night Lighting

  • Night lighting should enhance the architectural expression.
  • Night lighting design should maintain the amenity of residents and be energy efficient.

Servicing and Vehicular Access

  • Vehicular access from the public street provides access to service areas, car parking, and passenger drop-off points, as indicated in the UD Control Plans.

Vehicle Parking Provision

  • Sufficient parking spaces for cars, motorcycles, coaches, and bicycles must be provided.
  • Car parking spaces may be located in multi-story car parks (MSCP) or in the basement.

Emergency Response

  • A 7.0m wide emergency vehicle access (EVA) must be maintained.
  • A clear path to the nearest open space or public park must be provided as the assembly area.

Plot Regulations - Utilities: Plot 2-01-02

  • Plot area is 24,911.34m².
  • Land use is Hotel.
  • Max FAR is 3.0.
  • Max Water Demand: 228m³/day.
  • Max Wastewater Discharge: 183m³/day.
  • Storm Water Discharge: 57,969m³/day.
  • Power Demand: 3.87MW.

Mandatory Plot Development Controls: Potable Water Supply

  • Supply to Site: A potable water connection with valve and endcap will be provided within the plot boundary.
  • Water Supply Technical Data: 24/7 water supply, and each plot gets one water supply connection.
  • Required Water Pressure: Minimum pressure of 2 bars or 20m head of pressure in the external infrastructure.

Waste Water

  • Waste Water Connection: A waste water main connection provided for each development with a single outfall point allocated near plot access.
  • Technical Data: Developer constructs and connects Final Inspection Manhole with infrastructure network, ensuring watertight connections.

Stormwater Drainage

  • Zero Runoff: Zero runoff of stormwater to adjoining plots and public spaces.
  • Stormwater Final Manhole: Developer constructs and connects Final Inspection Manhole within plot boundary, ensuring watertight.

Quality of Stormwater Discharge

  • Stormwater must be free from debris, grease, oil, sand, and other solid particulates.
  • Storm Water Reuse: Stormwater should be considered for irrigation, cooling, and flushing.

Irrigation and Fire Fighting System

  • Irrigation System: The building must have an irrigation system.
  • Firefighting System: Comply with fire department requirements.

Solid Waste Management

  • Facilities and Storage: Centralized waste facilities within the plot boundary and screened from public view.
  • Dedicated Facility: Waste facility at ground level accessible to collection vehicles.
  • Waste Identification: Solid waste should be clearly identified and coded.

Electrical Network

  • Electrical Authority: Designs must conform to the requirements.
  • The electrical supply provided to the plot boundary should follow BS/IEC and CEB Grid Codes.
  • Substation: Developer to provide and ensure 24/7 access.

Telecommunication

  • Telecommunications System: Telecommunication network installations must be compliant with telecommunication service provider regulations.
  • Connection to Plot: The developer shall supply the manhole.

Building Facade

  • General: The building envelope and appurtenances, including the exterior walls should be accessible for maintenance cleaning.
  • Facade Lighting: Night lighting installation for building facades should be located within development.

Aviation Lighting

  • Aviation Lighting to Buildings: Aircraft warning lights must be installed to meet the standards.

Landscape Planning Concept

  • The integration of on-site landscape with the Community Park 2 and beach open space is a key element.
  • Landscape treatment follows urban design principles for Landscape Replacement Areas that ensure a green linking characteristic.

Sustainability Concept

  • Standards must satisfy all mandatory requirements as specified in the DCR.
  • The developer shall seek a Sustainable Certification Scheme agreed with the relevant authority.

Household Potable Water Consumption

  • Low water consumption fixtures and fittings should be used.
  • Water consumption / flow rates are specified for dual flush toilets, shower heads, dishwashers, and washing machines.
  • Waterless urinals installed in common areas.

Mandatory Plot Development Controls

  • Waste management programs should be implemented.
  • Buildings should measure their energy consumption.
  • Sustainable design characteristics should be displayed.

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

Related Documents

More Like This

Hotel Front Office Operations Quiz
13 questions
Hotel Classification and Organizations
16 questions
Hotel Industry Performance Analysis
26 questions
Use Quizgecko on...
Browser
Browser